• Title/Summary/Keyword: Plan water use

Search Result 330, Processing Time 0.032 seconds

A Study on Planning Aspects & Detaild Techniques of the Eco-school (Eco-School의 계획측면과 세부수법에 관한 연구)

  • Kang, Eun-Ju;Oh, Deog-Seong
    • KIEAE Journal
    • /
    • v.2 no.4
    • /
    • pp.27-39
    • /
    • 2002
  • The fields of green building and ecological design have much to offer to those who are seeking to improve the ecological impact of schools and school grounds. These well established disciplines are particularly useful to existing schools considering renovations to make them more energy, water, and resource efficient as well as healthier places to work and play, Green building and ecological design principles and techniques are also very effective, of course, if incorporated into the design for brand new school buildings. The major concept of the Eco-school plan is to understand that the school consists of an ecosystem, so the design concept should focus on minimising impact but at the same time maintaining close contact with the environment. T his is becoming the basic concept in applying the Eco-school design to the new 21st century school building. This thesis is an analysis on the methods of application, based on careful examination of case-studies from the U.S.A about detailed plan element and design method, through the following six aspects ; (1) site use plan, (2) green plan, (3) water system plan, (4) materials and recycling of resources, (5) energy use plan, (6) indoor environment plan.

Optimal Conjunctive Use of Surface and Ground Water (지표수와 지하수의 최적 연계운영)

  • Yi, Jae-Eung
    • Journal of Korea Water Resources Association
    • /
    • v.35 no.4 s.129
    • /
    • pp.367-374
    • /
    • 2002
  • Water supply plan by optimal conjunctive use of surface and ground water is studied to prepare expected water deficit in near future. The optimization model for conjunctive use of surface and ground water is developed using discrete differential dynamic programming technique to maximize net benefit by water supply. As a result of applying the model to Namdaechun river located in Yangyang, it is found that water supply reliability using optimal conjunctive use of surface and ground water is much higher than reliability using surface water alone.

Establishment of Informatization Plan for the Construction of Integrated Management System of Agricultural Water (농촌용수 통합관리체계 구축을 위한 정보화 계획 수립)

  • Choi, Hyun Seong;An, Se Hee
    • Journal of The Korean Society of Agricultural Engineers
    • /
    • v.59 no.5
    • /
    • pp.61-72
    • /
    • 2017
  • The purpose of this study is to establish an integrated management system for the efficient management of rural water, to improve current problems, and to lay the foundations for active use of rural water information. We proposed a plan for informatization with a focus on establishing a database that can be used to provide customized services to users by applying advanced IT technology and to strengthen the management system of cities and counties with poor information. Data linkage and integration, user service development and integration system, application of IT technology, advanced decision support for rural water management, strengthening of city and county management system And the details of the implementation of the key project were presented.

The Outline of Han River Basin Environmental master Plan Project (한강유역 환경보전 종합계획 사업의 개요)

  • 이선환
    • Journal of the Korean Professional Engineers Association
    • /
    • v.15 no.1
    • /
    • pp.46-50
    • /
    • 1982
  • Following rapid industrial development and urbanization in Korea, there is a need for the Government to implement effective control of pollution and to undertake specific schemes in areas where pollution of the environment is severe. In response to this need, Government of Korea prepare Han River Basin Environmental Master Plan Project for water, air, solid waste to cover environmental protection of the Han River Basin. The Project area is approximately 27,000 sq. Km extending over Seoul, Kyunggi, Kwangwon, Chungbuk Province. The total population of Master Plan Project area is approximately 11.6 million, or one-third of the total population of Korea. There are about 8,000 industries, including those located in 16 industrial complexes, in the project area. The scope of work and terms of reference are the following: (1) A Summary of existing land use and forecasts for changes in land use by the year 2,000. (2) Emission inventories for air, waste water, and solid wastes. (3) Forecasts of future population growth patterns and pollution loadings. (4) Identification of specific projects needs to reduce pollution levels and satisfy the environmental quality standards. (5) A Program of enforcement to include (i) self monitoring, and (ii) governmental inspections and surveillance. (6) A program for quality improvement and quality assurance of environmental measurements. (7) Reports summarizing all data collected analyzed during the study. (8) Conceptual design and feasibility studies, including cost estimates, for needed pollution control projects. (9) A financial plan for future detailed design and construction of public facilities, for financial incentives to industry, and for user charges for industrial use of public treatment of disposal works.

