• Title/Summary/Keyword: Plant Project Management

검색결과 265건 처리시간 0.024초

Material Management Using Radio-Frequency Identification (RFID) in the Construction Industry

  • 김창완;허영기;권순욱
    • 한국건설관리학회논문집
    • /
    • 제5권1호
    • /
    • pp.107-113
    • /
    • 2004
  • The advent of Radio Frequency Identification (RFID) technology has created new opportunities for improving the material management function in the construction industry and is starting to provide major improvements in the efficiency of the material management process. The objective of the research reported herein was to introduce the benefits of RFID technology on material management in the construction industry. RFID technology is discussed and various aspects of this technology are investigated. Potential RFID applications on material management proposed by Construction Industry Institute (CII) Breakthrough Strategy Committee (BTSC) and Fully Integrated and Automated Technology (FIATECH) are spelled out Finally, business analysis of RFID to estimate its impact is provided. It is concluded that there is a significant potential for improvement of material management function in the construction industry through the use of RFID.

플랜트 건설사업의 모듈러 설계대안별 RVI 평가 모델 (Risk based Value Index Evaluation Model for Modular Design Alternatives in Plant Construction Projects)

  • 강현욱
    • 한국건설관리학회논문집
    • /
    • 제23권5호
    • /
    • pp.98-107
    • /
    • 2022
  • 본 연구의 목적은 플랜트 건설사업에서 모듈러 설계대안에 대한 위험기반의 평가지수를 도출하는 모델을 제안하는 것이다. 이에 따라 ① 기초사업비와 모듈을 적용하는 대상과 범위를 설정하는 단계, ② 설계, 구매, 제작, 운송, 시공업무에 대한 중요도, 편리성, 효율성 지수를 평가하는 단계, ③ 중요 위험사건의 영향에 따른 경제적 손실을 예방하기 위해서 필요한 예비비를 분석하여 총사업비를 추정하는 단계, ④ 모듈 설계대안별로 평가된 관리업무의 효율성 지수와 총사업비를 비교하여 RVI를 도출하는 단계로 구성하였다. 그리고 모델의 사용성을 검증하기 위해서 Module Plan-A는 Pipe Rack을 모듈로 적용하는 경우, Module Plan-B는 Steel Structure, Pipe Rack, Process Module을 모듈로 적용하는 경우로 설정하여 관리업무의 중요도, 편리성, 효율성 지수를 평가하고 위험예비비를 포함하여 총사업비를 추정하였다. 이와 같은 과정으로 모델을 검증한 결과, 1개의 공종에 모듈을 적용한 Module Plan-A 보다 3개의 공종에 모듈을 적용한 Module Plan-B가 관리업무의 효율성은 낮은 것으로 나타났지만, 기초사업비에서 간접비가 절감되어 종합적인 RVI는 높게 평가되었다.

구매엔지니어링 관리지원시스템 상세 설계 사례 연구 (Design of the Procurement Engineering Support System : A Case Study)

  • 김진일;염충섭;신중욱
    • 시스템엔지니어링학술지
    • /
    • 제14권2호
    • /
    • pp.33-40
    • /
    • 2018
  • This paper is based on the interim result of ongoing research and development project to develop a software system which support procurement activities, namely PeMSS (Procurement Engineering Management Support System). PeMSS is a system that enables development requirements for each equipment and help designing equipment meeting the purchase requirements. Procurement at EPC (Engineering Procurement and Construction) and operational stage of a plant is an important area that determines the integrity and profitability of the plant. Procurement of unsuitable equipment due to selection of suppliers that do not meet or omit critical requirements in purchase specification can result in enormous cost increase due to such as delay in EPC project, unsatisfactory performance and reduced plant operation time. In spite of the importance of the procurement engineering, there is a lack of support system for systematic preparation of purchase specification, so development of the procurement specification is basically relying on the experience of the engineers in charge. Accordingly, it is needed to develop the PeMSS to help procurement engineers develop procurement specification based on systems engineering approach. This paper introduces the design of the PeMSS.

