• Title/Summary/Keyword: Planning Costs

Search Result 549, Processing Time 0.021 seconds

Technology Standards Policy Support Plans for the Advancement of Smart Manufacturing: Focusing on Experts AHP and IPA (스마트제조 고도화를 위한 기술표준 정책영역 발굴 및 우선순위 도출: 전문가 AHP와 IPA를 중심으로)

  • Kim, Jaeyoung;Jung, Dooyup;Jin, Young-Hyun;Kang, Byung-Goo
    • Informatization Policy
    • /
    • v.30 no.4
    • /
    • pp.40-61
    • /
    • 2023
  • The adoption of smart factories and smart manufacturing as strategies to enhance competitiveness and stimulate growth in the manufacturing sector is vital for a country's future competitiveness and industrial transformation. The government has consistently pursued smart manufacturing innovation policies starting with the Manufacturing Innovation 3.0 strategy in the Ministry of Industry. This study aims to identify policy areas for smart factories and smart manufacturing based on technical standards. Analyzing policy areas at the current stage where the establishment and support of domestic standards aligning with international technical standards are required is crucial. By prioritizing smart manufacturing process areas within the industry, policymakers can make well-informed decisions to advance smart manufacturing without blindly following international standardization in already well-established areas. To achieve this, the study utilizes a hierarchical analysis method including expert interviews and importance-performance analysis for the five major process areas. The findings underscore the importance of proactive participation in standardization for emerging technologies, such as data and security, instead of solely focusing on areas with extensive international standardization. Additionally, policymakers need to consider carbon emissions, energy costs, and global environmental challenges to address international trends in export and digital trade effectively.

Architectural Acoustic Performance Renovation of the Large Gymnasium using Acoustic Simulation (음향시뮬레이션을 이용한 대형 실내체육관의 건축음향성능 개선에 관한 연구)

  • Yun, Jae-Hyun;Kim, Jae-Soo
    • Journal of the Korean housing association
    • /
    • v.19 no.4
    • /
    • pp.41-48
    • /
    • 2008
  • In this study, an analysis is carried out on the acoustic design for an indoor gymnasium scheduled to be built at Buan County, Chonbuk Province. By way of background, the study examines the case of a large-scale indoor gymnasium that has been constructed in the local area of Hangan-myeon. There are many examples whereby this gymnasium could be used not only as a sporting facility for the residents, but also as a multipurpose space for public performances such as leisure activities, lectures, assembling activities, theatre and concerts etc. In order to maximize the functional utilization of such an indoor gymnasium, it is important to simultaneously verify the acoustic capabilities of the space in terms of Definition of both Voice and Music. However, as a large-scaled athletic facility, the building was designed with a high ceiling-height to accommodate its functional characteristics. The space forms a Sound Focus whereby the sound is concentrated at a specific part, and because the vibration of sound is too loud due to its broad volume, acoustic defects arise such as a significant number of Echoes. Using this gymnasium as a precedent, this study proposes an acoustic design based on the drawings of the indoor gymnasium that is scheduled to be built at B County, Chonbuk Province. The gymnasium is equipped with an optimized acoustic condition passing through the Acoustic Simulation Phase. From the results of an Acoustic Simulation, we can design an indoor gymnasium that is equipped with a considerably satisfying and improved acoustic performance compared with the building before it was reformed. It is also considered that the use of such materials can fundamentally reduce construction costs and can improve acoustic performance, at the planning and design stages for similar sporting facilities in the future.

Conceptual Cost Estimation Model Using by a Parametric Method for High-speed Railroad (매개변수기법을 이용한 고속철도 노반공사의 개략공사비 예측모델)

  • Lee, Young Joo;Jang, Seong Yong
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.31 no.4D
    • /
    • pp.595-601
    • /
    • 2011
  • There is currently applied to the unit cost per a distance (KRW/km) for estimating the conceptual cost of civil work on basic planning stage of high speed railroad. This unit cost is an arithmetic average value based on historical data, which could be in big error. It also is difficult to explain the deficiency comparing the estimated cost derived from next basic design stage. This study provides the conceptual estimation model using by the parametric method and regression analysis. Independent variables are the distance and the geological materials (earth, weathered rock, soft-rock, hard-rock), extracting from the actual data to 36 contracts. The deviation between the unit costs estimated using the developed model and the actual cost data is presented in the range from -0.4% to +31%. This range is acceptable compared the typical range "-30% to + 50%". This model will improve the accuracy of existing method and be expected to contribute to effective total cost management and the economic aspects, reduce the financial expenditure.

