• Title/Summary/Keyword: Power equipment

Search Result 3,998, Processing Time 0.039 seconds

A study of Partial Discharge Condition Monitoring Equipment In the Ultra High Voltage Gas-Insulated Switchgear(GIS) for Digital Sub-station application (디지털 변전소 적용을 위한 초고압 GIS 부분방전 상태감시장치 개발 연구)

  • Kim, Young-Noh;Cho, Young-Jun;Choi, Chul-Gang;Hwang, Chul-Min;Choi, Jae-Ok;Gang, Chang-Won
    • Proceedings of the KIEE Conference
    • /
    • 2008.07a
    • /
    • pp.1380-1381
    • /
    • 2008
  • By applying the digital sub-station, the change of various protect and measuring equipments has been applying. This paper is analyzed that the development of GIS partial discharge condition monitoring equipment is suited to the electricity IT technology and digital sub-station. It's constitution apply to be able to suit the data to high rank for GIS partial discharge condition monitoring equipment that is suited digital sub-station and Watch-dog module that be able to monitor the inner communication of the GIS partial discharge equipment. And then it also be able to apply of GIS partial discharge equipment when digital sub-station is applied.

  • PDF

Making Decision of the Maintenance Priority of Power Distribution System using Time Varying Failure Rate and Interruption Cost

  • Chu, Cheol-Min;Kim, Jae-Chul;Yun, Sang-Yun
    • Journal of Electrical Engineering and Technology
    • /
    • v.4 no.1
    • /
    • pp.43-48
    • /
    • 2009
  • The purpose of the this paper is to make decision of the maintenance priority of power distribution system using Time-Varying Failure Rate(TVFR) with interruption cost. This paper emphasizes the practical use of the reliability indices and interruption cost. To make a decision of maintenance priority on power distribution system equipment, the quantification of the reliability level should be represented as a cost. In this paper, the TVFR of power distribution system equipment applied in this paper utilizes analytic method to use the historical data of KEPCO. From this result, the sensitivity analysis on TVFR of equipment was done for the priority, which represents that high priority of the equipment has more effect on system reliability, such as SAIDI or SAIFI, than other equipment. By this priority, the investment plan is established. In this result, customer interruption cost(CIC) could be extracted, and CIC is used as weighting factor to consider a importance of customer. After that, the result calculated the proposal method in this paper is compared with other priority method, such as lifetime, failure rate or only sensitivity.

Generalized Reliability Centered Maintenance Modeling Through Modified Semi-Markov Chain in Power System

  • Park, Geun-Pyo;Heo, Jae-Haeng;Lee, Sang-Seung;Yoon, Yong-Tae
    • Journal of Electrical Engineering and Technology
    • /
    • v.6 no.1
    • /
    • pp.25-31
    • /
    • 2011
  • The purpose of power system maintenance is to prevent equipment failure. The maintenance strategy should be designed to balance costs and benefits because frequent maintenance increases cost while infrequent maintenance can also be costly due to electricity outages. This paper proposes maintenance modeling of a power distribution system using reliability centered maintenance (RCM). The proposed method includes comprehensive equipment modeling and impact analysis to evaluate the effect of equipment faults. The problem of finding the optimum maintenance strategy is formulated in terms of dynamic programming. The applied power system is based on the RBTS Bus 2 model, and the results demonstrate the potential for designing a maintenance strategy using the proposed model.

Evaluation Standard of Cost-Effectiveness Analysis for Renew of Architectural Equipment in Public Building (공공건물 건축설비 갱신 계획시 비용-효율분석 평가기준에 관한 연구)

  • Jung, Soon-Sung
    • Journal of Power System Engineering
    • /
    • v.17 no.4
    • /
    • pp.131-138
    • /
    • 2013
  • The purpose of this study is to suggest the evaluation standard of cost-effectiveness analysis for renew of architectural equipment in public building. Evaluation items of cost-effectiveness analysis for renew of architectural equipment in public building were used life cycle cost, energy consumption(ton of oil equivalent), green house gas emissions(ton of carbon dioxide) and maximum power demand. Life cycle cost is the process of making an economic assessment of an item, area, system, or facility by considering all significant costs of ownership over an economic life, expressed in terms of equivalent costs. The essence of life cycle costing is the analysis of equivalent costs of various alternative proposals. The social concern with green house gas and maximum power demand of architectural equipment field has been growing for the last several years.

A Single-phase Harmonics Extraction Algorithm Based on the Principle of Trigonometric Orthogonal Functions

  • Yi, Hao;Zhuo, Fang;Wang, Feng;Li, Yu;Wang, Zhenxiong
    • Journal of Power Electronics
    • /
    • v.17 no.1
    • /
    • pp.253-261
    • /
    • 2017
  • For a single-phase active power filter (APF), designing a more efficient algorithm to guarantee accurate and fast harmonics extraction with a lower computing cost is still a meaningful topic. The common idea still employs a IRPT-based Park transform, which was originally designed for 3-phase applications. Therefore, an additional virtual signal generation (VSG) link is necessary when it is used in the single-phase condition. This method, with virtual signal generation and transform, is obviously not the most efficient one. Regarding this problem, this paper proposes a novel harmonics extraction algorithm to further improve efficiency. The new algorithm is based on the principle of trigonometric orthogonal functions (TOF), and its mathematical principle and physical meaning are introduced in detail. Its implementation and superiority in terms of computation efficiency are analyzed by comparing it with conventional methods. Finally, its effectiveness is well validated through detailed simulations and laboratory experiments.