LNG 플랜트 로지스틱스 단계의 효율적 정보관리를 위한 메타데이터 시스템 적용 방안 (Application of Metadata System for Efficient Information Management in Logistics of LNG plant)

  • 최창훈;원서경;한충희;이준복
    • 한국건설관리학회논문집
    • /
    • 제17권1호
    • /
    • pp.92-100
    • /
    • 2016
  • 다양한 분야에서 방대한 데이터를 효율적으로 정확하게 처리하고 데이터 처리 오류 및 처리속도를 최소화하기 위한 시스템을 적용하기 위하여 연구와 노력이 진행되고 있다. 이에 이 논문에서는 생애주기 전반에 걸쳐 방대한 데이터가 생성되는 LNG 플랜트 프로젝트 중 공사원가의 65~70% 이상을 차지하는 구매조달 단계의 Logistics 업무를 대상으로 업무 간 생성되는 데이터에 메타데이터를 적용함으로써 정보 검색 시 데이터 처리 오류 및 처리속도를 최소화할 수 있는 메타데이터 시스템을 적용하였다. 이러한 메타데이터 시스템을 통하여 정보 검색 시 시스템 사용자가 필요한 정보에 보다 정확하고 빠르게 접근할 수 있다

국내 건설사업관리 업무지침의 개선(안)에 관한 연구 (A Study on Proposal to improve Domestic Construction Management Service Guide)

  • 나광태;유붕열;강병희
    • 한국건축시공학회지
    • /
    • 제2권3호
    • /
    • pp.147-154
    • /
    • 2002
  • The Korean government makes an effort to raise the competitive power of nation through CM activation in the construction industry. Since the first CM service was applied to the atomic power plant project in 1986, the number of CM contracts are continuously being increased and will be up to 20% by 2002 in public sector. However, the public projects had been executed without any procedure manual or standard guideline of CM services. Meanwhile the Ministry of Construction and Transportation issued $\ulcorner$CM Service Guide$\lrcorner$, but the guide shows an indefinite description in the responsibility, authority and scope of activity for the project participants. Therefore, it is required the procedures be improved and scope of activities be established for the project participants. This study was generated from the comparative analysis of $\ulcorner$Standard CM Services and Practice$\lrcorner$ Published by CMAA and domestic $\ulcorner$CM Service Guide$\lrcorner$ and the case of Incheon International Airport construction. The purpose of this study is to provide the fundamental data for an improvement in the procedures of project execution and the construction manager's activities/rolls shown on $\ulcorner$CM Service Guide$\lrcorner$

조력발전사업에서의 환경적 영향 분석을 통한 환경·사회적 갈등 저감방안 (Reducing Plan of Environmental and Social Conflicts for Tidal Power Plant through the Analysis of Environmental Impact)

  • 안세웅;이희선
    • 환경영향평가
    • /
    • 제21권5호
    • /
    • pp.789-799
    • /
    • 2012
  • The major causes of environmental and social conflicts were analyzed through the samples of the construction and the management for tidal power plant abroad and inland. Based on the results, the eco-friendly and socially acceptable policy instruments for decreasing the scope and intensity of the conflicts were explored. Regarding environment issues, it was found that the tidal power project resulted in decreasing in tidal range and area of intertidal zone and in damaging to tidal flat and wetland conservation area. Also there are the characteristic change of tidal current and biological effect, etc. The major environmental and social conflicts were resulted from the distrust of environmental results to environmental impact assessment and prior environmental review and the distrust of project feasibility study, and insufficient activities of public participation. In this study, introduction to joint fact-finding(JFF) was reviewed as the measure of minimizing environmental and social conflicts.

Efficient recycling strategies for slurry TBM excavated soil

  • Sung-Min Nam;Joon-Shik Moon;Junyoung Ko;Hyoungseok Oh
    • Geomechanics and Engineering
    • /
    • 제38권6호
    • /
    • pp.603-609
    • /
    • 2024
  • In downtown subway project most of excavated soil is discarded externally, whereas in road construction excavated soil is used as filling material and management of surplus soil becomes important factor for success of the project. Excavated materials from slurry shield TBM are discharged through discharge pipe to slurry treatment plant and excavated soil mixed with bentonite are separated in separation plant by grain size. Fine material has been discarded together in filter cake without recycling. Its volume can vary according to geologic condition but statistically fine material as filter cake is about 5%~30% out of overall excavated volume. However, filter cake is non-toxic and can be recycled when mixed in the appropriate proportions with coarse aggregate. Therefore, in this study, utilization of excavated soil from a slurry shield TBM were examined and lab tests were conducted to find the proper way for mixing filter cake and aggregate to be recycled as fill material for road construction.

