1 |
Park, S., Koo, K., Hyun, C., (2006), "Development of Quantity based Base Period Price Index(QBPPI) to calculate Construction Cost Index", Korean journal of Construction Engineering and Management, KICEM, 7(5), pp. 77-84.
과학기술학회마을
|
2 |
Seo, J., Kwon, B., Kim, S., Park, H., (2009), "Structural Cost Optimization Techniques for High-rise Buildings Frame Systems Using High-strength Steels", journal of Computational Structural Engineering Institute of Korea, 22(1), pp. 53-63.
과학기술학회마을
|
3 |
Barrie, D., (1992), Professional Construction Management, McGraw-Hill.
|
4 |
Blackman, Q., David, P., (2010), Height and Construction Costs of Residential High-Rise Buildings in Shanghai, Journal of Construction Engineering and Management, 136, pp. 1169-1180.
DOI
|
5 |
Blackman, Q., David, P., Chunlu, L., (2008), Height and construction costs of residential buildings in Hong Kong and Shanghai, International Conference on Multi-national Construction Projects.
|
6 |
emporis, http://www.emporis.com/statistics/skyline-ranking (2012)
|
7 |
Everest, L., (2004), Spon's Architects' and Builders' Price book, Spon Pres.
|
8 |
Kim, S., Im, C., (2007), "A Study on the Estimate Cost Model for Concrete Structural Frame Work in the High-Rise Residential-Commercial Complex Building, journal of Architectural Institute of Korea", 23(7), pp. 151-159.
과학기술학회마을
|
9 |
Koo, K., Park, S., Park, S., Song, J., (2008), "Object & Parameter based Schematic Estimation Model for Predicting Cost of Building Interior finishings", Korean journal of Construction Engineering and Management, KICEM, 9(6), pp. 175-183.
과학기술학회마을
|