Probabilistic Power Flow Studies Incorporating Correlations of PV Generation for Distribution Networks

  • Ren, Zhouyang;Yan, Wei;Zhao, Xia;Zhao, Xueqian;Yu, Juan
    • Journal of Electrical Engineering and Technology
    • /
    • v.9 no.2
    • /
    • pp.461-470
    • /
    • 2014
  • This paper presents a probabilistic power flow (PPF) analysis method for distribution network incorporating the randomness and correlation of photovoltaic (PV) generation. Based on the multivariate kernel density estimation theory, the probabilistic model of PV generation is proposed without any assumption of theoretical parametric distribution, which can accurately capture not only the randomness but also the correlation of PV resources at adjacent locations. The PPF method is developed by combining the proposed PV model and Monte Carlo technique to evaluate the influence of the randomness and correlation of PV generation on the performance of distribution networks. The historical power output data of three neighboring PV generators in Oregon, USA, and 34-bus/69-bus radial distribution networks are used to demonstrate the correctness, effectiveness, and application of the proposed PV model and PPF method.

Development of Equipment Measuring Insulation Resistance of High-Power Cables in Operation at Power Station (발전소에서 운전 중인 고전력 케이블의 절연저항의 변화를 감시하는 장치의 개발)

  • Um, Kee-Hong;Kim, Bo-Kyeong
    • The Journal of the Institute of Internet, Broadcasting and Communication
    • /
    • v.16 no.4
    • /
    • pp.159-164
    • /
    • 2016
  • In or to generate high electric power in increasing demand, power station should operate facilities to meet requirement. The scale of electric power equipment is increasing in both size and complexity. With unexpected accidents at power facilities or power stations happening, substantial socioeconomic losses in an industrial society is caused. A major cause of unexpected accidents is deterioration of dielectrics, isolating two conductors electrically. In order to detect the deterioration processes of power cables, the operation status of power cables should be monitored on a regular basis. We have invented and installed equipment at Korea Western Power Co., Ltd., located in Taean, in order to predict and prevent the deterioration status of dielectrics destruction of power cables. The main line in Y-connection to the secondary coils of transformer delivers electric power to the external devices. The equipment we developed is the one measuring insulation resistance of cables operation in on/off status with respect to the main line. We present the equipment in terms of operation and configuration of hardware side.

A Quantitative Evaluation and Comparison of Harmonic Elimination Algorithms Based on Moving Average Filter and Delayed Signal Cancellation in Phase Synchronization Applications

  • Xiong, Liansong;Zhuo, Fang;Wang, Feng;Liu, Xiaokang;Zhu, Minghua;Yi, Hao
    • Journal of Power Electronics
    • /
    • v.16 no.2
    • /
    • pp.717-730
    • /
    • 2016
  • The harmonic components of grid voltage result in oscillations of the calculated phase obtained via phase synchronization. This affects the security and stability of grid-connected converters. Moving average filter, delayed signal cancellation and their related harmonic elimination algorithms are major methods for such issues. However, all of the existing methods have their limitations in dealing with multiple harmonics issues. Furthermore, few studies have focused on a comparison and evaluation of these algorithms to achieve optimal algorithm selections in specific applications. In this paper, these algorithms are quantitatively analyzed based on the derived mathematical models. Moreover, an enhanced moving average filter and enhanced delayed signal cancellation algorithms, which are applicable for eliminating a group of selective harmonics with only one calculation block, are proposed. On this basis, both a comprehensive comparison and a quantitative evaluation of all of the aforementioned algorithms are made from several aspects, including response speed, required data storage size, sensitivity to sampling frequency, and elimination of random noise and harmonics. With the conclusions derived in this paper, better overall performance in terms of harmonic elimination can be achieved. In addition, experimental results under different conditions demonstrate the validity of this study.

Phase Shift Control for Series Active Voltage Quality Regulators

  • Xiao, Guochun;Teng, Guofei;Chen, Beihai;Zhang, Jixu
    • Journal of Power Electronics
    • /
    • v.12 no.4
    • /
    • pp.664-676
    • /
    • 2012
  • A phase shift algorithm based on the closed-loop control of dc-link voltage implemented on a series active voltage quality regulator (AVQR) is proposed in this paper. To avoid pumping-up the dc-link voltage, a general phase shift compensation strategy is applied. The relationships among the operation variables are discussed in detail, which is very important for guiding the design of both the main circuit and the control system. Then on the basis of an investigation of the dc-link voltage pumping-up from viewpoint of the active power flow, a novel phase shift control method based on the closed-loop of the dc-link voltage is proposed. This method can adjust the phase of the output voltage gradually and automatically according to the dc-link voltage variation without introducing a phase jump. The effectiveness of the proposed strategy is verified through simulations of a single-phase 5kVA prototype and laboratory experiments on both a single-phase 5kVA and a three-phase 15kVA prototype.