• Title/Summary/Keyword: Performance Measurement Model

Search Result 1,334, Processing Time 0.027 seconds

Verification Model of the Feedwater Flow for the Calculation of Corrective Performance of Turbine Cycle (터빈 사이클의 보정 성능 계산을 위한 급수 유량의 검증 모델)

  • Kim, Seong-Kun;Yang, Hac-Jin;Lee, Kang-Hee;Choi, Kwang-Hee
    • Korean Journal of Air-Conditioning and Refrigeration Engineering
    • /
    • v.24 no.6
    • /
    • pp.538-544
    • /
    • 2012
  • Analysis of thermal performance is required for the economic operation of turbine cycle of power plant. We developed corrective model of main feed water flow which is the most important parameter for the precise analysis of turbine cycle performance. Classification model for the identification of feed water flow measurement status was applied to increase the suitability of the corrective model. We used neural network and support vector machine to develop estimation model of main feed water flow with more generalization capability. The estimation model can be used practically to evaluate corrective performance of turbine cycle plant.

An AHP Approach to Evaluate the priorities of Manufacturing Performance Criteria in Korean Automobile Parts Manufacturing Company (AHP에 의한 한국자동차부품제조사의 제조성과기준의 중요도 평가)

  • Kim, Tae-Soo
    • Journal of Korean Society of Industrial and Systems Engineering
    • /
    • v.34 no.3
    • /
    • pp.115-122
    • /
    • 2011
  • The critical role played by manufacturing performance measurement systems in achieving competitive success is increasingly recognized. Developing an integrated performance measurement model is significant for strategic management. This study consist of several principal steps. Performance criteria from the literature and an questionnaire were utilized prior to building the performance model. The AHP(Analytic Hierarchy Process) is utilized to evaluate the weight of each criterion when generating the performance measurement model for Korea automobile parts manufacturing company. AHP analysis showed clear difference in the priority between 5 criteria and 24 sub-criteria in terms of manufacturing performance of Korean automobile parts manufacturing company. The result of priority evaluation in the 5 criteria of 2nd level was ranked quality, cost, delivery, employee, flexibility. And the critical sub-criteria in the 24 sub-criteria of 3rd level was ranked claim rate, process defect rate, outsourcing parts defect rate, ability to quality management innovation, claim cost, etc.

Developing a Performance Measurement Index of Convenient Facilities Facilitation Project for People with Disabilities in Gyeongsangbukdo: Application of Logic Model (경상북도 장애인편의시설설치촉진사업 성과관리 평가지표 개발연구: 논리모형을 적용하여)

  • Song, Inuk;Won, Seojin;Kim, Donghwa
    • The Journal of the Korea Contents Association
    • /
    • v.19 no.5
    • /
    • pp.115-127
    • /
    • 2019
  • This study aims to address the needs and effectiveness of performance measurement system for convenient facilities support project for people with disabilities performed by local government. In addition, it is also to develop performance measurement index based on logic model. The researchers conducted literature review and focus group interview to develop the performance measurement index. Then, through the project managers and related professionals, the researchers tested validity of the measurement. The final measurement consisted of 38 questionnaires in 8 sectors. With this performance measurement system, we expect to establish rationalization of overall disability services. Also the theoretical framework and approach of performance measurement will be applicable to diverse public social service sectors.

Performance Measurement Model for Open Big Data Platform (공공 빅데이터 플랫폼 성과평가 모형)

  • RHEE, Gyuyurb;Park, Sang Cheol;Ryoo, Sung Yul
    • Knowledge Management Research
    • /
    • v.21 no.4
    • /
    • pp.243-263
    • /
    • 2020
  • The purpose of this study is to propose the performance measurement model for open big data platform. In order to develop the performance measurement model, we have integrated big data reference architecture(NIST 2018) with performance prism model(Neely et al. 2001) in the platform perspective of open big data. Our proposed model consists of five key building blocks for measuring performance of open data platform as follows: stakeholder contribution, big data governance capabilities, big data service capabilities, big data IT capabilities, and stakeholder satisfaction. In addition, our proposed model have twenty four evaluation indices and seventy five measurement items. We believe that our model could offer both research and practical implications for relevant research.

An Exploratory Study of the Development of a Performance Measurement Model for Knowledge Management for use by Government Sponsored Research Institutes (정부출연 연구기관의 지식관리 성과 측정모형 개발을 위한 탐색적 연구)

  • Jung, Taik-Yeong;Jung, Hae-Yong;Choi, Kwang-Don
    • Journal of Digital Convergence
    • /
    • v.7 no.3
    • /
    • pp.61-74
    • /
    • 2009
  • This research reviewed previous research related to Performance Measurement Models of Knowledge Management (PMMKM) in order to integrate their findings with more recent research and construct a new PMMKM. This new hypothetical PMMKM consists of an input sector, a process sector, an outcome sector, and an infrastructure sector. Each sector has three measurement items with the exception of the infrastructure sector which has two. Empirical analyses testing the overall performance model validity of the hypothetical PMMKM were favorable. However, it show be noted that the "share process" and "utilization process" items in the process sector merged into one single item. The same is true with the "individual outcome" and "organization outcome" items in the outcome sector found one single item. The study's results reveal three implications with respect to performance. First, there are derived integrated performance measurement sectors and items based on overall management process of knowledge management, which can be practically applied to the government related research entities. This became apparent after extensive review or previous theoretical studies related to the public sector and private sector. Second, weighted performance measurement of knowledge management using AHP (Analytic Hierarchy Process) Analysis makes it possible to propose PMMKM in government sponsored research institutes. Finally, measuring performance to management knowledge, as shown in this study, will prove useful for inside and outside experts who propose specific guidelines and methodologies for Knowledge management at government sponsored research institutes.

