• Title/Summary/Keyword: Piping structure

Search Result 144, Processing Time 0.024 seconds

A Study on Cast Structure and Mechanical Properties of Al-10% Mg Alloy Solidified Under High Hydraulic Pressure (고압주조한 Al-10% Mg 합금의 주조조직 및 기계적 성질에 관한 연구)

  • Jeong, Woo-Hyon;Jeong, Jong-Yeon;Lee, Jong-Nam
    • Journal of Korea Foundry Society
    • /
    • v.3 no.1
    • /
    • pp.28-36
    • /
    • 1983
  • In order to study the cast structure and mechanical properties of Al-10 % Mg alloy solidified under the various high hydraulic pressure, ranging from $0kgf/cm^2$ to $2000㎏f/cm^2$ , the relationship between the cooling rate and the cast structure was observed, and also the mechanical test and the measurement of the specific gravity were carried out. From this experiment, results were summerized as follows; 1. The cooling rate of the alloy increased with increase of the applied pressure. 2. The formation of the piping and the porosity in the castings was surpressed by applying the high hydraulic pressure. 3. The dendrite arm spacing decreased with increase of the applied pressure. 4. Mechanical properties and specific gravity increased with the increase of the applied pressure.

  • PDF

Low-cycle Fatigue Behaviors of the Steel Pipe Tee of a Nuclear Power Plant Using Image Signals (이미지 신호를 이용한 원자력발전소 강재배관 Tee의 저주기 피로 거동)

  • Kim, Sung-Wan;Jeon, Bub-Gyu;Cheung, Jin-Hwan;Kim, Seong-Do
    • Journal of the Korea institute for structural maintenance and inspection
    • /
    • v.23 no.6
    • /
    • pp.77-83
    • /
    • 2019
  • Upon installing a seismic isolation device on a nuclear power plant, the device takes on the suppression of seismic loads. This is expected to bring about a larger displacement than what is seen prior to the installation of the seismic isolation device. Depending on the displacement change, the seismic risk for some equipment can increase. Particularly in case of the piping system, which is used for connecting the structure isolated from seismic events with common structures, the seismic risk is expected to rise significantly. In this study, the limit state of the steel pipe tee, which is a vulnerability part of the nuclear power plant piping system, was defined as leakage, and an in-plane cyclic loading test was conducted. As it is difficult to measure the moment and rotation of the steel pipe tee using the conventional sensors, an image signal was used. This study proposed a leakage line and low-cycle fatigue curves using the relationship between the moment and the rotation of a 3-inch steel pipe tee.

Numerical Analysis in Hydrograph Determination for Sluice Gate installed Levee (배수통문이 설치된 제방의 설계수위파형결정에 관한 수치해석)

  • Kim, Jin-Man;Choi, Bong-Hyuck;Oh, Eun-Ho;Cho, Won-Beom
    • Journal of the Korean Geosynthetics Society
    • /
    • v.14 no.4
    • /
    • pp.1-9
    • /
    • 2015
  • According to national regulations and its commentary, such as Rivers Design Criteria & Commentary (KWRA, 2009), Foundation Structure Guideline and its Commentary(MLTM, 2014 and KGS, 2009), the integrity evaluation of river levee includes slope stability evaluation of both riverside/protected low-land and piping stability evaluation with respect to foundation and levee body along with water level conditions. In this case the design hydro-graph can be the most important input factor for the integrity evaluation, however it is fact that the national regulations do not provide any proper determination methods regarding hydro-graph. The authors thus executed an integrity evaluation of sluice gate in levee by changing each hydro-graph factor, including rising ordinary water level, lasting flood water level, falling water level, and flood frequency, in order to suggest a determination method of reasonable hydro-graph. As a result, the authors suggested that at least over 57 hours of rising ordinary water level and over 53 hours of lasting flood water level should be considered for the design hydro-graph of sluice gate in levee at Mun-san-jae.

