• Title/Summary/Keyword: Performance Assessment Factors

Search Result 504, Processing Time 0.031 seconds

Developing the Ecological Performance Standard for Replaced Wetlands by Analyzing Reference Wetlands (표준습지 분석을 통한 대체습지의 생태 성능 기준 개발)

  • Koo, Bon-Hak;Jeong, Jin-Yong;Park, Mi-Ok
    • Journal of the Korean Society of Environmental Restoration Technology
    • /
    • v.14 no.1
    • /
    • pp.11-22
    • /
    • 2011
  • This study was established to build and suggest the Ecological Performance Standards for replaced wetlands as the mitigation strategies for the construction projects. The request performance and assessment factors and standards were derived by bibliographic review and verified by the field survey for the reference wetlands. And the weights for each factor were derived by AHP(Analytical Hierarchy Process) method. The results are as follows : 1) Assessment factors were induced by in-depth research of many wetland assessment models and benchmarks evaluated ecological functions. This study proposed final 12 assessment factors through ecological specialist and experts interviews added with literature analysis. 2) 10 natural wetlands were selected as Reference Wetlands as the measure to propose assessment factors and assessment criteria. Those reference wetlands are well-conserved inland natural wetlands classified to the one having worthy to conserve (grade "high") according to RAM(Rapid Assessment Method). Reference wetlands chosen by the study are Parksilji, Jeongyangji, Mulkubi, Bawineupkubi, Jilnalneup, Jinchonneup, Doomoso, Haepyung wetland, Whangjeong wetland, and Whapo wetland. The research developed assessment criteria for the performance assessment factors based on several explorations of the reference wetlands. 3) "Requiring performance" of replaced wetlands is defined as "to carry out similar or same ecological functions provided by natural wetlands", in overall. The detailed requiring performances are as follows; ${\bullet}$ to play a role of wildlife habitats ${\bullet}$ to have biological diversity ${\bullet}$ to connect with other ecosystems ${\bullet}$ to provide water environment to perform good ecological functions 4) The assessment factors for required performance are categorized by wildlife habitat function, biological diversity, connectivity of adjacent ecosystem, and water environment. Wildlife habitat category is consisted of wildlife habitat creation, size of replacement wetland, and site suitability. Biological diversity category contains the number of plant species, the number of wildlife species, and number of protected species as the sub-factors. Connectivity of adjacent ecosystem is comprised of wildlife corridor, green network and distance from other ecosystem. Finally, water environment make up with water quality, depth of water body, and shape of waterfront. 5) Finally, every assessment factors were verified and weighted by the AHP methods and the final standards were proposed. The weights of factors of requiring performance suggested as habitat (0.280), connectivity (0.261), diversity (0.260), hydraulic environment (0.199). And those of detailed sub-factors are site suitability (0.118), protected species (0.096), distance to neighbor ecosystem (0.093), habitat creating (0.091), green corridor (0.090) etc.

The Risk Assessment Effects of SCM and the Strategy of Risk Management on Supply Chain Performance (공급사슬 위험평가 및 위험관리전략이 공급사슬 운영성과에 미치는 영향)

  • Kim, Dong Jeong;Lee, Young Jai
    • Journal of Information Technology Applications and Management
    • /
    • v.21 no.4
    • /
    • pp.173-186
    • /
    • 2014
  • This study outlines possible risk factors in the SCM of a company and correlates risk assessment, the strategy of risk management, and the supply chain performance. The data is surveyed from an international Korean company and is analyzed by the structure equation model of actual proof. The research model verifies the correlation between the risk assessment, the strategy of risk management, and the supply chain performance as dependent variables after the risk factors of the SCM are defined as independent variables. The research shows that there are consecutive links among the risk factors of the SCM, the risk assessment, and the strategy of risk management. The strategy of risk management was conclusively determined to have an effect on supply chain performance. Therefore, improving the supply chain performance of a company requires the constructive process for risk management based on a correlation between risk assessment and the strategy of risk management.

An Importance and Performance Analysis regarding Classroom Assessment - Professional General Education and MSC curriculum in the Engineering College Enrichment Program - (학습 평가에 대한 중요도 및 수행도 분석(IPA) - 공과대학 심화프로그램의 전문교양 및 MSC 교과목을 중심으로 -)

  • Noh, Jin-Ah;Choi, Yu-Hyun
    • Journal of Engineering Education Research
    • /
    • v.17 no.3
    • /
    • pp.51-58
    • /
    • 2014
  • The main objective of this research lies in estimating how much importance the educators of professional general education and MSC curriculum put on assessment, and, thereafter, take what support should be provided for the efficient assessment of education. The subjects of this research are educators of professional general education and MSC curriculum in the engineering education enrichment program at the 58 universities out of 72 universities where the accreditation for engineering education is implemented. Accordingly questionnaires were distributed to a total of 58 universities among which 136 questionnaires were collected. The data analysis methods, mean and response sample T test, were used in this research. The following conclusions were drawn from the results of this research. First, tile mean of importance and performance in the 'assessment activities' were relatively high. However, in tile assessment, the assessment performance was relatively lower than the assessment importance. Second, the results of the Importance-Performance Matrix in the 'assessment activities' was analyzed by two ways. First, Analyzed with the scale mean, The result means that Keep up the Good Work (KGW) sector included all factors. Second, Analyzed with the actual mean, The result means that KGW sector included 5 factors A, J, B, D, C. Possible Overkill(PO) sector included factors C, I. Low Priority(LP) sector included 4 factors K, E, H, L. Concentrate Here (CH) sector included factor G.