  • PDF

A Study on Improved Allocations of Permissible Water Pollution Load at the Implementing Stage of Tatal Water Pollution Load Management Plan (수질오염총량관리계획의 시행단계에서 오염부하량 할당방안 개선에 관한 연구)

  • Kim Sie-Heon;Rim Jay-Myung
    • Journal of environmental and Sanitary engineering
    • /
    • v.20 no.3 s.57
    • /
    • pp.51-56
    • /
    • 2005
  • Allocation of water pollution load from loading capacity can be much essential, controversial, and its standards can be applied case-by-case to the various situations. Allocation methods to point sources are generally 'Equal effluent concentration', 'Equal percent Treatment', Loading capacity at planning stage consists of basic pollution load, development pollution load, reserved pollution load and margin of safety. But at the implementing stage loading capacity can be consisted of allocatable load and margin of safety to give more flexibility in the total water pollution load management plan. In that case, we can re-adjust and altogether use the pollution load of point sources of series and non-point sources at the implementing stage.

The Influence on the Runoff Charateristics by the Land Use in Small Watersheds (II) (소유역의 토지이용이 유출특성에 미치는 영향 (II))

  • Choi, Ye-Hwan;Choi, Joong-Dae
    • Proceedings of the Korea Water Resources Association Conference
    • /
    • 2005.05b
    • /
    • pp.178-182
    • /
    • 2005
  • In the forthcoming 21C, the development of cultural lives depends on that the water demand will increase or not. On the opposite site of that circumstance, many factors of the small watersheds will influence directly on how to cover the surface of watersheds with land use, no planning developing watersheds, and the rearrangement of small rivers. Especially as the extraordinary climatic Phenomena, exhaust of $CO_2$ and destruction of 03 layer, water resource and water foresting content of the small watersheds will be decreased by confusing on the malting a plan of water resources. For example, those are Typhoon Rusa in 2002, Typhoon Maemi in 2003 and heavy storms in 2004. This study area has three group and one of them having three small watersheds, total five small watersheds. That is, Sabukmyeon small watersheds in Chuncheon, Three small watersheds in Wonju(Jeoncheon, Jupocheon and Hasunamcheon), and Suipcheon in Yanggu-Gun which are located far away each other three group and different precipitation data. According to the land use such as dry field(or farm), rice field, forest land. building site and others in small watersheds, the amount of runoff will be impacted by monthly precipitation. The comparison between the runoff was getting from Kajiyama Formula and calculated runoff from multi-linear regressed equations by land use Percentage was performed with different precipitation data and different small watersheds. Its correlations which are estimated by coefficient of correlation will be accepted or not, as approached 1.0000 values. As the monthly water resources amount is estimated by multi-linear regressed equations with different precipitation data and different small watersheds having no gauging station, we make a plan in order to demand and supply the water quantity from small river watersheds during return periods.

  • PDF

Application of K-WEAP (Korea-Integrated Water Resources Evaluation and Planning Model) (통합수자원평가계획모형 K-WEAP의 적용성 Application of K-WEAP)

  • Choi, Si-Jung;Lee, Dong-Ryul;Moon, Jang-Won;Kang, Seong-Kyu
    • Journal of Korea Water Resources Association
    • /
    • v.43 no.7
    • /
    • pp.625-633
    • /
    • 2010
  • An integrated water resources management is highly required to use efficient water and preserve water quality due to the limits of water resources development and water pollution. K-WEAP was developed, which supports the water resources planning and evaluation within a fully integrated interactive system. In this study, we present three applications of K-WEAP. First, we examined the usefulness of K-WEAP as a water resources planning tool through its application to the National Water Resources Plan. Second, the conjunctive use of surface water and groundwater in the Geum river basin with K-WEAP was evaluated, and its results show how to support to set up a sustainable groundwater management plan. Finally, we confirmed the function of the integrated water quantity and quality management in K-WEAP, which conducted by comparing the simulated results of water quality in both QUAL2E and K-WEAP.

Planning of Extuary Reservoirs for the Development of Water Resources -A Comparative Study of Representation Cases of Korea and Japan- (유역이수의 고도화에 대응하는 하구담수호의 계획론 -한국.일본의 대표적 사례의 비교연구-)

