Ion Effects of HVDC ±500 kV Double Bipole Overhead Transmission Line with Metallic Return Conductor Using Full-scale Test Line (실증시험선로를 이용한 도체귀로형 HVDC ±500 kV Double Bipole 가공송전선로의 이온류 특성 평가)

  • Shin, Kooyong;Kwon, Gumin;Ju, Munno;Woo, Jeong Min
    • KEPCO Journal on Electric Power and Energy
    • /
    • v.5 no.4
    • /
    • pp.249-256
    • /
    • 2019
  • A full-scale test line was established to verify the electrical environmental interferences caused by the HVDC ±500 kV Double Bipole overhead transmission line with metallic return conductor, which is scheduled for construction in Korea and the fullscale test was conducted for one year. And through the human perception test of the DC electric-field under the HVDC Double Bipole line, the threshold value at which the human detects DC electric field was investigated to verify the validity of the design guide for the HVDC ±500 kV Double Bipole overhead transmission line. The polarity configuration of the HVDC ±500 kV Double Bipole test line was arranged diagonally with the same polarity in terms of the electrical environment disturbance and operation. The test line utilized the 6-bundle arrangement to prevent the corona discharge taking into account the domestic social acceptability. The test results show that the HVDC ±500 kV Double Bipole transmission line generated very little corona discharge from the conductors. Therefore, both DC electric field and ion current density met the domestic design guide for DC overhead transmission lines. Also, the human perception test of DC electric fields under the test line showed that 70% of participants did not recognize the DC electric field even when exposed to 23 kV/m.

Analysis and Countermeasure of Lighting Fault on 765kV Transmission Lines (765kV 송전선로 낙뢰고장 분석 및 대책)

  • Min, Byeong-Wook;Lee, Sung-Hak;Kim, Ho-Ki;Kang, Yeon-Woog;Bang, Hang-Kwon;Park, Jae-Ung
    • Proceedings of the KIEE Conference
    • /
    • 2008.07a
    • /
    • pp.337-338
    • /
    • 2008
  • KEPCO has built, for the first time in the world, 765㎸ double circuit transmission lines which use vertically arranged phase conductor, while 765㎸ transmission lines in other countries are single circuit lines and use horizontally arranged phase conductor. System operating voltage, switching overvoltage, and lightning overvoltage were considered in determining the air gap. Recently, however, lightning outage rate of some 765㎸ transmission lines in KOREA shows that it is more than what is expected. Lightning fault of 765㎸ transmission lines is mostly single phase grounding fault which can be reclosed. But it still needs to be carefully managed, for the bulk system like 765㎸ transmission lines have huge effects on whole power system. This paper introduces analysis and countermeasure of KEPCO's 765㎸ transmission line lightning outage.

  • PDF

Field Observation and Analysis of Wind-Induced Vibrations in Four-Bundled Conductor Transmission Lines

  • Sohn, Hong-Kwan;Lee, Hyung-Kwon;Chu, Jang-Hee;Lee, Dong-Il;Lee, Eun-Woong
    • KIEE International Transactions on Power Engineering
    • /
    • v.3A no.2
    • /
    • pp.109-114
    • /
    • 2003
  • This paper presents observations made on four-bundled conductor transmission lines concerning the behavior of conductors under the effect of natural winds. To know the wind-induced vibration status and how to control it, wind-induced vibrations have been recorded and analyzed from the real transmission lines. From the field observation and analysis results, subspan oscillation was found to be the main type of vibration. In addition, the data also revealed some common characteristics of the observation sites with high maintenance rates. The results will be used in controlling the subspan oscillations and protecting the conductors.

Study on Power Line Coupler for Auxiliary Power to Overhead Line (철도 전차선의 보조전원을 위한 전력선 커플러 연구)

  • Lee, Gunbok;Yi, Kyung-Pyo;Kim, Myung Yong;Lee, Su Gil;Chang, Sang Hoon
    • The Journal of Korean Institute of Electromagnetic Engineering and Science
    • /
    • v.29 no.7
    • /
    • pp.566-569
    • /
    • 2018
  • A power line coupler that can apply high-frequency power to a railway overhead line structure was analyzed. It is difficult to supply auxiliary power to an overhead line in a high-voltage environment, and doing so requires a long-distance transfer. A method is proposed that utilizes the resonance on the Rogowski coil, which does not use a magnetic core. A simple overhead line structure was fabricated that consisted of a contact wire, messenger wire, and dropper. Couplers of various sizes were fabricated and deployed on the messenger wire, and the transfer characteristics of the two couplers were compared at a distance. As a result of applying the matching circuit to the coupler, the transmission efficiency was 53% at a distance of 2.5 m. The proposed method shows that it is possible to apply the auxiliary power by using the existing conductor in a special structure, such as the overhead line.

A Study on Characteristics of Overhead Rigid Conductor System for Developing the High-speed System up to 250km/h (250km/h급 강체전차선로 시스템 개발을 위한 R-BAR 특성 고찰)

  • Bae, Sang-Joon;Jang, Kwang-Dong;Lee, Ki-Won;Park, Youn-Cheol
    • The Transactions of The Korean Institute of Electrical Engineers
    • /
    • v.64 no.3
    • /
    • pp.492-497
    • /
    • 2015
  • An overhead rigid conductor system is mainly applied to the subway and recently studies on the rigid system have been conducted for applications such as tunnels of high-speed line and speed improvement of a conventional lines up to 250km/h. Power feeding performance which is the most important in a rigid system can be measured by contact force and characteristics of this contact force are related to the shape and material of the R-BAR. In this paper, we analyze the measurements of contact force, current heating temperature, impedance of a rigid conductor which was developed in Korea, after that we compare static characteristics of home and abroad rigid conductors which have various shapes and materials.