제지공장건설 수주를 위한 견적 의사결정지원시스템에 관한 연구 (A Study on the Estimate DSS for Bidding and Negotiation in the Paper Plant Construction Engineering)

  • 이규식;성기호;이성용
    • 한국경영과학회:학술대회논문집
    • /
    • 한국경영과학회/대한산업공학회 1999년도 춘계공동학술대회:정보화시대의 지식경영
    • /
    • pp.209-210
    • /
    • 1999
  • In the case of paper plant engineering company, one of the most important critical problems is to accurately estimate the cost and the delivery time of the project. This is necessary for the company to win a bidding and to have some room for negotiation. Moreover, the company needs to have time to process all the relevant informations to make timely response to, and deal with the changing conditions of the bidding environments as quickly as possible. One of the popular methodology dealing with this kind of situation is an effective "decision support system," and may researches are currently been done on this subject. In this article, and effective decision support system is developed which can provide automatic delivery time and cost estimates from which plant engineering company may be benefited.

  • PDF

e-Plant 포털 시스템 정보화 환경 및 SWOT 분석 (A Study on the Information Environment and SWOT Analysis of e-Plant Portal System)

  • 안장원;지상복;전용배
    • 한국건설관리학회:학술대회논문집
    • /
    • 한국건설관리학회 2006년도 정기학술발표대회 논문집
    • /
    • pp.539-542
    • /
    • 2006
  • 플랜트 산업의 수주실적이 늘어남에 따라 플랜트 프로젝트 관리 전반의 업무능력 향상이 요구되고 있고 이를 위해 정보화 기술에 대한 필요성이 증대되고 있다. 요구되는 정보화 기술을 위해서는 국내의 플랜트 관련 회사들의 부분적 또는 단위시스템별로 이루어진 정보화 현황들을 종합적인 시스템으로 개발함으로써 정보화기술에 대한 표준적인 방향제시 및 Tool과 노하우를 제공하는 체계적인 플랜트 종합정보 시스템 구축이 필요하다. 본 연구는 이와 같은 플랜트 산업의 추세를 반영하고 미래의 IT 기술 동향, 국내외 정보화 환경, 정책 동향 등을 분석하고 이를 통해 플랜트 정보 시스템의 SWOT 분석을 실시하여 대응방안을 제시함으로써 정보화 전략 및 목표를 설정하는 기초 연구를 수행하였으며, SWOT 분석에 따른 대응방안으로 (1) 플랜트 산업 인력을 배출할 수 있는 교육 콘텐츠의 개발, (2) 플랜트 관련 정보들에 대해 실시간으로 제공할 수 있는 통신 수단의 활용, (3) 다양하고 유용한 국내외 플랜트 지식을 제공하는 지식 활용 콘텐츠의 제공 등을 방안으로 제시하였다.

  • PDF

Algorithm-Aided BIM 기반 원전 3차원 설계기준 관리시스템 개발 (Development of AAB (Algorithm-Aided BIM) Based 3D Design Bases Management System in Nuclear Power Plant)

  • 신재섭
    • 한국건설관리학회논문집
    • /
    • 제20권2호
    • /
    • pp.28-36
    • /
    • 2019
  • 국내 신형원전 APR1400 (Advanced Power Reactor 1400MW)은 총 사업비 8조 6천억원, 사업기간 10년 이상이 소요되는 대형 국가기반시설이며, 60년 이상 운영되어 국가경제 및 국민의 안전에 밀접한 영향을 끼친다. 또한 총 사업부지 217만$m^2$내 20개 이상의건물 및 구조물로 구성되어 있으며, 건설에 필요한 전체도면은 약 6만5천장에 이른다. 이러한 대형시설의 설계를 위해서는 설계의도를 명확히 규정하여 일관성 있게 설계가 진행될 수 있는 일종의 가이드라인 역할을 하는 설계기준이 필수적이다. 이를 위해 설계기준(Design Bases)을 반영한 설계기준문서(Design Bases Document 또는 Drawing, DBD)를 작성하여, 설계 일관성 및 도면간의 일치성을 유지하고 있다. 하지만 설계기준은 원전 전체 설계에 큰 틀이 되는 중요한 개념임에도 불구하고 각 분야 전문가들에 의해 문서기반(2차원) 및 파편적으로 관리되다보니 후속설계에 정확히 반영되는데 한계가 있었다. 따라서 본 연구에서 시설정보 활용성을 높이기 위해 3차원 정보모델인 BIM (Building Information Model)과 Algorithm-aided BIM을 활용하여, 원전의 최소단위 공간인 실(Room)을 기반으로 한 3차원 설계기준 관리하는 시스템을 개발하였다. 이를 위해 설계기준정보층(DBIL)개념을 도입하였으며, 시뮬레이션을 통해 각 DBIL별 설계기준 속성 및 설계요소 데이터가 연동됨을 확인하였으며, DBIL에 연계되는 벽, 바닥, 문, 관통부 등을 정상적으로 추출하였다.