Development of AAB (Algorithm-Aided BIM) Based 3D Design Bases Management System in Nuclear Power Plant  

Shin, Jaeseop (KEPCO Engineering & Construction, Nuclear Division)
Publication Information
Korean Journal of Construction Engineering and Management / v.20, no.2, 2019 , pp. 28-36 More about this Journal
Abstract
The APR1400 (Advanced Power Reactor 1400MW) nuclear power plant is a large-scale national infrastructure facility with a total project cost of 8.6 trillion won and a project period of 10 years or more. The total project area is about 2.17 million square meters and consists of more than 20 buildings and structures. And the total number of drawings required for construction is about 65,000. In order to design such a large facility, it is important to establish a design standard that reflects the design intent and can increase conformity between documents (drawings). To this end, a design bases document (DBD) reflecting the design bases that extracted in regulatory requirements (e.g. 10CFR50, Korean Law, etc.) is created. However, although the design bases are important concepts that are a big framework for the whole design of the nuclear power plant, they are managed in 2-dimensional by the experts in each field fragmentarily. Therefore, in order to improve the usability of building information, we developed BIM(Building Information Model) based 3-dimensional design bases management system. For this purpose, the concept of design bases information layer (DBIL) was introduced. Through the simulation of developed system, design bases attribute and element data extraction for each DBIL was confirmed, and walls, floors, doors, and penetrations with DBIL were successfully extracted.
Keywords
Algorithm Aided BIM; BIM; Design Bases; Nuclear Power Plant;
Citations & Related Records
Times Cited By KSCI : 2  (Citation Analysis)
연도 인용수 순위
1 ANSI/NIRMA CM 1.0 (2007). "Guidelines for Configuration Management of Nuclear Facilities." Nuclear Information and Records Management Association.
2 Eastman, C., Teicholz, P., Sacks, R., and Liston, K. (2011). "BIM Handbook: A Guide to Building Information Modeling for Owners, Managers, Designers, Engineers, and Contractors." 2nd Edition, John Willey & Sons, Inc.
3 EPRI (2011). "Elements of Pre-Operational and Operational Configuration Management for a New Nuclear Facility." Electrical Power Research Institute, Technical Report, 2011-04.
4 Humppi, H. (2015). "Algorithm-Aided Building Information Modeling: Connecting Algorithm-Aided Design and Object-Oriented Design." MS thesis, Tampere University of Technology.
5 Kim, H., Moon, H., Choi, G., Kim, C., and Kang, L. (2012). "Development of BIM Functions and System for Construction Project Through Project Life Cycle -Focusing on Bridge Construction Project-" Korean Journal of Construction Engineering and Management, KICEM, 13(2), pp. 11-24.   DOI
6 Kim, I. (2010). "The History and Concept of BIM." Review of Architecture and Building Science, 54(1), pp. 16-21.
7 Shin, J. (2018). "Establishment of Room Based Database for Configuration Management in Nuclear Power Plant -Focusing on the Design Requirement and Facility Configuration Information-" Korean Journal of Construction Engineering and Management, KICEM, 19(6), pp. 34-45.   DOI
8 Kim, I., and Choi, J. (2013). "The Perspective of BIM Related Jobs." Review of Architecture and Building Science, 57(3), pp. 26-31.
9 Lee, J., Lee, J, Jeong, Y, Sheward, H., Sanguinetti, P., Abdelmohsen, S., and Eastman, M. (2012). "Development of space database for automated building design review system." Automation in Construction, 24, pp. 203-212.   DOI
10 Porter, S., Tan, T., Tan, T., and West, G. (2014). "Breaking BIM: Performing statics and dynamic security analysis with the aid of BIM." Automation in Construction, 40, pp. 84-95.   DOI
11 Yeom, J., Lee, S., and Kim, S. (2009). "An IFC Model-based Spatial Reasoning Platform for Indoor Spatial Awareness." Journal of the Architectural Institute of Korea Planning & Design, 25(4), pp. 73-80.
12 Yi, S., Hong, K., and Kang, H. (2016). "A study on the use of parametric design tools in BIM-based design process." Journal of Korean Institute of Culture Architecture, 53, pp. 275-284.