Evaluation of Fracture Toughness and Constraint Effect of Cruciform Specimen under Biaxial Loading (이축하중을 받는 십자형 시편의 파괴인성 및 구속효과 평가)

  • Kim, Jong Min;Kim, Min Chul;Lee, Bong Sang
    • Transactions of the Korean Society of Pressure Vessels and Piping
    • /
    • v.12 no.1
    • /
    • pp.62-69
    • /
    • 2016
  • Current guidance considers that uniaxially loaded specimen with a deep crack is used for the determination of the ductile-to-brittle transition temperature. However, reactor pressure vessel is under biaxial loading in real and the existence of deep crack is not probable through periodic in-service-inspection. The elastic stress intensity factor and the elastic-plastic J-integral which were used for crack-tip stress field and fracture mechanics assessment parameters. The difference of the loading condition and crack geometry can significantly influence on these parameters. Thus, a constraint effect caused by differences between standard specimens and a real structure can over/underestimate the fracture toughness, and it affects the results of the structural integrity assessment, consequentially. The present paper investigates the constraint effects by evaluating the master curve $T_0$ reference temperature of PCVN (Pre-cracked Charpy V-Notch) and small scale cruciform specimens which was designed to simulate biaxial loading condition with shallow crack through the fracture toughness tests and 3-dimensional elastic-plastic finite element analyses. Based on the finite element analysis results, the fracture toughness values of a small scale cruciform specimen were estimated, and the geometry-dependent factors of the cruciform specimen considered in the present study were determined. Finally, the transferability of the test results of these specimens was discussed.

A method on integrity evaluation with high reliability for superheater structure in a supercritical thermal power plant (초임계압 화력 과열기 구조의 고신뢰도 건전성 평가 방법)

  • Lee, Hyeong-Yeon;Ju, Yong-Sun;Choi, Hyun-Sun;Won, Min-Gu;Huh, Nam-Su
    • Transactions of the Korean Society of Pressure Vessels and Piping
    • /
    • v.16 no.1
    • /
    • pp.65-73
    • /
    • 2020
  • Integrity evaluations on a platen superheater were conducted as per ASME Section VIII Division 2(hereafter 'ASME VIII(2)') which was originally used for design with implicit consideration of creep effects. A platen superheater subjected to severe loading conditions of high pressure and high temperature at creep regime in a supercritical thermal plant in Korea was chosen for present study. Additional evaluations were conducted as per nuclear-grade high-temperature design rule of RCC-MRx that takes creep effects into account explicitly. Comparisons of the two results from ASME VIII(2) and RCC-MRx were conducted to quantify the conservatism of ASME VIII(2). From present analyses, it was shown that the design evaluation results exceeded allowable limits of RCC-MRx for the plant design conditions although limits of ASME VIII(2) were satisfied regardless of operation time, which means that design as per ASME VIII(2) might be potentially non-conservative in case of operation in creep range. A high-temperature design evaluation program as per RCC-MRx, called 'HITEP_RCC-MRx' has been used and it was shown that pressure boundary components can be designed reliably with the program especially for the loading conditions of long-term creep conditions.

Winter to replace the hydraulic test and pneumatic test comparative analysis of study on the optimal pressure (동절기 수압시험을 대체하는 공기압시험의 적정압력 비교분석에 관한 연구)

  • Kwoun, Young-Hee;Hwang, Dong-Hwan;Kim, Tae-Gil;Kang, Kyung-Sik
    • Journal of the Korea Safety Management & Science
    • /
    • v.16 no.2
    • /
    • pp.211-216
    • /
    • 2014
  • Using a high-rise building water piping after hydrostatic test of the reliability of the leak to be completed if the pressure is maintained until the leak is not commercially available considered. Due to the nature of high-rise buildings and the construction period will take several years from the lower levels of use of the water supply and fire fighting water pipe construction is in progress, the order of which I do most of the first pipe to the construction and more than three years. So kind of riser pipe is complete, install the valve in the basement by installing an automatic pump to maintain a constant pressure after hydrostatic test and after each floor plumbing piping is complete, the progress of the hydrostatic test without undergoing a separate branch pipe the valve is opened automatically when the number of the pressing pressure of the structure. I kind of do and keep working pressure of pipe until the completion of the construction work to keep the damage to human error when it is intended to prepare. In winter, the frost protection and an alternative to drainage water pipe is damaged or deformed, even if unaware of the finishing work to the building, the use of the damage caused by a leak in a after construction of finish work to be expected. Alternative to reduce this damage if the pressure test without fear of freezing to help maintain long-term commercial pressures may be considered.

