• 제목/요약/키워드: Pipe Installation

검색결과 264건 처리시간 0.018초

해저관로의 대변형 굽힘에 의한 소성 모멘트 추정 (Estimation of Plastic Bending Moment of Offshore Pipelines)

  • 이종현;최한석;이승건
    • 한국해양공학회지
    • /
    • 제17권2호
    • /
    • pp.21-26
    • /
    • 2003
  • The reel-lay method of submarine pipelines a continuous string of pipe coiled onto a reel. Assembly of this pipe that is string is accomplished onshore by welding, and nondestructive testing is carried out prior to coiling the pipe. The total length of pipes on the reel depends on the reel and pipe diameters. Pipeline installation is accomplished by uncoiling, straightening the pipe, and laying out the pipe string onto the seabed as the barge moves forward. Installation associated with coiling and uncoiling is related to the bending moment and strain relationship of the pipeline, A highgrade pipe material is required when the reel-lay method is used. This paper is concerned with the highly plastic bending moment of the pipeline, including the effect of ovality. Moment calculation in the pipe is accomplished by the numerical method, including the variable ovalities during the plastic bending of the pipe string. The new calculation method of the high plastic bending moment was applied to the reel-lay method.

스프링클러 배관의 부식 특성과 대책에 관한 연구 (A Study on the Corrosion Property of Sprinkler Pipe and the Solution)

  • 김동성;조원철;김병선;이태식
    • 한국재난관리표준학회지
    • /
    • 제1권2호
    • /
    • pp.87-92
    • /
    • 2008
  • 본 논문에서는 화재소화장치로써 가장 효과적이며 가장 널리 사용되는 스프링클러 배관의 노후화시 나타날 수 있는 부식특성과 방지대책에 대해 연구했다. 본 연구를 위해 스프링클러배관으로 주로 사용되는 강관의 특성과 부식에 대하여 이론적으로 고찰했다. 부식은 주로 배관의 노후화와 시공오차에 기인한 것으로 조사되었으며, 스프링클러 배관의 시료를 채취하여 외형검사, 비파괴검사 및 기계적 성질 변화 분석 등 다양한 방법으로 배관 부식도를 분석하였다. 본 연구 결과는 스프링클러 배관의 부식특성과 부식 최소화 대책 수립에 대한 유용한 자료가 될 것으로 판단된다.

  • PDF

히트파이프를 사용한 조명용 LED의 냉각에 대한 연구 (A Study on the Cooling of High Power LED Component using Flat Heat Pipe)

  • 장영운;김병호;임익태
    • 반도체디스플레이기술학회지
    • /
    • 제8권4호
    • /
    • pp.25-29
    • /
    • 2009
  • In this study, a thin plate-type heat pipe, instead of a solid aluminium heat sink, is used to eliminate heat released from LED components for lighting. Effects of the heat pipe size and installation angle are studied both in numerically and experimentally. According to the results, temperature on LED chip, when a heat pipe is used, is $1.2^{\circ}C$ lower than using the conventional metal PCB. The overall temperature drop is $32^{\circ}C$ if the heat pipe is properly used. The highest cooling performance is obtained in the case when the angle of a heat pipe installation is $90^{\circ}$.

  • PDF

아파트에 설치하는 옥내소화전 압력계 설치가 배관의 가압수 식별 및 자체점검 용이성 간의 영향 분석 (An Analysis on the Effect of Pressure System Installation on the Pipeline to Identify Pressurized Water and Self-inspection Ease in Apartment Building)

