The study of EPC System S/W based on the UI (EPC시스템에서 UI기반의 소프트웨어에 대한 고찰)

  • Hwang, Seong Ha;Yoo, Sun Il;Jeong, Jin Su
    • Journal of the Korean Society of Systems Engineering
    • /
    • v.6 no.1
    • /
    • pp.61-68
    • /
    • 2010
  • Generally EPC management system was simply management concept through the normal S/W. Our LNG Plant R&D Center wanted to the excellent management system from the S/W. So We developed the R&D management S/W and EPC management S/W Built in the Microsoft Project Server. Our system made to the customer Requirements. It was just User Interface protocol. But User Interface has more Weak position, because it makes from the MS Project Servers. Ms Projector server make easy to treat the project on the WBS. EPC parts mixed WBS and normally Ms SQL Database. It has very complicated Structures. Now We planed to make the general Database and Ms Project Server, It' means to the S/W Developer and Schedule Manager ability. We will successfully integrate R&D management system and EPC system and other softwares.

  • PDF

On the Analysis of Risk Management for a Utility Construction Work in Plant Projects (플랜트 유틸리티 시공에서 리스크 관리에 관한 연구)

  • Han, Ki-Don;Hur, Jin-Huek;Moon, Seung-Jae;Yoo, Hoseon
    • Plant Journal
    • /
    • v.6 no.1
    • /
    • pp.64-70
    • /
    • 2010
  • From 2000, the world plant market, especially plant developing business related to oil and gas, has been increasing. Domestic construction companies advance to overseas plant construction market actively, and proportioning to this, an importance of utility construction is increasing. However, the project becomes large and high-tech, and many companies experience difficulty of project management due to relatively high risk of overseas construction. In this study, we built the standard process with which domestic company can evaluate the risk of overseas plant utility construction. Primary factors for risk evaluation is derived, classification system is made out, primary factor is analyzed, and counter plan is suggested. And thorough management of risk is performed by risk management organization that manages the risks, risk control methods, reports and monitors through risk sheet and risk action log from the start of project to the end.

  • PDF

A study on the Impact of Project Logistics Riskon Overseas Plant Business Performance (프로젝트 물류 리스크가 해외 플랜트 사업성과에 미치는 영향에 관한 연구)

  • Eun-Jin Park;Jin-Ho Oh;Keun-Sik Park
    • Korea Trade Review
    • /
    • v.45 no.2
    • /
    • pp.191-209
    • /
    • 2020
  • Project logistics is becoming increasingly important in overseas plant projects. Efficient logistics risk management is needed to reduce construction period and reduce costs. However, Korean construction firms bid unconditionally without sufficient experience and analysis on overseas plants contract, companies are gradually losing profitability on projects due to not considering profitability. Despite the significant effects on the profitability of Korean construction companies, and although these companies still continue to bid on overseas plant projects, policies to manage project logistics risks for safe transport and compliance with the contracted building schedule in the long term is still lacking. Hence, this study investigates the risk factors related to project logistics and to analyze the effect of project logistics risk on overseas plant business performance. We conducted a survey of project-related workers. The results of the analysis are as follows: First, among the logistics risk factors, overseas platform business people recognize operational risk and financial risk factors, which have a positive effect directly on overseas plant performance. Second, the ability to manage project logistics risks can have a significant impact on the success or failure of overseas plants. Finally, if logistics risk factors are managed on the basis of the research results confirmed through empirical analysis, it is possible to carry out more efficient and effective management of the project, which implies that this will have a positive effect on overseas plant business performance.

Improved Scheme to Manage Engineering Man-hour in a Plant Project (플랜트 프로젝트에서의 설계시간 관리 기법 개선 방안에 관한 연구)

  • Shin, Ji-Roh;Moon, Seung-Jae;Lee, Jae-Heon
    • Plant Journal
    • /
    • v.5 no.1
    • /
    • pp.51-59
    • /
    • 2009
  • The global plant construction market has grown dramatically since 2000. As the market grows, domestic EPC contractors are expanding to meet its needs and have made great strides in terms of economic indicators from a decade ago. Larger projects involve a number of risk factors, such as volatile oil prices, however, and thus require quantitative and elaborate project management techniques for the ultimate success of a project's profitability. In addition, many Korean companies face difficulties in predicting potential risks and problems due to a lack of experience in dealing with the global market trend toward projects based on the Cost-re(Cost Reimbursable) contract as opposed to those based on the LSTK(Lumpsum Turnkey) contract. This study will examine methods and types of man-hour management according to plant project contract types. Further, it will explore the man-hour management system for successful completion of projects by satisfying the client's needs and enhancing the convenience in engineers' using the system. Additionally, this study will analyze the current system and identify its problems to address potential problems.

  • PDF

Development of Safety Management System Based on Location Determination Technology for Construction Workers in Nuclear Power Plant Construction Project (무선측위 기술을 활용한 원전 건설현장 인원 안전관리 시스템 개발 방안)

  • KIM, WooJoong;Lee, Sang-Hyun
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2016.05a
    • /
    • pp.239-240
    • /
    • 2016
  • The nuclear power plant construction project is a large-scale project that involved a daily maximum of thousands of workers. many equipment and laborers involved has been required consistently to minimize the need for safety through real-time safety management. But current nuclear power plant construction site is only managed to access of workers and equipments. The purpose of this study is the owner requirements reflects the characteristics of the nuclear power plant construction project integrated safety management system utilizing active RFID and GPS positioning technology.