A Study on the Improvement of Technical Regulations in the Customer Cabling Systems for FTTH (FTTH를 위한 구내선로설비 기술기준개선 연구)

  • Choi, Mun-Hwan;Kang, Young-Heung;Cho, Pyoung-Dong;Yang, Jun-Kyu;Lee, Sang-Mu
    • Journal of the Korea Institute of Information and Communication Engineering
    • /
    • v.11 no.9
    • /
    • pp.1729-1733
    • /
    • 2007
  • In this paper, we have carried out some tests for analyzing the effects of optical fiber characteristics and piping structures in designing a Customer Cabling System with optical fibers. In this tests, the loss characteristics due to the number of curvatures and the radius of curvature with bending to establish an optical fiber have analyzed particularly. We can confirm that the test results satisfy the current technical regulations in both cases of the number of curvatures and the radius of curvatures. Also, in particular, since there is no loss in an optical cable under the current radius of curvature, that is 30mm, the radius criteria of curvature needs to be revised. These tests results will be so useful to revise and establish a customer cabling system for FTTH.

Evaluation of Seismic Performance of Valve Chamber System by Shaking Table Tests (진동대 실험을 통한 밸브실 시스템의 내진성능 평가)

  • Young-Soo Jeong;Kyeong-Seok Lee;Jin-Seok Yu;Hyung-Chae Jeong
    • Journal of the Korea institute for structural maintenance and inspection
    • /
    • v.28 no.1
    • /
    • pp.46-52
    • /
    • 2024
  • The structural safety of expansion joints for piping systems has been drawing attention owing to ruptures and leaks of water pipes caused by earthquakes and road subsidence at soft ground. In general, metal bellows are installed as expansion joints to prevent various damages in the piping system. In this study, the seismic performance of a valve chamber system was evaluated by performing earthquake shaking table tests. To validate the benefits to structural safety of metal bellows in connecting steel pipes to valve chambers, the seismic tests were conducted on expansion joints (bellows) and general pipping, and the results were compared for durability. Strain gauges were attached to measure the effects of the input motion. As a result of the shaking table test, it was confirmed that the strain of the valve chamber structure and inflow or outflow steel pipes were decreased in 1/100, 1/20 by applied to the expansion joints.

Proper Monitoring Methods for Safety Management of Tailings Dam (광물찌꺼기적치장의 안전관리를 위한 적정 모니터링 방안 연구)

  • Jung, Myung Chae;Kim, Jeong Wook;Hwang, In-ho;Yang, In Jae;Park, Jay Hyun;Park, Ju Hyun;Kim, Tae Youp
    • Journal of the Korean Society of Mineral and Energy Resources Engineers
    • /
    • v.55 no.6
    • /
    • pp.576-587
    • /
    • 2018
  • This study has focused on analysis factors affecting safety monitoring system at tailings sites, and the evaluation equipment to monitor the factors. Twenty sites at eighteen mines with unsafe conditions were selected to examine the equipment. There were three main factors influenced safety in the sites including surface erosion, piping, and slope instability. In detail, the surface erosion was divided into three sub-factors (planting, soil-topping layer, and tailings), piping into three sub-factors (liner, rain protection facility and leachate), and slop instability was also divided into three sub-factors (slop, concrete wall, and reinforcing wall). As results of in-field measurement, a CCTV was the most effective facility, and electrical resistivity survey, acoustic sensing, thermal liner sensor, structure inclinometer, rainfall meter, and flowmeter were also highly effective. According to applications of the facilities in the unstable tailings, structural defects were mainly found in the piping, which was the most important monitoring factor for safety management of tailings sites.

A Study on Cooling Performance of In-wheel Motor for Green Car (그린카용 인휠 모터의 냉각 성능에 관한 연구)

  • Jung, Jung-Hun;Kim, Sung-Chul;Hong, Jung-Pyo
    • Transactions of the Korean Society of Automotive Engineers
    • /
    • v.20 no.1
    • /
    • pp.61-67
    • /
    • 2012
  • The in-wheel motor used in green car was designed and constructed for an electric direct-drive traction system. It is difficult to connect cooling water piping because the in-wheel motor is located within the wheel structure. In the air cooling structure for the in-wheel motor, a outer surface on the housing is provided with cooling grooves to increase the heat transfer area. In this study, we carried out the analysis on the fluid flow and thermal characteristics of the in-wheel motor under the effects of motor speed and heat generation. In order to check the problem of heat release, the analysis has been performed using conjugate heat transfer (conduction and convection). As a result, flow fields and temperature distribution inside the in-wheel motor were obtained for base speed condition (1250 rpm) and maximum speed condition (5000 rpm). Also, the thermo-flow characteristics analysis of in-wheel motor for vehicles was performed in consideration of ram air effect. Therefore, we checked the feasibility of the air cooling for the housing geometry having cooling grooves and investigated the cooling performance enhancement.