  • A new system for evaluating the voltage management errors of distribution equipment is presented in this paper. The main concept of the new system is to use real distribution live-line voltage to evaluate and correct the voltage measurement data from distribution equipment. This new approach is suitable for a new Distribution Management System (DMS) which has been developed for a distribution power system due to the connection of distributed generation growth. The data from distribution equipment that is installed at distribution lines must be accurate for the performance of the DMS. The proposed system is expected to provide a solution for voltage measurement accuracy assessment for the reliable and efficient operation of the DMS. An experimental study on actual distribution equipment verifies that this voltage measurement accuracy assessment system can assess and calibrate the voltage measurement data from distribution equipment installed at the distribution line.

분산전원이 도입된 배전계통에 초전도전류제한기 적용에 따른 보호기기 동작분석 (Analysis on operation of Protective Equipment According to Application of SFCL in a Power Distribution System)

  • 이용석;정상현;임성훈
    • 대한전기학회:학술대회논문집
    • /
    • 대한전기학회 2011년도 제42회 하계학술대회
    • /
    • pp.67-68
    • /
    • 2011
  • This paper analysed a protective equipment in power distribution system linked distribution power system when a superconducting fault current limiter(SFCL) is installed. This paper focused on a recloser, because the recloser is a general protective equipment. When power distribution system linked distribution power system, a fault current is increased by adding fault current of distribution power system. The increased fault current makes many problems. But SFCLs are limiting fault current and help the protective equipment to operate normal process. We analysed the operation of protective equipment in power distribution system linked distribution power system with SFCLs.

  • PDF

신뢰도 평가를 위한 배전계통 설비기기 고장률 분석 (Power Distribution System Equipment Failure Rate Analysis for Reliability Estimation)

  • 이희태;김재철;문종필;박창호
    • 한국조명전기설비학회:학술대회논문집
    • /
    • 한국조명전기설비학회 2004년도 춘계학술대회 논문집
    • /
    • pp.370-373
    • /
    • 2004
  • The inside and outside of the country utilities considered that they focused energy and economic aspect for short-term in new environment change of restructure. but it need service reliability preservation and improvement countermeasure, that is no to use existent estimation method for reliability preservation. therefore, analyze the equipment failure rate for suitable reliability preservation through equipment failure rate analysis of power distribution r system and evaluated equipment that is composing power distribution system by the failure rate. This paper estimated failure causes and the TVFR(Time Varying Failure Rate) for main equipment that is composing power distribution system using Weibull distribution.

  • PDF

Making Decision of the Maintenance Priority of Power Distribution System using Time Varying Failure Rate and Interruption Cost

  • Chu, Cheol-Min;Kim, Jae-Chul;Yun, Sang-Yun
    • Journal of Electrical Engineering and Technology
    • /
    • 제4권1호
    • /
    • pp.43-48
    • /
    • 2009
  • The purpose of the this paper is to make decision of the maintenance priority of power distribution system using Time-Varying Failure Rate(TVFR) with interruption cost. This paper emphasizes the practical use of the reliability indices and interruption cost. To make a decision of maintenance priority on power distribution system equipment, the quantification of the reliability level should be represented as a cost. In this paper, the TVFR of power distribution system equipment applied in this paper utilizes analytic method to use the historical data of KEPCO. From this result, the sensitivity analysis on TVFR of equipment was done for the priority, which represents that high priority of the equipment has more effect on system reliability, such as SAIDI or SAIFI, than other equipment. By this priority, the investment plan is established. In this result, customer interruption cost(CIC) could be extracted, and CIC is used as weighting factor to consider a importance of customer. After that, the result calculated the proposal method in this paper is compared with other priority method, such as lifetime, failure rate or only sensitivity.

Probabilistic Power Flow Studies Incorporating Correlations of PV Generation for Distribution Networks

  • Ren, Zhouyang;Yan, Wei;Zhao, Xia;Zhao, Xueqian;Yu, Juan
    • Journal of Electrical Engineering and Technology
    • /
    • 제9권2호
    • /
    • pp.461-470
    • /
    • 2014
  • This paper presents a probabilistic power flow (PPF) analysis method for distribution network incorporating the randomness and correlation of photovoltaic (PV) generation. Based on the multivariate kernel density estimation theory, the probabilistic model of PV generation is proposed without any assumption of theoretical parametric distribution, which can accurately capture not only the randomness but also the correlation of PV resources at adjacent locations. The PPF method is developed by combining the proposed PV model and Monte Carlo technique to evaluate the influence of the randomness and correlation of PV generation on the performance of distribution networks. The historical power output data of three neighboring PV generators in Oregon, USA, and 34-bus/69-bus radial distribution networks are used to demonstrate the correctness, effectiveness, and application of the proposed PV model and PPF method.

