• Title/Summary/Keyword: Power Quality Cost

Search Result 433, Processing Time 0.036 seconds

Investigation and Analysis of Interruption Characteristics for Industrial Customers

  • Choi, Sang-Bong
    • Journal of the Korean Institute of Illuminating and Electrical Installation Engineers
    • /
    • v.21 no.4
    • /
    • pp.45-52
    • /
    • 2007
  • Electric power is an important element in any modern economy. The availability of a reliable power supply at a reasonable cost is important for the economic growth and development of a country. Electric power utilities throughout the world therefore strive to meet customer demands economically with high quality and reliability. As the power industry moves towards open competition, therefore, there has been a call for a methodology by which to evaluate power system reliability through the use of customer interruption characteristics. This paper presents the results of an investigation and analysis of interruption characteristics of an industrial customer in Korea. This study used a direct visit survey to determine the investigation and analysis of electric service quality and the characteristics of industrial customers in Korea. A customer survey conducted throughout Korea via personal interviews of 660 sample customers is presented here. Variation according to characteristics of interruption such as duration, time of day, frequency and day of interruption was also investigated

전력사업에서의 분리막 이용현황 및 전망

  • 박광규
    • Proceedings of the Membrane Society of Korea Conference
    • /
    • 1997.04a
    • /
    • pp.111-130
    • /
    • 1997
  • The lack of water resources is becoming worse due to water pollution with accelerated industrialzation and regional unbalanced distribution of water resources. In recent, the production water quality is decreasing because of the increased organic matters and soluble solids in the water sources for power plants. The purpose of this paper discribes the ststus and prospect of membrane application in electric power industry. So this study lies in developing a process which can produce high purity water by appluing RO(Reserve Osmosis) ahead of the IX(Ion Exchange) tower and evaluating the product water quality and the cost effectiveness. The capital and operating cost for the treatment of brackish water, sea water by RO were presented as a reference for the review on securing water source for the new plant site.

  • PDF

Practical Issues of Earned Value Management Systems (EVMS) for Nuclear Power Plant (NPP) Construction

  • Jung, Youngsoo;Kim, Sungrae;Moon, Byeong-Suk
    • International conference on construction engineering and project management
    • /
    • 2015.10a
    • /
    • pp.696-697
    • /
    • 2015
  • Cost, schedule, and quality are the three major performance indicators for any construction project. Under the globalized competition in the nuclear industry, researchers and practitioners have also explored a systemized and integrated management system for cost, schedule, and quality. In order to address this issue, the concept of earned value management system (EVMS) has been often utilized. However, implementing EVMS for a mega-project of nuclear power plant (NPP) construction requires extensive overhead efforts. Though previous studies proposed structures and methods for effective NPP EVMS, there has been no legitimate study for data collection strategy for practical implementation. In this context, the purpose of this paper is to develop an effective data collection strategy for NPP EVMS. Firstly, the barriers to practical NPP EVMS were identified based on literature review and expert interviews. Strategies for data collection were then developed based on different phases of project life cycle. This study focuses on the 'life-cycle integrated progress management system' for NPP construction from an owner's perspective Therefore, results of this study can be used as a guide for preparing request for proposals (RFP) of an NPP owner organization.

  • PDF

Design Considerations for Auto-Connected Multi-Pulse Rectiviers for High Power AC Motor Drives

  • ;Prasad N. Enjeti
    • The Transactions of the Korean Institute of Power Electronics
    • /
    • v.4 no.5
    • /
    • pp.413-422
    • /
    • 1999
  • Auto-connected multipulse(12/24pulse) rectifier schemes are cost effective methods for reducing line current hamonics in PWM drive systems. Employing these schemes to enhance utility power quality requires careful attention to several design considerations In particular, excursion of dc-link voltage at no load, effect of pre-existing voltage distortion, impedance mismatches, unequal diode drops on rectifier current sharing and performance, are fully analyzed, Several corrective measures to improve the performance of 12/24­pulse rectifier systems are also discussed. Finally, experimental results on a 460V, 60Hz 400kVA commercial ASD, retrofitted with 12/24pulse rectifier systems are discussed in detail.

  • PDF

Reassessment of SMES Application Studies and Systematic approach Method under Deregulation (전력계통 제어용 초전도에너지 저장장치(SMES)의 검토사례 분석과 전력시장에서의 적용방안)

  • Lee, Geun-Joon;Yoon, Y.B.;Hwang, S.D.
    • Proceedings of the KIEE Conference
    • /
    • 2003.11a
    • /
    • pp.54-56
    • /
    • 2003
  • With the advancement of superconductor materials, especially in HTC YBCO(Gen II), the feasibility of SMES in power systems become much higher than previous days application[1]. Also, with the de-regulation of electricity market, it is indispensable to have a proper estimation of power quality index and power quality cost calcluation mechanism to stabilize highly industrialized society and to vitalize the investment for electric power system. This paper suggests a comprehensive algorithm[2] to determine the policy of SMES investment with the PQ Indices[3] based on aggregated load CBEMA curve reflecting the voltage characteristics such as volatge sags and interruptions which make electric load in unstable operation.