  • PDF

Vision-based dense displacement and strain estimation of miter gates with the performance evaluation using physics-based graphics models

  • Narazaki, Yasutaka;Hoskere, Vedhus;Eick, Brian A.;Smith, Matthew D.;Spencer, Billie F.
    • Smart Structures and Systems
    • /
    • v.24 no.6
    • /
    • pp.709-721
    • /
    • 2019
  • This paper investigates the framework of vision-based dense displacement and strain measurement of miter gates with the approach for the quantitative evaluation of the expected performance. The proposed framework consists of the following steps: (i) Estimation of 3D displacement and strain from images before and after deformation (water-fill event), (ii) evaluation of the expected performance of the measurement, and (iii) selection of measurement setting with the highest expected accuracy. The framework first estimates the full-field optical flow between the images before and after water-fill event, and project the flow to the finite element (FE) model to estimate the 3D displacement and strain. Then, the expected displacement/strain estimation accuracy is evaluated at each node/element of the FE model. Finally, methods and measurement settings with the highest expected accuracy are selected to achieve the best results from the field measurement. A physics-based graphics model (PBGM) of miter gates of the Greenup Lock and Dam with the updated texturing step is used to simulate the vision-based measurements in a photo-realistic environment and evaluate the expected performance of different measurement plans (camera properties, camera placement, post-processing algorithms). The framework investigated in this paper can be used to analyze and optimize the performance of the measurement with different camera placement and post-processing steps prior to the field test.

Development of Underwater Motion Measurement System for Model Test of Ocean System (해양시스템 모형실험을 위한 수중운동계측시스템 개발 연구)

  • CHOI JONG-SU;HONG SUP
    • Proceedings of the Korea Committee for Ocean Resources and Engineering Conference
    • /
    • 2004.11a
    • /
    • pp.166-172
    • /
    • 2004
  • An underwater motion measurement system was constructed for applications to the model basin. A commercial motion capture system, FALCON of Motion Analysis Corp., which corrects automatically the distortion caused by refraction of the light passing through water and air, was adopted for underwater motion measurement. The modifications of FALCON system were performed: waterproofing camera housings, markers, connectors, and a new blue ring lighter. the accuracy of the motion measurement was obtained within the calibration error of 0.87mm in average and 0.89mm in standard deviation for the distance of 500mm between two markers on the calibration device. the volume of $2100mm(length)\times2100mm(breadth)\times2300mm(Height)$ was covered with 4 cameras of the underwater motion measurement system. For the performance verification, motion measurement test of a vertical mooring chain model excited at the top end was carried out. The 3D motions of mooring model were measured with variable amplitude and period of the forced excitation. Higher order motions of the mooring model were observed as the excitation period decreases. the performance of the system was verified by successfully measuring 3D motion of mooring model.

  • PDF

Economic Model of Performance Measurement for Technical and Vocational Education in Developing Countries Using Official Development Assistance (개도국 직업훈련학교에 대한 공적개발원조 시 경제적 성과 측정 모형)

  • Ghang, Bong-Jun
    • The Journal of Korean Institute for Practical Engineering Education
    • /
    • v.3 no.1
    • /
    • pp.103-109
    • /
    • 2011
  • The ODA(Official Development Assistance) of Korea is growing considerably, and the ODA projects in the technical and vocational education have the good performance to the recipient countries, because they have the direct and quick benefits. But there are no economic model of performance measurement for the ODA in the technical and vocational education. The purpose of this study is to develop the economic model of measuring the performance of the ODA in the technical and vocational education. This study use the ROI model using financial information and the BSC model using non-financial information, and link each model closely. The ROI model using financial information is more relevant, because the benefits of the technical and vocational education are distinct and quick to the recipient groups.

  • PDF

R&D performance measurement model - Quantitative value measurement of technology and Its capitalization - (연구개발투자의 성과측정 모형 - 기술의 정량적 가치추정과 자산화 방안 -)

  • 조현춘;박상덕
    • Proceedings of the Technology Innovation Conference
    • /
    • 1999.12a
    • /
    • pp.159-177
    • /
    • 1999
  • Many companies still struggle with the issue of research and development(R&D) performance measurement, in particular, the nonfinancial performance measurement of R&D with coming of knowledge-based society, Of course, we would not deny the fact that financial measures play the central role in assessing the overall performance of R&D, The aim of this paper is to provide the new model to evaluate the quantitative value of technology (nonfinancial benefits). This new model is based on the technology stock(technology level) acquired in R&D process, That is, we take it for granted that the acquired technology below a certain level(<70% compare to the advanced country) can not be utilized in developing the new products or in proving the manufacturing processes, The evaluation model we create can explains the quantitative relation between the technology stock and the market value considering R&D expenditure to acquire the technology above certain level(>70%) and cost to prevent the technology obsolescence. The value of non-destructive testing technology, which is one of the electric Power technology, is measured quantitatively using our new model as a case study, We also discussed briefly the possibility of capitalization of the measured technology value.

  • PDF

Study on the Supply Chain Management Success Model and Performance Measurement Indicators (SCM 성공모형 및 성과측정 지표에 관한 연구)

  • Choi Il-Yong;Choi Hyung-Rim;Kim Hyun-Soo;Hong Soon-Goo;Kang Moo-Hong
    • Journal of Korea Society of Industrial Information Systems
    • /
    • v.10 no.2
    • /
    • pp.87-101
    • /
    • 2005
  • Many studies on the SCM related topics have been carried out during the last decade. However, most of research focused on identifying critical success factors of SCM with collaborations between partners. There have been a need for the integrated SCM success model and for identifying indicators of SCM performance measurement. In this study, we suggest the SCM success model classifying 5 aspects with key indicators for measurement. The suggested model can be applied to the measurement of SCM success.

  • PDF