  • 손주달;공하성
    • 대한안전경영과학회지
    • /
    • 제22권1호
    • /
    • pp.33-44
    • /
    • 2020
  • This study analyzed how the installation of a pressure gauge in the indoor fire hydrant of an apartment building affected identifying pressurized water in the pipe, making it easier to conduct internal inspection on the fire suppression system, and ensuring reliability of fire suppression. The following are the study's results: First, identifying pressurized water in the indoor firefighting pipe had a positive effect on the installation of a pressure gauge in the indoor fire hydrant. This implies that a higher level of identification of pressurized water in the indoor firefighting pipe had a positive impact on improving the installation and use of a pressure gauge in the indoor fire hydrant. Second, making it easier for the fire safety officer to inspect the fire suppression system had a positive effect on the installation of a pressure gauge in the indoor fire hydrant. This suggests that if it becomes easier for the apartment building's stakeholder to conduct internal inspection or the firefighting facility manager to carry out inspection on the fire suppression system, it would have a positive effect on the installation of a pressure gauge in the indoor fire hydrant. Finally, ensuring reliability in fire suppression had a positive effect on the installation of a pressure gauge in the indoor fire hydrant. This implies that if it becomes easier to identify pressurized water in the indoor firefighting pipe, for the fire safety officer to conduct internal inspection, or for the firefighting facility manager to carry out inspection in accordance with the fire suppression system's internal inspection requirements, it would increase reliability in fire suppression, making it more necessary to install a pressure gauge in the indoor fire hydrant.

굴착, 관 매입 및 다짐 연속과정에 따른 포장하부구조 강성펑가 (Substructure Evaluation of Pavement due to Excavation and Recompaction Sequences for Pipe Installation)

  • 임유진;박재범
    • 한국도로학회논문집
    • /
    • 제11권2호
    • /
    • pp.239-247
    • /
    • 2009
  • 매설관은 기존 포장의 제거와 굴착후 다짐 및 재포장에 의해 시공되며 주변지반의 침하와 균열, 재포장부의 침하발생과 평탄성 저하를 초래한다. 본 연구에서는 매설관의 설치와 뒷채움재의 다짐 및 재포장 등 일련의 시공과정에서 간과되고 있는 포장하부구조의 물성치 획득방법으로서 공내재하시험 및 동평판재하시험을 채택하였다. 공내재하시험 비교 결과, 관매설 및 새로운 뒷채움재의 다짐으로 인해 충분한 하부지반 강성이 굴착전에 비하여 획득되지 못함을 확인하였다. 재포장층의 두께는 기존층에 비하여 더 두껍게 설계되어야 함을 의미한다. 동평판시험은 공내재하시험에 비하여 층표면 강성을 파악하기에는 효과적이지만 매설관의 하부구성층 또는 뒷채움재 등의 전체 강성 또는 다짐도를 정확히 파악할 수 없음을 확인하였다.

  • PDF

Field investigation and numerical study of ground movement due to pipe pile wall installation in reclaimed land

  • Hu Lu;Rui-Wang Yu;Chao Shi;Wei-Wei Pei
    • Geomechanics and Engineering
    • /
    • 제34권4호
    • /
    • pp.397-408
    • /
    • 2023
  • Pipe pile walls are commonly used as retaining structures for excavation projects, particularly in densely populated coastal cities such as Hong Kong. Pipe pile walls are preferred in reclaimed land due to their cost-effectiveness and convenience for installation. However, the pre-bored piling techniques used to install pipe piles can cause significant ground disturbance, posing risks to nearby sensitive structures. This study reports a well-documented case history in a reclamation site, and it was found that pipe piling could induce ground settlement of up to 100 mm. Statutory design submissions in Hong Kong typically specify a ground settlement alarm level of 10 mm, which is significantly lower than the actual settlement observed in this study. In addition, lateral soil movement of approximately 70 mm was detected in the marine deposit. The lateral soil displacement in the marine deposit was found to be up to 3.4 and 3.1 times that of sand fill and CDG, respectively, mainly due to the relatively low stiffness of the marine deposit. Based on the monitoring data and site-investigation data, a 3D numerical analysis was established to back-analyze soil movements due to the installation of the pipe pile wall. The comparison between measured and computed results indicates that the equivalent ground loss ratio is 20%, 40%, and 20% for the fill, marine deposit and CDG, respectively. The maximum ground settlement increases with an increase in the ground loss ratio of the marine deposit, whereas the associated influence radius remains stationary at 1.2 times the pipe pile wall depth (H). The maximum ground settlement increases rapidly when the thickness of marine deposit is less than 0.32H, particularly for the ground loss ratio of larger than 40%. This study provides new insights into the pipe piling construction in reclamation sites.