Partial Discharge Measurement for 154kV XLPE Cable Line (154kV XLPE 케이블 실선로 부분방전 검출)

  • Kim, C.S.;Lee, J.S.;Kim, J.C.;Park, C.G.;Seok, K.H.;Kim, W.N.
    • Proceedings of the KIEE Conference
    • /
    • 2004.11a
    • /
    • pp.23-25
    • /
    • 2004
  • HFPD(High Frequency Partial Discharge) measurement has been widely performed to diagnose cable system in the world. Shin-Yeongdeungpo 345kV XLPE line was successfully diagnosed by PD measurement methode last year. Moreover, aged power cable lines which were installed 15 years ago have been tested from this year. In this paper, the result of PD diagnosis for aged 154kV cable line is reported. The PD pattern from TMJ which was monitored by PD measurement system for several days showed typical void pattern. The joint was replaced and voids between semi-conductor layer and insulating layer in the joint was founded.

  • PDF

Development and Application of Pre/Post-processor to EMTP for Sequence Impedance Analysis of Underground Transmission Cables (지중 송전선로 대칭분 임피던스 해석을 위한 EMTP 전후처리기 개발과 활용)

  • Choi, Jong-Kee;Jang, Byung-Tae;An, Yong-Ho;Choi, Sang-Kyu;Lee, Myoung-Hee
    • The Transactions of The Korean Institute of Electrical Engineers
    • /
    • v.63 no.10
    • /
    • pp.1364-1370
    • /
    • 2014
  • Power system fault analysis has been based on symmetrical component method, which describes power system elements by positive, negative and zero sequence impedance. Obtaining accurate line impedances as possible are very important for estimating fault current magnitude and setting distance relay accurately. Especially, accurate calculation of zero sequence impedance is important because most of transmission line faults are line-to-ground faults, not balanced three-phase fault. Since KEPCO has started measuring of transmission line impedance at 2005, it has been revealed that the measured and calculated line impedances are well agreed within reasonable accuracy. In case of underground transmission lines, however, large discrepancies in zero sequence impedance were observed occasionally. Since zero sequence impedance is an important input data for distance relay to locate faulted point correctly, it is urgently required to analyze, detect and consider countermeasures to the source of these discrepancies. In this paper, development of pre/post processor to ATP (Alternative Transient Program) version of EMTP (Electro-Magnetic Transient Program) for sequence impedance calculation was described. With the developed processor ATP-cable, effects of ground resistance and ECC (Earth Continuity Conductor) on sequence impedance were analyzed.

A Signal Anti-reduction System in PLC using Ferrite Core and Switching Amplifier (페라이트 코어와 스위칭 증폭기를 이용한 PLC 신호 감쇠 저하 시스템)

  • 고종선;김영일;김규겸
    • The Transactions of the Korean Institute of Power Electronics
    • /
    • v.6 no.6
    • /
    • pp.474-480
    • /
    • 2001
  • In this paper a low signal reduction communication system that does not use the communication line but power line is presented It will be very useful for an information-oriented society with tele-metering and home automation. The conventional system has a difficulty in transmitting information due to decreasing communication voltage. The proposed system employs a special type switching amplifier system which has a low inner resistance and uses high efficient ferrite core in coupling circuit. This new system is proposed to reduce the loss of conductor load and coupling circuit in a PLC system.

  • PDF

Arc Fusion Protection of Covered Conductors Using AFPD (섬락 단선 방지 장치에 의한 피복 절연 가공배전 선로의 유도뢰애 의한 단선 방지)

  • Lee, Yong-Han;Jung, Dong-Hak;Ha, Bok-Nam;NamKung, Do;Kim, Myong-Soo
    • Proceedings of the KIEE Conference
    • /
    • 1997.07c
    • /
    • pp.800-802
    • /
    • 1997
  • After flashover occurs on the overhead distribution line by lighting strokes(direct or induced), the power frequency arc current continues. If lightning flashover occurs on the overhead lines using covered conductors, the power frequency art current with fixed path overheats the conductor, and arc fusion fault can be occurred. There are two categories protecting or reducing methods of arc fusion faults caused by lightning stokes. - Reducing lightning flashover rate : G/W, LA, etc. - Protection by AFPD(Arc Fusion Protection Device) : power follow current interruption. This paper presents lightning surge phenomena on overhead distribution lines and protecting performance of arc fusion Protection devices to the lightning strokes nearby overhead line.

  • PDF

Surge Analysis Considering Variation of Line Configuration Factor in Combined Distribution Systems with Power Cables (혼합배전계통 선로구성요소 변화를 고려한 선로 서지해석)

  • Kim, Byong-Sook;Lee, Jang-Geun;Han, Byoung-Sung;Lee, Jong-Beom
    • The Transactions of The Korean Institute of Electrical Engineers
    • /
    • v.56 no.3
    • /
    • pp.472-480
    • /
    • 2007
  • This paper analyzes overvoltage on testing line for various parameter effect examination. Model systems consist of overhead line and underground cable. The model considered actual characteristic data of distribution lines. and will be constructed at testing yard. The simulations were performed under various line configuration such as cable kinds, cable length, lightning wave, lightning wave time, transformer and branch circuits. The simulation models are established by EMTP/ATPDraw and Line Constants are calculated by ATP_LCC. When lightning surge strikes on conductor of overhead line, EMTP/ATPDraw calculates overvoltage in many cases. Simulation results will be compared with real testing results at testing yard. The compared results will be used to establish protection methods in actual underground distribution systems.