  • 이희영
    • Magazine of the Korean Society of Agricultural Engineers
    • /
    • v.24 no.1
    • /
    • pp.44-52
    • /
    • 1982
  • Recently, estuary reserovoirs have been actively constructed in Korea and also in Japan there are a large number of estuary reservoirs constructed. But most of the estuary reservoirs are located at the downstream of a river where geographical condition is best for the construction of an enclosing dam. And an effective utilization of water from the estuary reservoir seems to be difficult even if estuary reservoirs are considered to be the water resources the most available for their watershed. Studies on estuary reservoirs so far have been mainly concentrated on the physical and engineering problems of the dam construction itself. The purpose of the present study is to review the estuary reservoir planning in connection with the water resources development and to study a basis of the planning. First, the levels of water use in Korea and Japan were compared with those of other countries in the world. And then, some representative reservoirs were selected to study the roles of a reservoir and water-using conditions in the watershed. Based on the study, a survey was given on the relation between a dam construction upstream and an estuary reservoir construction downstream of a river. Finally, a comprehensive examination was made of the bases of estuary reservoir planning. (1) The estuary reservoir planning is deeply related to the plan for water use develo- pment in the watershed. After the upstream water resources were fully developed up to the most, water reso- urces development by an estuary reservoir should be started. (2) If an estuary lake has a capacity big enough, it can store flood discharge of the watershed without any loss and become a basic facility that will bring about the maxi- mum use of water from the watershed. (3) Estuary reservoirs store water used in the upstream watershed, so recycling of water use is attained by the reservoir. Water in the estuary lake is difficult to be fresh water in its long run. Therefore, estuary reservoir should be located at a place where polluted water is purified and refused. All the planning should be based on the assumption that water in the estuary lake is not fresh but polluted after a long time. (4) The estuary lake can only supply water to the lower basin directly. But the upstream area is benefited from the estuary lake by exchange of irrigation water sources between the lower and the upper area. So a large-scale exchange plan between new and existing water resources is important. By constructing estuary reservoirs and the exchange of water sources between upper and lower areas, the reasonable maximum use of water from the whole watershed is at- tained. (5) The big problem coming from the water resources development by an enclosing estuary is salt water intrusion into the lake. To maintain the estuary lake salt-free, multi-purpose use of the lake should be avoided. It is necessary to take such fundamental measures as abolition of back flow operation of gate, and the closing of the fish port and the fish ladder. The results mentioned above were found in this study and these results of this study could be used for the adequate planning of estuary reservoirs in connection with the maximum water use of the watershed.

  • PDF

Studies on the Composition of Water-Friendly Space in Port and Harbour Development (어항 및 항만개발의 친수공간 조성에 관한 연구)

  • Joo, Yong-Jun;Maeng, Jun-Ho;Cho, Kwangwoo
    • Journal of Environmental Impact Assessment
    • /
    • v.16 no.2
    • /
    • pp.177-186
    • /
    • 2007
  • The composition of water-friendly space in the port and harbour developments provides the accessibility to the sea and thus resting & recreational function of the local citizen, which should be treated importantly for the eco-friendly coastal development. However, the high demand on water-friendly space can induce another environmental problem because most port and harbour developments require marine reclamation and the water-friendly space are made up on the reclamation area. The present study analysed the problems and suggested matters to be considered in composing the water-friendly space of port and harbour developments. The study also established the management direction by site characteristics of port and harbour. In addition, we attempt to find a plan to avoid the water-friendly space composition with environmental damage and to secure the environmental and public soundness in site selection, land use and facilities plan based on case studies.

Applying of Indicators for Landscape Planning in Building Lots Development District around Urban Fringe (도시근교 택지개발지역의 경관계획지표 적용방안)

  • Kim, Yong-Soo;Park, Chan-Yong
    • Journal of Korean Society of Rural Planning
    • /
    • v.13 no.3
    • /
    • pp.51-60
    • /
    • 2007
  • In terms of the indicators by the type for the landscape plan per the district nit, geographic ecology indicators were the items such as water, water system, topography and climate, while biological ecology indicators were the items such as green zone size, green zone ratio, biotope size and distribution. The sensory and visual indicators were the items such as view point, view axis and skyline, and the accessibility indicator items for the green zone were applied as the socially used indicators. As for the application method according to each indicator, the water or water system was expressed and applied through the slopes and elevation topographic analysis drawings, the climate was expressed and applied through the main direction of the wind and the cold wind pass alley drawings. As for the green zone size and green zone ratio, the land use according to the status and housing area development was compared to present the measured figures. In case of the biotop size and the distribution item, the range was limited to the preparation of the biotope drawings for the focused preservation. As for the view point and view axis, the view point was selected according to the view point to prepare and apply the view analysis drawing in which the view area to be preserved is analyzed. As for the skyline, its landscape photo was composed with the housing area shape, and then skyline photography was applied as the plan in order to propose and consider the various shapes of the skyline. As for the accessibility to the peen zone, the network drawing was drawn to reflect the users' accessibility and continuity of the green zone formed and preserved according to the land use plan and then the drawing was prepared and proposed as the applicable plan.