• Title/Summary/Keyword: Power supply plan

Search Result 215, Processing Time 0.026 seconds

Scenario Analysis of Natural Gas Demand for Electricity Generation in Korea (전력수급기본계획의 불확실성과 CO2 배출 목표를 고려한 발전용 천연가스 장기전망과 대책)

  • Park, Jong-Bae;Roh, Jea Hyung
    • The Transactions of The Korean Institute of Electrical Engineers
    • /
    • v.63 no.11
    • /
    • pp.1503-1510
    • /
    • 2014
  • This study organizes scenarios on the power supply plans and electricity load forecasts considering their uncertainties and estimates natural gas quantity for electricity generation, total electricity supply cost and air pollutant emission of each scenario. Also the analysis is performed to check the properness of government's natural gas demand forecast and the possibility of achieving the government's CO2 emission target with the current plan and other scenarios. In result, no scenario satisfies the government's CO2 emission target and the natural gas demand could be doubled to the government's forecast. As under-forecast of natural gas demand has caused the increased natural gas procurement cost, it is required to consider uncertainties of power plant construction plan and electricity demand forecast in forecasting the natural gas demand. In addition, it is found that CO2 emission target could be achieved by enlarging natural gas use and demand-side management without big increase of total costs.

A Study on the Reliability Evaluation of Start-up Power Supply in Fossil Power Plant by Minimal Cut-Set Method (최소 컷셋법에 의한 화력발전소 기동전원의 신뢰도 예측에 관한 연구)

  • Choe, Gyu-Sik
    • The Transactions of the Korean Institute of Electrical Engineers A
    • /
    • v.48 no.4
    • /
    • pp.358-364
    • /
    • 1999
  • The auxiliary transformers or start-up/stand-by transformer(s) are installed against the start-up and shut-down of generator and emergency status in fossil power plant. The on-site power supply configuration using these transformers must be determined, considering configuration requirements, site characteristics, reliability and availability severely because it is remarkably important for safety and ecfonomy of plant. The auxiliary or start-up/stand-by power supply configuration has been determined considering only safety requirements and construction cost until now in Korea. This paper presents general theorems for the reliability estimation and proposes 2-unit based 4 alternatives for the start-up power supply stystem of 500㎿ standardized fossil power plant. The reliability and unavailability of equipment, system and configuration are determined using minimal cut-set methodology. The optimized plan of 4 alternatives is determined based on this ultimate reliability and unavailability.

  • PDF

A Study of Traction Power System Reliability (철도 급전시스템 신뢰도 평가 연구)

  • Kim Hyungchul;Cha Jun-Min;Kim Jin-O;Han Moonseob
    • Proceedings of the KSR Conference
    • /
    • 2005.05a
    • /
    • pp.806-812
    • /
    • 2005
  • This paper proposes a new reliability evaluation for traction power system. The electric railway consists of traction power systems, various vehicles, operating equipment, track, overhead line and electric equipment. It is a fundamental function of traction power systems that supply customers with reasonable price, acceptable reliability and high quality power. In a general way, the power system reliability deals with the ability to satisfy load demands in supply capability or rating of every factor. On the other hand, the reliability of traction power systems has been focused on train time delay caused by power outage. In this paper, we make a selection optimum reliability indices for the reliability evaluation of electric traction power systems. The reliability study not only applies a plan for traction supply system after detecting the vulnerable point of existing traction supply systems but also makes a role in stable operating railway.

  • PDF

Assessment of Transmission Losses with The 7th Basic Plan of Long-term Electricity Supply and Demand (7차 전력수급계획에 따른 송전계통 손실 분석에 관한 연구)

  • Kim, Sung-Yul;Lee, Yeo-Jin
    • The Transactions of the Korean Institute of Electrical Engineers P
    • /
    • v.67 no.2
    • /
    • pp.112-118
    • /
    • 2018
  • In recent years, decentralized power have been increasing due to environmental problems, liberalization of electricity markets and technological developments. These changes have led to the evolution of power generation, transmission, and distribution into discrete sectors and the division of integrated power systems. Therefore, studies are underway to efficiently supply power and reduce losses to each sector's demand. This is a major concern for system planners and operators, as it accounts for a relatively high proportion of total power, with a transmission and distribution loss of 4-6%. Therefore, this paper analyzes the status of loss management based on the current transmission and distribution loss rate of each country and transmission loss management cases of each national power company, and proposes a loss rate prediction algorithm according to the long-term transmission system plan. The proposed algorithm predicts the demand-based long-term evolution and the loss rate of the grid to which the transmission plan is applied.

A Study on the Evaluation of the ESS Capacity of Considering for Charge-Discharge Characteristic and CO2 Emission in Jeju (배터리 충방전특성을 고려한 제주계통의 적정 ESS용량과 탄소배출량 산정에 관한 연구)

  • Ku, Bon-Hui;Cha, Jun-Min
    • The Transactions of The Korean Institute of Electrical Engineers
    • /
    • v.63 no.4
    • /
    • pp.455-460
    • /
    • 2014
  • South Korea's power consumption is increasing every year. For stable electric power supply, more generation facilities are needed. But it is not easy to build nuclear power generation facilities, so provision of renewable energy is thought of as the solution. For the system's stable management, practical use of energy storing system is needed. Currently, pumping up electric power station is considered most useful. In this study, we have calculated the least amount of energy storing device by considering the renewable energy, HVDC, and change in power for the appliance of ESS in Jeju system, according to The 6th Basic Plan for Long-term Electricity Supply and Demand. Also we have calculated the amount of the battery and about the load equalizing effect to use battery as power storing device. Finally, we have calculated the reduction of electricity generation and the reduction of $CO_2$ emission with this study.

