Surge Analysis Considering Variation of Line Configuration Factor in Combined Distribution Systems with Power Cables

혼합배전계통 선로구성요소 변화를 고려한 선로 서지해석

  • 김병숙 (한전 전력연구원 배전연구소) ;
  • 이장근 (원광대 대학원 전기공학과) ;
  • 한병성 (전북대 전자정보공학부) ;
  • 이종범 (원광대 전기전자및정보공학부)
  • Published : 2007.03.01

Abstract

This paper analyzes overvoltage on testing line for various parameter effect examination. Model systems consist of overhead line and underground cable. The model considered actual characteristic data of distribution lines. and will be constructed at testing yard. The simulations were performed under various line configuration such as cable kinds, cable length, lightning wave, lightning wave time, transformer and branch circuits. The simulation models are established by EMTP/ATPDraw and Line Constants are calculated by ATP_LCC. When lightning surge strikes on conductor of overhead line, EMTP/ATPDraw calculates overvoltage in many cases. Simulation results will be compared with real testing results at testing yard. The compared results will be used to establish protection methods in actual underground distribution systems.

Keywords

References

  1. 한국전력공사, '배전계통 절연협조 기준 정립에 관한 연구' 한국전력공사 배전처, 2003
  2. 한국전력공사, '배전선 절연설계에 관한 연구(I)' 한국전력공사 기술연구원, 1989
  3. 한국전력공사, '배전선 절연설계에 관한 연구(II)' 한국전력공사 기술연구원, 1992
  4. 한국전력공사, '배전계통 이상전압 측정 및 대책 연구' 2000
  5. M.H. Shwehdi A.S.,Farag, C. Belhadj, M.A. Aburaida 'LONG AND SHORT HIGH VOLTAGE CABLES EFFECTS ON TRANSIENT OVER VOLTAGES' Conference Record of the 1998 IEEE International Symposium on Electrical Insulation, Arlington, Virginia, USA, 1998
  6. 한국전력공사, '표준 구매시방서(2000-0133 단45 ES100-130)', 2000
  7. 한국전력공사, '표준 구매시방서(2000-0133 단45 ES140-900)', 2000
  8. 한국전력공사, '지중실무 I' 한국전력공사 중앙교육원, 2005
  9. 한국전력공사, '지중실무 III' 한국전력공사 중앙교육원, 2005
  10. 한국전력공사, '배전분야 설계기준-3500(접지공사)' 1999
  11. J.C. DAS 'Surge transference through transformers' IEEE INDUSTRY APPLICATION MAGAZINE SEPT/OCT 2003