Methods of Reviewing Constructability of Nuclear Power Plants Utilizing a Data-based Technology

  • Published : 2015.10.11

Abstract

A nuclear power plant construction project normally involves a large construction work of which the total project cost is over 5 trillion Won, Such a large-scale construction project has the risks of schedule delay and quality degradation due to increase in project cost, because designs are changed due to design errors. The reasons for design changes during installation are 1) insufficient engineering capability of the owner, 2) information discontinuance due to the multiple package method, and 3) inefficient constructability review processes. Accordingly, this study proposes, through problem analysis, a method of developing a constructability review system that utilizes constructability review processes and a data-based technology (3D modeling) that are optimized for nuclear power plant construction projects. It also presents a method of establishing a system for reviewing constructability in which constructability review processes and a Database (3D model, Schedule, Design change Items) are linked each other.

Keywords

Acknowledgement

This work was supported by the Development of process& System for NPP project management of the Korea Institute of Energy Technology Evaluation and Planning(KETEP) grant funded by the Korea government Ministry of Knowledge Economy.(No.2014151010171C)