해양플랜트 배관재 공정관리 방법에 관한 연구 (A Study on Process Management Method of Offshore Plant Piping Material)

  • 박중구;우종훈
    • 대한조선학회논문집
    • /
    • 제55권2호
    • /
    • pp.124-135
    • /
    • 2018
  • In order to secure manufacturing competitiveness of offshore plants, piping process is one of the most important processes. This study is about the design of management system for piping materials manufacturing of the offshore plant. As a result of the study, we analyzed the system and algorithms needed for the processing of piping material products and designed the structure of the entire management system. We conducted a process analysis of the design, manufacturing and installation processes. And also we proposed a system structure to improve the various problems that have come out. We also proposed an algorithm to determine the delivery order of the pipe spools, and proposed a raw material management system for the manufacturing of the pipe spools. And we designed a manufacturing process management system to manage the risk of pipe materials delivery. And finally we proposed a data structure for the installation process management system. The data structures and algorithms were actually implemented, and applied the actual process data to verify the effect of the system.

아연-황동관에 의한 배관 부식 억제 효과에 관한 연구 (A Study on the Effect of Corrosion Prevention in Water Distribution System by Galvanized Zinc-Brass Pipe)

  • 송승준;조영근;김진한
    • 도시과학
    • /
    • 제7권1호
    • /
    • pp.23-27
    • /
    • 2018
  • This research was carried out to investigate the corrosion prevention effect in the water distribution system by galvanized zinc-brass pipe which is using potential between brass and zinc. As a result of this study, pH and conductivity of influent were constant in spite of its installation, and it was difficult to estimate the effect of the installation with temporary increased and reduced concentration of Zn and Fe ions, respectively. However, since the corrosion rate of the steel coupon with galvanized zinc-brass pipe was relatively low, it has an effect of inhibiting corrosion.

배관망에서의 파이프 직경 최적설계에 대한 실용적 해법 (A Practical Approach for Optimal Design of Pipe Diameters in Pipe Network)

  • 최창용;고상철
    • 설비공학논문집
    • /
    • 제18권8호
    • /
    • pp.635-640
    • /
    • 2006
  • An optimizer has been applied for the optimal design of pipe diameters in the pipe flow network problems. Pipe network flow analysis, which is developed separately, is performed within the interface for the optimization algorithm. A pipe network is chosen for the test, and optimizer GenOpt is applied with Holder-Mead-O'Niell's simplex algorithm after solving the network flow problem by the Newton-Raphson method. As a result, optimally do-signed pipe diameters are successfully obtained which minimize the total design cost. Design cost of pipe flow network can be considered as the sum of pipe installation cost and pump operation cost. In this study, a practical and efficient solution method for the pipe network optimization is presented. Test system is solved for the demonstration of the present optimization technique.

곡관의 하류에 설치된 전자기유량계의 유량신호 특성에 관한 실험적 연구(난류 유동) (An Experimental Study on Installation Effects of Pipe Elbow on the Electromagnetic Flowmeter Characteristics (Turbulent Flow))

  • 임기원
    • 대한기계학회논문집B
    • /
    • 제26권11호
    • /
    • pp.1613-1621
    • /
    • 2002
  • An electromagnetic flowmeter(EMF) essentially averages the velocity distribution over the pipe cross- sectional area, and the measured value is dependent on the velocity profiles. In this study, installation effects of 90$^{\circ}$long elbow(KS B 1522, ISO 3419) on the EMF characteristics was investigated. A commercial EMF was adopted and the distribution of magnetic field in the electrodes cross section was measured. In the experiment, the national flow standard system, of which measurement uncertainty was evaluated in accordance with ISO 17025 recommendation, was used fur characterization of EMF. The leading line has 150D long straight pipe to established a fully developed flow before entering into the elbow and the elbow was installed downstream of it. then the flowmeter was tested within 50 D from the elbow. The installation effects of the flowmeter were investigated by varying the mean velocity(Reynolds No.)in pipe section, the locations and the direction of electrodes plane.($\phi$) From the experimental results, we find the optimal conditions to get most accurate measurements. Generally, the deviations from the calibration value were less than 0.5 % in farther than 10D distance from the elbow and the direction of electrode plane. $\phi$ = 90$^{\circ}$yielded the smallest measurement deviation. These characteristics were shown consistently in turbulent region regardless of the mean Reynolds number.