  • PDF

Requirement Analysis for Development of EVMS in Nuclear Power Plant (원전건설 성과관리시스템(EVMS) 개발을 위한 요건 분석)

  • Won, Seo-Kyung;Park, Weon-Seob;Chong, Young-Whan;Kim, Jae-Yong;Kim, Yun-Myung
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2013.05a
    • /
    • pp.271-272
    • /
    • 2013
  • The Korean nuclear industry acquired technology for each construction stage including engineering, procurement, construction and commissioning from advanced nuclear countries. While the levels of technology and quality have greatly improved, the same cannot be said for the level of project management. In particular, the level of project performance measurement and forecasting project risk still remain at the single project management level. Thus, this paper reviewed the concept of the EVMS method and requirement for the system. The adoption of the EVMS, an advanced project management method, can enable efficient management of project risks and promote an adequate environment for project implementation.

  • PDF

Process Model for development of EVMS in Nuclear Power Plant Project (원전건설 성과관리시스템(EVMS) 개발을 위한 프로세스 모델 연구)

  • Kim, Yun-Myung;Won, Seo-Kyung;Shin, Il-Sub
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2014.05a
    • /
    • pp.58-59
    • /
    • 2014
  • EVM(Earned Value Management) is a management methodology for integrating scope, schedule and resources, and for objectively measuring project performance and progress. EVMS(Earned Value Management System) has been used for the performance measurement of R&D and construction projects in developed countries such as United States, United Kingdom and Australia. The nuclear power plant (NPP) projects in Korea have not applied EVMS. However, EVMS has come into request for overall schedule and cost risk management and performance measurement in overseas project of the nuclear power plant as a contractor. In this paper, based on the global EVMS guidelines, EVMS per unit processes have been developed for NPP projects. Moreover, using Business Process Management (BPM), it proposes an integrated process model with tasks, roles, and procedures for EVMS for NPP construction projects.

  • PDF

A Fundamental Research for Technology area of SCM in Korean Nuclear Power Plant Construction (원전건설 공급망관리 기술영역 도출을 위한 기초연구)

  • Park, Hang-Soon;Kim, Woo-Jung;Chong, Young-Whan;Won, Seo-Kyung
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2013.05a
    • /
    • pp.268-270
    • /
    • 2013
  • The construction project can be defined as a network combined between elements which are engineering, procurement, construction, start-up, and has a plenty of subjects and partners. For the successful project management in construction industry, it is necessary to adopt various management methods, such as lean production, information network system, SCM(Supply Chain Management), which can increase the efficiency of project management. During recent years, even though various management techniques have been applied, the SCM system has not formulated in construction industry. Especially, the Nuclear Power Plant Construction which requires high regulations of the safety and security has not applied SCM. Therefore, this study aimed to propose technology area of SCM in Korean Nuclear Power Plant Construction.

  • PDF

Development of a Conceptual Estimate Methodology for Plant Construction Projects (플랜트 건설 프로젝트를 위한 개산견적 방법론 개발)

  • Kim, Hyun-Joong;Choi, Jaehyun
    • Korean Journal of Construction Engineering and Management
    • /
    • v.20 no.1
    • /
    • pp.141-150
    • /
    • 2019
  • In the overseas plant construction market, the domain construction firms' construction capability has been greatly improved, but the capability of project management is evaluated to be insufficient compared to the technical aspect. Project management capabilities from the initial planning stage of project execution are regarded as the core competence of advanced construction companies. Among them, it is urgent to improve the capacity of conceptual estimate for domestic companies. In this study, the researchers surveyed and analyzed the methodology of estimating project cost in the planning phase of the plant project and developed an estimation method by conducting a case study analysis. Based on the logic of the cost index and parametric estimation method among the existing estimation methodology, the estimation tool was developed by deriving the input and output variables tailored to the plant project. The validity of the proposed methodology was evaluated by comparing the accuracy between the project estimate amount of the case project and the actual project amount. In order to increase the utilization of the developed conceptual estimate methodology,for plant construction project, it is necessary to systematize the data of the historical project data. Increasing the accuracy of future project cost estimates is directly related to increasing project award and profitability of the domestic construction company.

Outline of Standard Classifications for International Power Plant Construction (해외 발전소 건설의 효율화를 위한 표준분류체계 상위구조)

  • Kang, Mi-Yeon;Ha, Jiwon;Jung, Youngsoo
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2014.05a
    • /
    • pp.184-185
    • /
    • 2014
  • International construction contracts to Korean construction companies have been dramatically increased over the 48 years (Contract received worth 65.2 billion dollars in 2013). Especially, the plant construction sector has achieved about 61% among the 65.2 billion dollars. Under this trend, in order to ensure plant construction's competitiveness, 'standard classification' is an important area for systematic management. However, these standards in the plant construction are not widely utilized yet, in comparison with civil and building sectors. Therefore, in this research, a higher level of standard classifications is proposed for various types of power plants from a PMO's (Project Management Office) perspective. This study also provides a comparative analysis outlining different features and common components based on various types of power plants.

  • PDF