A Schematic Estimation Model for Structure Costs of High-rise Buildings based on Vertical and Horizontal Elements (고층건물 수직·수평 요소기반 골조공사 개산견적 모델)

  • Nam, Dong-Hee;Park, Hyung-Jin;Koo, Kyo-Jin
    • Korean Journal of Construction Engineering and Management
    • /
    • v.15 no.1
    • /
    • pp.3-10
    • /
    • 2014
  • High-rise buildings need thorough cost management because of large size and high risk. Cost management makes a budget by establishing and analyzing detail element at planning phase, needs cost control as each design phase, then reflected to next design. This research develops a schematic estimation model based on vertical and horizontal elements at design phase for structure cost of high-rise buildings to reduce error range and use data as design management. Usability of the model is confirmed by case study. The estimation model is expected to contribute to making the cost model more effective and satisfactory to concerned in construction or budget department and manage keeping track of the cost.

DENTAL TREATMENT UNDER GENERAL ANESTHESIA: AN OVERVIEW OF CLINICAL CHARACTERISTICS OF SPECIAL NEEDS PATIENTS (전신 마취 하 장애인 치과치료에 대한 임상적 고찰)

  • Chang, Juhea
    • The Journal of Korea Assosiation for Disability and Oral Health
    • /
    • v.10 no.2
    • /
    • pp.61-67
    • /
    • 2014
  • The aim of this study was to analyze the clinical characteristics of patients with cognitive and behavioral impairments receiving dental treatment under general anesthesia (GA-dental treatment). From August 2007 to April 2014, information was collected from 475 patients who received GA-dental treatment at the Clinic for Persons with Disabilities, Seoul National University Dental Hospital. The demographic factors (gender, age, disability, medication, GA history, residency type, caregiver, meal type, oral hygiene maintenance, and cooperation level) and dental status (operating duration, DMFT, malocclusion, periodontal disease, tooth defect, and treatment protocol) of the patients were evaluated. DMFT and malocclusion levels were compared among the patients with ANOVA and Sheffe's post-hoc test, and chi-square test, respectively. The correlation between the demographic characteristics and dental status of the patients were analyzed with the Pearson's correction test. The mean age of the patients was 27.1 (7 - 83) years and they had intellectual disabilities (55.4%), developmental disorders (17.9%), brain disorders (16.6%), neurocognitive disorders (4.6%), or others (5.5%). The mean DMFT (DT) was 8.6 (5.2) with a significant difference among the disability types (p<0.05). The incidence of malocclusion was higher in patients with intellectual disabilities and brain disorders than in the other types (p<0.05). The operation time ($191.4{\pm}91.2min$) was correlated with decayed or endodontically-treated teeth (p<0.05). Special needs patients requiring GA-dental treatment showed unfavorable oral conditions. Dental practitioners experience time restrictions and additional costs under a GA setting. Treatment planning and decision-making can be efficiently facilitated by evaluating the clinical characteristics of the patients.

VE Alternative Verification Method Using KANO Model (카노모델을 활용한 VE대안 검증방법)

  • Liu, Jun-Nan;Qiao, Le;Park, Jin-Young;Kim, Byung-Soo
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.39 no.6
    • /
    • pp.923-932
    • /
    • 2019
  • VE is used as a powerful tool to add value to facilities by improving functionality and reducing costs. By identifying the client's requirements in the VE process and reflecting them in the quality model, the developed alternatives meet the client's requirements. However, there is no process to verify how the developed alternatives reflect the needs of the client through functional analysis, idea generation and evaluation. The purpose of this study was to develop, verify, and prove the effectiveness of a methodology for evaluating client satisfaction with alternatives developed during the VE Job Plan. The KANO model, which can identify the satisfaction and dissatisfaction of requirements in product planning, was set as a methodology for alternative verification procedures of VE, and was improved and applied to the purpose of this study. As a result, the alternative evaluation method developed in this study was found to be useful. It is expected that the KANO model will be used to evaluate the satisfaction of VE alternatives in the VE Job Plan analysis.

