1 |
Back, M.G., Woo, J.H., Lee, P. & Shin, J.G., 2017. Productivity improvement strategies using simulation in offshore plant construction. Journal of Ship Production and Design, 32(3), pp.144-155.
|
2 |
Choi, K.S., 2010. Instruction to offshore plant. Munundang: Seoul.
|
3 |
Ham, D.K., Back, M.G., Park, J.G. & Woo, J.H., 2016. A Study of piping leadtime forecast in offshore plant's outfittings procurement management. Journal of the Society of Naval Architects of Korea, 53(1), pp.29-36.
DOI
|
4 |
Hur, M., Lee, S., Kim, B., Cho, S., Lee, D., Lee, D., 2015. A study on the man-hour prediction system for shipbuilding. Journal of Intelligent Manufacturing, 26(6), pp.1267-1279.
DOI
|
5 |
Lee, D.H., Park, J.H., Bae, H.R., 2013. Comparison between planned and actual data of block assembly process using process mining in shipyard. Journal of Society for e-Business Studies, 18(4) pp.145-167.
DOI
|
6 |
Lee, H.S., 2013. A case study on improvement of pipe outfitting production process using TOC. Master's Thesis. University of Ulsan.
|
7 |
Yan, W., 2012. Automatic generation of assembly sequence for the planning of outfitting processes in shipbuilding. Journal of Ship Production and Design, 28(2), pp.49-59.
|