Study of Phase Difference between Substations in Parallel Feeding Method (병렬급전에서 변전소간 전압위상차 검토)

  • Lee, Chang-Mu;Lee, Han-Min;Oh, Seo-Chan
    • Proceedings of the KSR Conference
    • /
    • 2007.05a
    • /
    • pp.858-863
    • /
    • 2007
  • With increase of load power the case it will not be able to supply the power which is necessary to the vehicle, it establishes dosage increase of main transformer of substation or power compensation equipment, and must supply the power which is necessary. But like this method the expense and the hour when it is considerable are necessary. As an alternative plan, if neighborhood substation can supply power through parallel feeding then it can supply power applying the equipment of existing. So we investigate the possibility of parallel feeding method between neighboring substations through measuring results of voltage phase difference and analysing feeding circuit,

  • PDF

A Study of Economic Efficiency and Environmental Performance Due to the Conversion of the 7th and 8th Basic Plan for Long-term Power Supply and Demand (제7차 및 제8차 전력수급기본계획 전원 구성 전환에 따른 경제성 및 환경성 변화 분석 연구)

  • Cho, Sungjin;Yoon, Teayeon;Kim, Yoon Kyung
    • Environmental and Resource Economics Review
    • /
    • v.28 no.2
    • /
    • pp.201-229
    • /
    • 2019
  • This paper estimates the effects of generation mix changes in the $7^{th}$ and $8^{th}$ Basic Plan for Long-term Power Supply and Demand from two aspects: economic efficiency through electricity prices and environmental performance through $CO_2$ and air pollutants(NOx, SOx, PM) emissions. Particularly, we examined additional generation mix conversion paths that take into account the trade-off between economic efficiency and environmental performance through scenario analysis. According to our results, the conversion from the $7^{th}$ plan to the $8^{th}$ plan should increase the electricity prices in the mid- and long-term, while reducing GHG and air pollutants emissions at the same time. The alternative generation mix that combines $7^{th}$ and $8^{th}$ plans shows that there exists a path to mitigate the trade-off between economic and environmental in the long-term. It will be next to impossible to derive a optimal generation mix that simultaneously considers the core values, such as supply stability, environmental performance, economic efficiency, energy safety and energy security, when establishing the power supply and demand plan. However, by exploring the effects of various generation mix paths and suggesting near-optimal paths, people can best choose their direction after weighhing all the paths when deciding on a forward-looking generation mix in the long term.

Preliminary Study of HTS-FCL Application in Distribution System (초전도 한류기의 배전계통 적용 기본검토)

  • Choi, Heung-Kwan;Yoon, Jae-Young;Kim, Jong-Yeul;Lee, Byong-Jun
    • Proceedings of the KIEE Conference
    • /
    • 2003.07a
    • /
    • pp.421-423
    • /
    • 2003
  • To prevent fault effect in supply of electric power distribution system and plan stable operation of electric power system, must control magnitude of fault current. Although there are various kinds of method to solvethis, approached from super conductivity Fault Current Limiter application viewpoint among them. High Temperature Superconductor-Fault Current Limiter (HTS-FCL) development is progressing according to HTS technology development, and system application is tried. For actual system application of such super conductivity FCL, so that can reflect special quality of actuality supply of electric power distribution system just as it is in this treatise supply of electric power system by two modelling do. Also, by simulation of HTS-FCL action and protection coordination with another equipment appliances, verified the effectiveness in supply of electric power system applying itself super conductivity FCL EMTDC dynamic characteristic model that is develope.

  • PDF

Energy Transition Policy and Social Costs of Power Generation in South Korea (에너지 전환정책과 발전의 사회적 비용 -제7차와 제8차 전력수급기본계획 비교-)

  • Kim, Kwang In;Kim, Hyunsook;Cho, In-Koo
    • Environmental and Resource Economics Review
    • /
    • v.28 no.1
    • /
    • pp.147-176
    • /
    • 2019
  • This paper uses research on the Levelized Cost of Electricity (LCOE) in South Korea to conduct a simulation analysis on the impact of nuclear power dependency and usage rates on the social costs of power generation. We compare the $7^{th}$ basic plan for long-term electricity supply and demand, which was designed to increase nuclear power generation, to the $8^{th}$ basic plan for long-term electricity supply and demand that decreased nuclear power generation and increased renewable energy generation in order to estimate changes in social costs and electricity rates according to the power generation mix. Our environmental generation mix simulation results indicate that social costs may increase by 22% within 10 years while direct generation cost and electricity rates based on generation and other production costs may increase by as much as 22% and 18%, respectively. Thus we confirm that the power generation mix from the $8^{th}$ basic plan for long-term electricity supply and demand compared to the $7^{th}$ plan increases social costs of generation, which include environmental external costs.

A Study on Safety Management Development Plan of Domestic City Gas Facility (국내 도시가스 시설의 안전관리 발전방안에 관한 연구)

  • 정원익;양광모;강경식
    • Journal of the Korea Safety Management & Science
    • /
    • v.6 no.2
    • /
    • pp.23-33
    • /
    • 2004
  • Domestic city gas is supplying in an about 10 million household on present 34 city gas companies because is begun to supply regularly after two 1980 years middle. But, result that focus on city gas supply spread and stable supply for supply area and neglects about safety problem, hundreds casualties such as Ahyun explosion accident and Deagu city gas explosion accident were reached in situation that occurred large size calamity occurs it is dizzliness. In the case of advanced nation, can see that accomplish system and progress that in technology after experience major accident. Therefore, grasp problem investigating safety actual conditions for city gas institution and study about solvable plan is required this. Also, must guide reform and level elevation of a domestic company safety technology through induction and development of safety technology that is suitable in supply, domestic real condition etc. Must help in power positivity that is full text executing high-quality safety education about step High firing mechanism safety technology than present safety education.