1 |
ANSI/NIRMA CM 1.0 (2007). "Guidelines for Configuration Management of Nuclear Facilities." Nuclear Information and Records Management Association.
|
2 |
Eastman, C., Teicholz, P., Sacks, R., and Liston, K. (2011). "BIM Handbook: A Guide to Building Information Modeling for Owners, Managers, Designers, Engineers, and Contractors." 2nd Edition, John Willey & Sons, Inc.
|
3 |
EPRI (2011). "Elements of Pre-Operational and Operational Configuration Management for a New Nuclear Facility." Electrical Power Research Institute, Technical Report, 2011-04.
|
4 |
Humppi, H. (2015). "Algorithm-Aided Building Information Modeling: Connecting Algorithm-Aided Design and Object-Oriented Design." MS thesis, Tampere University of Technology.
|
5 |
Kim, H., Moon, H., Choi, G., Kim, C., and Kang, L. (2012). "Development of BIM Functions and System for Construction Project Through Project Life Cycle -Focusing on Bridge Construction Project-" Korean Journal of Construction Engineering and Management, KICEM, 13(2), pp. 11-24.
DOI
|
6 |
Kim, I. (2010). "The History and Concept of BIM." Review of Architecture and Building Science, 54(1), pp. 16-21.
|
7 |
Shin, J. (2018). "Establishment of Room Based Database for Configuration Management in Nuclear Power Plant -Focusing on the Design Requirement and Facility Configuration Information-" Korean Journal of Construction Engineering and Management, KICEM, 19(6), pp. 34-45.
DOI
|
8 |
Kim, I., and Choi, J. (2013). "The Perspective of BIM Related Jobs." Review of Architecture and Building Science, 57(3), pp. 26-31.
|
9 |
Lee, J., Lee, J, Jeong, Y, Sheward, H., Sanguinetti, P., Abdelmohsen, S., and Eastman, M. (2012). "Development of space database for automated building design review system." Automation in Construction, 24, pp. 203-212.
DOI
|
10 |
Porter, S., Tan, T., Tan, T., and West, G. (2014). "Breaking BIM: Performing statics and dynamic security analysis with the aid of BIM." Automation in Construction, 40, pp. 84-95.
DOI
|
11 |
Yeom, J., Lee, S., and Kim, S. (2009). "An IFC Model-based Spatial Reasoning Platform for Indoor Spatial Awareness." Journal of the Architectural Institute of Korea Planning & Design, 25(4), pp. 73-80.
|
12 |
Yi, S., Hong, K., and Kang, H. (2016). "A study on the use of parametric design tools in BIM-based design process." Journal of Korean Institute of Culture Architecture, 53, pp. 275-284.
|