DOI QR코드

DOI QR Code

A Schematic Estimation Model for Structure Costs of High-rise Buildings based on Vertical and Horizontal Elements

고층건물 수직·수평 요소기반 골조공사 개산견적 모델

  • 남동희 (건원엔지니어링) ;
  • 박형진 (서울시립대학교 대학원 건축공학과) ;
  • 구교진 (서울시립대학교 대학원 건축공학과)
  • Received : 2013.01.07
  • Accepted : 2013.09.04
  • Published : 2014.01.31

Abstract

High-rise buildings need thorough cost management because of large size and high risk. Cost management makes a budget by establishing and analyzing detail element at planning phase, needs cost control as each design phase, then reflected to next design. This research develops a schematic estimation model based on vertical and horizontal elements at design phase for structure cost of high-rise buildings to reduce error range and use data as design management. Usability of the model is confirmed by case study. The estimation model is expected to contribute to making the cost model more effective and satisfactory to concerned in construction or budget department and manage keeping track of the cost.

고층건물은 공사비 규모가 크고 어느 건설사업보다 공사비 리스크가 높다는 점에서 면밀하고도 철저한 공사비 관리가 필요하다. 공사비 관리는 계획 단계에서부터 세부적인 요소를 설정하고 분석하여 예산을 수립하고 설계 진행 단계별로 공사비의 추적 관리가 필요하며 이를 차기 설계에 반영하는 것이 중요하다. 따라서 본 연구는 설계초기단계 골조공사비 예측시 오차범위를 줄이고, 설계단계별 추적 관리의 기초자료로 활용하기 위하여, 고층건물의 골조공사비를 대상으로 수직 수평 요소(Element)를 기반으로 한 설계초기단계 골조공사비 예측모델을 개발한다. 사례 비교를 통해 본 연구에서 제안한 모델의 유용성을 확인하였다. 예측모델은 설계가 진행됨에 따라 발주자의 요구사항반영, 기타요인에 의한 설계변경 등의 추적 관리가 가능하고, 향후 제시된 기준에 따라 데이터를 축척하고 활용함으로써 골조 물량 및 골조공사비의 대비 오차율을 줄일 수 있을 것으로 기대된다.

Keywords

References

  1. Barrie, D., (1992), Professional Construction Management, McGraw-Hill.
  2. Blackman, Q., David, P., (2010), Height and Construction Costs of Residential High-Rise Buildings in Shanghai, Journal of Construction Engineering and Management, 136, pp. 1169-1180. https://doi.org/10.1061/(ASCE)CO.1943-7862.0000226
  3. Blackman, Q., David, P., Chunlu, L., (2008), Height and construction costs of residential buildings in Hong Kong and Shanghai, International Conference on Multi-national Construction Projects.
  4. emporis, http://www.emporis.com/statistics/skyline-ranking (2012)
  5. Everest, L., (2004), Spon's Architects' and Builders' Price book, Spon Pres.
  6. Kim, S., Im, C., (2007), "A Study on the Estimate Cost Model for Concrete Structural Frame Work in the High-Rise Residential-Commercial Complex Building, journal of Architectural Institute of Korea", 23(7), pp. 151-159.
  7. Koo, K., Park, S., Park, S., Song, J., (2008), "Object & Parameter based Schematic Estimation Model for Predicting Cost of Building Interior finishings", Korean journal of Construction Engineering and Management, KICEM, 9(6), pp. 175-183.
  8. Park, S., Koo, K., Hyun, C., (2006), "Development of Quantity based Base Period Price Index(QBPPI) to calculate Construction Cost Index", Korean journal of Construction Engineering and Management, KICEM, 7(5), pp. 77-84.
  9. Seo, J., Kwon, B., Kim, S., Park, H., (2009), "Structural Cost Optimization Techniques for High-rise Buildings Frame Systems Using High-strength Steels", journal of Computational Structural Engineering Institute of Korea, 22(1), pp. 53-63.