Efficiency Analysis on Sales Performance of NPD Projects in ICT Industry Using DEA : Focusing on Empirical Instance from 'S' corporation (자료포락분석을 이용한 ICT산업 신제품 개발 프로젝트 매출 성과에 관한 효율성 분석 : 중견기업 S사의 실례를 중심으로)

  • Jang, HeeSeok;Park, SoHyun;Kim, Seung-Chul
    • Journal of Information Technology Services
    • /
    • v.18 no.5
    • /
    • pp.209-224
    • /
    • 2019
  • When evaluating the performance of a NPD(New Product Development) project, it is common to evaluate the project performance according to the achievement of the planned goal in terms of time, quality and cost management, which are usually three main constraints of the project. The evaluation of the financial factors by which sales contributed to the return of the company is more influential. This is why companies need to increase sales and raise profits. Therefore, it is more reasonable to evaluate the sales performance of NPD projects over a certain period of time against the input costs. At this time, we can analyze the causes of inefficient projects and compare them with other projects and find out how to improve the sales performance to help the company increase its competitiveness. In this paper, we analyze the relative efficiency of the sales performance on the input of the projects by using the actual sales in the period of one year after mass production of the NPD projects of 'S' company in ICT industry. Input factors include developer resource and development cost for the NPD reported after the project has been completed, the delay weeks for the schedule targeted at the project planning stage, and the number of quality issues due to development design faults during initial mass-production. The sales figure and the contribution margin of the product after one year from the start of mass production are defined as the output factors. In this paper, we analyze the efficiency of the projects by using data envelope analysis (DEA). As a result, we found out the reason of the inefficient project of DMUs according to the differences in the characteristics of the efficient and inefficient B2B markets based on the result of DEA of NPD projects. Thus, the goal of this paper is to identify strategies for improving sales performance of NPD projects in inefficient markets.

An Optimal Scheduling Method Using Probability on the Estimation of Construction Duration (확률적 공기산정에 의한 공정계획 합리화 방안)

  • Kim Sang-Joong;Lee Jae-Soeb
    • Korean Journal of Construction Engineering and Management
    • /
    • v.5 no.6 s.22
    • /
    • pp.72-79
    • /
    • 2004
  • Critical Path-based project management has been applied to the construction projects with a goal of delivering projects within original costs and time estimates. These current project management methods, rarely make early finishes of construction Projects. In addition, current practices on time management seems not to take advantages of early finishes concepts due to student syndrome and Parkinson's Law, This research study applied the Theory of Constraints(n) in the estimation of construction project duration. While the TOC includes variety of management techniques, in this study, it refers to critical chain that has been used to develop the specific management technique in scheduling. The concept of critical chain is applied to this study to solve the problems associated with the current scheduling method. The efforts focus to solve the p개blems associated with current construction project scheduling methods by adopting both stochastic estimation technique and the concept of schedule buffer,

A Study of the Regulations for Calculation of Acceleration Costs on Construction Work (건설공사 공기단축으로 인한 추가비용의 산정규정에 관한 연구)

  • Min, Byeong-UK;Park, Hyung-Keun
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.37 no.2
    • /
    • pp.409-417
    • /
    • 2017
  • The study is concerned with doing research on the plan to prevent the dispute occurring between contract parties regarding the additional cost generated when the construction period is shortened during construction work. After the review of the claim cases and the judgment cases of the court regarding the additional cost caused by the shortened construction period, the representative problem is the incomplete regulations on calculating the additional cost. In the 1st stage of the results of the research on the problem, the procedure handling the additional cost is presented, and the process of planning and approving the shortening of the construction period is gone through in the stage of the procedure to prevent the dispute on the additional cost between contract parties. In the 2nd stage, the plan on enacting and revising the regulations on removing the incomplete problems of the current regulations relating to the calculation of the additional cost. The basis for the advanced contract management is provided by resolving the incomplete problems of the current regulations relating to the shortening of the construction period with the prevention of a dispute and the resultant loss.

Air Passenger Demand Forecasting and Baggage Carousel Expansion: Application to Incheon International Airport (항공 수요예측 및 고객 수하물 컨베이어 확장 모형 연구 : 인천공항을 중심으로)

  • Yoon, Sung Wook;Jeong, Suk Jae
    • Journal of Korean Society of Transportation
    • /
    • v.32 no.4
    • /
    • pp.401-409
    • /
    • 2014
  • This study deals with capacity expansion planning of airport infrastructure in view of economic validation that reflect construction costs and social benefits according to the reduction of passengers' delay time. We first forecast the airport peak-demand which has a seasonal and cyclical feature with ARIMA model that has been one of the most widely used linear models in time series forecasting. A discrete event simulation model is built for estimating actual delay time of passengers that consider the passenger's dynamic flow within airport infrastructure after arriving at the airport. With the trade-off relationship between cost and benefit, we determine an economic quantity of conveyor that will be expanded. Through the experiment performed with the case study of Incheon international airport, we demonstrate that our approach can be an effective method to solve the airport expansion problem with seasonal passenger arrival and dynamic operational aspects in airport infrastructure.