시변 고장률을 이용한 배전계통 유지보수 우선순위 결정 (Deciding the Maintenance Priority of Power Distribution System using Time-varying Failure Rate)

  • 이희태;문종필;김재철
    • 대한전기학회논문지:전력기술부문A
    • /
    • 제55권11호
    • /
    • pp.476-484
    • /
    • 2006
  • The failure prediction and preventive maintenance for the equipment of nuclear power plant area using reliability-centered maintenance have been grown. On the other hand, the maintenance for power distribution system consists of time-based maintenance mainly. In this paper, the new maintenance algorithms for power distribution system are developed considering reliability indices. First of all, Time-varying failure rates are extracted from data accumulated at KEPCO using exponential distribution function and weibull distribution function. Next, based on the extracted failure rate, reliability for real power distribution system is evaluated for applying the effective maintenance algorithm which is the analytic method deciding the maintenance point of time and searching the feeder affecting the specific customer. Also the algorithm deciding the maintenance priority order are presented based on sensitivity analysis and equipment investment plan are analyzed through the presented algorithm at real power distribution system.

확률분포를 이용한 전력설비의 기대여명 추정 (Evaluation of life Expectancy of Power System Equipment Using Probability Distribution)

  • 김광원;현승호
    • 조명전기설비학회논문지
    • /
    • 제22권10호
    • /
    • pp.49-55
    • /
    • 2008
  • 본 논문은 확률분포를 이용하여 전력설비의 기대여명을 산출하는 방법을 제안한다. 전력설비의 기대여명이란 해당 설비의 잔존수명으로, 기대여명은 전력시스템의 보수계획, 설비교체계획, 신뢰도 평가에 유용하게 이용될 수 있다. 본 논문에서는 각 운전년수별로 향후 운전가능년수에 대한 누적확률을 계산하고, 계산한 누적확률로 누적확률분포함수모델의 모수를 결정한 후, 모델함수의 평균값을 구하여 기대여명을 산정한다. 제안한 방법에서는 정립한 누적확률분포함수모델을 이용하여 기대여명 뿐만 아니라, 향후 특정 운전년수에 이르기 위한 기대확률까지도 쉽게 구할 수 있다. 제안한 방법은 우리나라 복합화력 발전소 발전기의 기대여명 추정에 적용하여 그 효용성을 입증하였다.

지중배전선로의 다회로차단기 운영방안 연구 (The Study of Multi-Circuit Breaker Coordination in the Underground Distribution Line)

  • 조남훈;하복남;이흥호
    • 대한전기학회논문지:전력기술부문A
    • /
    • 제49권4호
    • /
    • pp.143-151
    • /
    • 2000
  • Electric power distribution feeders are susceptible to faults caused by a variety of situations such as adverse weather conditions, tree contacts, equipment failure, accidents, etc. Distribution circuit faults result in a number of problems related to the reliability of service and customer power quality. In the distribution line, the permanent interruption of customer service resulting from a blown fuse or a recloser lockout was the only factor which was used to determine service reliability. On underground distribution line, the serving of cables by earth-moving equipment is a prevalent cause of faults and the most cable faults quickly develop into bolted current. we introduce th multi-circuit breaker coordination methods in the Underground Distribution Line.

  • PDF

배전계통 기기 유지보수를 위한 RCM 모델 (Reliability-Centered Maintenance Model for Maintenance of Electric Power Distribution System Equipment)

  • 문종필;손진근
    • 전기학회논문지P
    • /
    • 제58권4호
    • /
    • pp.410-415
    • /
    • 2009
  • With the implementation of electric power industry reform, the utilities are looking for effective ways to improve the economic efficiency. One area in particular, the equipment maintenance, is being scrutinized for reducing costs while keeping a reasonable level of the reliability in the overall system. Here the conventional RCM requires the tradeoff between the upfront maintenance costs and the potential costs of losing loads. In this paper we describe the issues related to applying so-called the "Reliability-centered Maintenance" (RCM) method in managing electric power distribution equipment. The RCM method is especially useful as it explicitly incorporates the cost-tradeoff of interest, i.e. the upfront maintenance costs and the potential interruption costs, in determining which equipment to be maintained and how often. In comparison, the "Time-based Maintenance" (TBM) method, the traditional method widely used, only takes the lifetime of equipment into consideration. In this paper, the modified Markov model for maintenance is developed. First, the existing Markov model for maintenance is explained and analyzed about transformer and circuit breaker, so on. Second, developed model is introduced and described. This model has two different points compared with existing model: TVFR and nonlinear customer interruption cost (CIC). That is, normal stage at the middle of bathtub curve has not CFR but the gradual increasing failure rate and the unit cost of CIC is increasing as the interruption time is increasing. The results of case studies represent the optimal maintenance interval to maintain the equipment with minimum costs. A numerical example is presented for illustration purposes.

배전 계통의 고조파 측정 및 DB 구축에 대한 연구 (A study on the measurement of harmonics in the distribution system and the configuration of DB)

  • 박용업;강문호;조남훈
    • 대한전기학회:학술대회논문집
    • /
    • 대한전기학회 2006년도 제37회 하계학술대회 논문집 A
    • /
    • pp.202-203
    • /
    • 2006
  • The equipment using the Power electronic device is recently increased in the distribution system, so power utility and customers increase in concerning about harmonics level. Accordingly, The power utility which prepares a measure for the harmonic public standard and manege process must analysis of the harmonics level and the effect on equipment interconnecting distribution system. In the past, the measurement equipment and technique is imperfect, so very difficult to investigate the harmonics and trend. But the improvement of the measurement equipment recently is possible to obtain the data realtime for harmonic analysis. In this paper, we research the measuring domestic harmonic and constructing of DB based on the IEC standard.

  • PDF