  • PDF

Gird-interactive PV Generation System with Power Quality Control (전력품질개선기능을 갖는 계통 연계형 태양광 발전시스템)

  • Lee, Seong-Ryong;Jeon, Chil-Hwan;Ko, Sung-Hun;Cho, Ah-Ran
    • Proceedings of the KIEE Conference
    • /
    • 2006.07b
    • /
    • pp.994-995
    • /
    • 2006
  • This paper presents a grid-connected photovoltaic (PV) system with direct coupled power quality control (PQC) algorithm, which uses an inner current control loop (PRT : polarized ramp time) and outer feedback control loop to improve grid power quality and maximum power point tracking (MPPT) of PV arrays. To reduce the complexity, cost and number of power conversions, which results in higher efficiency, single stage CCVSI (Current Controlled Voltage Source Inverter) is used. The proposed system operation has been divided into two modes (sunny and night). In night mode, the proposed system operates to compensate the reactive power demanded by nonlinear or variation in loads. in sunny mode, the proposed system performs PQC to reduce harmonic current and improve power factor as well as MPPT to supply active power from the PV arrays simultaneously. it is shown that the proposed system improves the system utilization factor to 100% which is generally low for PV system (20%). To verify the proposed system, a comprehensive evaluation with theoretical analysis and simulation results are presented.

  • PDF

The High-frequency Induction-heating application for 2700kW power (2700kW급 고주파 유도 가열 장치의 시작)

  • 이영호;김용환;이광수;이현우
    • Proceedings of the KIPE Conference
    • /
    • 1998.07a
    • /
    • pp.171-174
    • /
    • 1998
  • The development of the high-frequency induction-heating for 2700kW power range intend to make localization at forging and rolling mill part by technical innovation. And, the development makes to increase our's competitive power at technique, quality and cost. This paper describes the heart of high-frequency induction-heating technique, switching technique, a few problem in common using as an unsatisfied technique, load adjustment technique, system control, diagnostic system, and auto-interface etc.

  • PDF

Cases Studies on Total Productive Management and Competitive Advantages

  • Li, Chang-Chung;Tsai, Ping-Chen
    • International Journal of Quality Innovation
    • /
    • v.2 no.1
    • /
    • pp.106-116
    • /
    • 2001
  • The purpose of business strategy is to achieve competitive advantages which includes higher efficiency, better quality, more innovation and faster customer response. In other words, The business strategy is to build unique capability of lower cost and/or differentiation. In production aspect, unique capability means better production power with better performance at 3M(Man, Machine, Material) of input and PQCDSM (Product, Quality, Cost, Delivery, Safety, Moral) from output. The Total Productive management (TPM), a series of improvement activities focused on reduction of equipment loss, is a tool to establish business competitive advantages. In this paper, several domestic companies who won the Japan TPM Award have been studied. It is found that there is a strong cause-effect relationship between TPM and competitive advantages because. 1. TPM can change employees mindset effectively. 2. TPM can upgrade employees capabilities. 3. TPM can lead to excellent productivity.

  • PDF

Methods of Reviewing Constructability of Nuclear Power Plants Utilizing a Data-based Technology

  • Kim, Woo Joong;Lim, Byung Ki;Byon, SuJin
    • International conference on construction engineering and project management
    • /
    • 2015.10a
    • /
    • pp.147-149
    • /
    • 2015
  • A nuclear power plant construction project normally involves a large construction work of which the total project cost is over 5 trillion Won, Such a large-scale construction project has the risks of schedule delay and quality degradation due to increase in project cost, because designs are changed due to design errors. The reasons for design changes during installation are 1) insufficient engineering capability of the owner, 2) information discontinuance due to the multiple package method, and 3) inefficient constructability review processes. Accordingly, this study proposes, through problem analysis, a method of developing a constructability review system that utilizes constructability review processes and a data-based technology (3D modeling) that are optimized for nuclear power plant construction projects. It also presents a method of establishing a system for reviewing constructability in which constructability review processes and a Database (3D model, Schedule, Design change Items) are linked each other.

  • PDF

Low-power VLSI Architecture Design for Image Scaler and Coefficients Optimization (영상 스케일러의 저전력 VLSI 구조 설계 및 계수 최적화)

  • Han, Jae-Young;Lee, Seong-Won
    • Journal of the Institute of Electronics Engineers of Korea SD
    • /
    • v.47 no.6
    • /
    • pp.22-34
    • /
    • 2010
  • Existing image scalers generally adopt simple interpolation methods such as bilinear method to take cost-benefit, or highly complex architectures to achieve high quality resulting images. However, demands for a low power, low cost, and high performance image scaler become more important because of emerging high quality mobile contents. In this paper we propose the novel low power hardware architecture for a high quality raster scan image scaler. The proposed scaler architecture enhances the existing cubic interpolation look-up table architecture by reducing and optimizing memory access and hardware components. The input data buffer of existing image scaler is replaced with line memories to reduce the number of memory access that is critical to power consumption. The cubic interpolation formula used in existing look-up table architecture is also rearranged to reduce the number of the multipliers and look-up table size. Finally we analyze the optimized parameter sets of look-up table, which is a trade-off between quality of result image and hardware size.