Development of Early Evaluation System for Concrete Quality, Construction and Maintenance (콘크리트 품질ㆍ시공ㆍ유지관리의 조기판정시스템 개발)

  • 손용우;이증빈;최미라;박봉수
    • Proceedings of the Computational Structural Engineering Institute Conference
    • /
    • 2004.10a
    • /
    • pp.517-526
    • /
    • 2004
  • In the resent years, the early evaluation of concrete quality, construction and maintenance has been considered as all is of major concern due to the increase of loading and the degradation of structures related with time. This paper presents evaluation of structural safety performance using measured data of construction, on the basis of a field measurements for the prevention of unreliable concrete works. Measurements analyzed in this paper are early quality condition and performance assessment, serviceability performance by cracks and deflection, rating performance by loading, durability performance by chloride attack and carbonation. Thus, a quantitative assessment model of resistance capacity was developed here to meet the requirement for deteriorated concrete structures. The model focuses on damage mechanical of concrete structures deteriorated by initial damage factors for concrete quality and environment factors such as chloride and carbonation attacks. These results could provide useful information for concrete structures interested in design, construction and maintenance.

  • PDF

Comparative Analysis of Work Stress Assessment Tools for Estimating Human Work Performance (업무수행도 추정을 위한 직무스트레스 평가표의 비교 분석)

  • Jang, Tong-Il;Lee, Yong-Hee;Han, Kyu-Jeong;Lim, Hyeon-Kyo
    • Journal of the Korean Society of Safety
    • /
    • v.29 no.6
    • /
    • pp.144-150
    • /
    • 2014
  • A man is a component of a large system how complex it may be so that human performance which can influence on the system safety should be included in system safety assessment. Meanwhile, human performance can vary over time due to lots of factors. Among them, stress is an indirect factor that may cause human error which can result in industrial accidents. To assess stress level of human workers, not a few assessment tools have been developed. However, it can be questionable to utilize them for human performance anticipation because they were mainly developed with the viewpoint of mental health, though stress assessment can be also required in the safety aspect. Therefore, this study aimed to survey the possibility of their application with safety purpose. About 10 kinds of work stress tools were collected and analyzed with reference to assessment items, assessment and analysis methods, and follow-up measures. The results showed that most tools focused their weights on Demands, Supports, and Relationships, in sequence. However, they, except only one tool developed by the Japanese researchers, merely advised to set up counterplans in PDCA cycle or risk management activities. In consequence, application of stress assessment tools mainly developed for mental health seemed impractical for safety purpose with respect to human performance anticipation so that it was concluded that development of a new assessment tools aimed to human performance variation and accident prevention would be inevitable.

Dynamic Sustainability Assessment of Road Projects

  • Kaira, Sneha;Mohamed, Sherif;Rahman, Anisur
    • International conference on construction engineering and project management
    • /
    • 2020.12a
    • /
    • pp.493-502
    • /
    • 2020
  • Traditionally, road projects are initiated based on an assessment of their economic benefit, after which the environmental, social and governance effects are addressed discretely for the project according to a set of predetermined alternatives. Sustainable road infrastructure planning is vital as issues like diminishing access to road construction supplies, water scarcity, Greenhouse Gas emissions, road-related fatalities and congestion pricing etc., have imposed severe economic, social, and environmental damages to the society. In the process of addressing these sustainability factors in the operational phase of the project, the dynamics of these factors are generally ignored. This paper argues that effective delivery of sustainable roads should consider such dynamics and highlights how different aspects of sustainability have the potential to affect project sustainability. The paper initially presents the different sustainability-assessment tools that have been developed to determine the sustainability performance of road projects and discuss the inability of these tools to model the interrelationships among sustainability-related factors. The paper then argues the need for a new assessment framework that facilitates modelling these dynamics at the macro-level (system level) and helping policymakers for sustainable infrastructure planning through evaluating regulatory policies.

  • PDF

The Impact of BCMS Risk Assessment on Business Performance (BCMS의 위험평가가 경영성과에 미치는 영향)

  • Jang, Geun-Young;Kim, Deok-ho;Cheung, Chong-Soo
    • Journal of the Society of Disaster Information
    • /
    • v.17 no.1
    • /
    • pp.81-96
    • /
    • 2021
  • Purpose: Based on the preceding studies in supply chain management, factors were analyzed to verify the effect of risk assessment and risk management factors of the business continuity management system (BCMS) on management performance. The purpose of this study is to establish a systematic risk management plan by deriving the risk factors of BCMS and evaluating unpredictable risks, and at the same time, contributing to a company's competitive advantage without interruption of work. Method: The structural relationship between risk assessment, risk management and management performance of BCMS was derived. To this end, a questionnaire survey was conducted of 124 managers and managers in Korean companies. Frequency analysis, validity analysis, reliability analysis, correlation analysis, and simple regression analysis were performed. Result: First, risk assessment had a positive (+) effect on risk management. Second, risk management had a positive (+) effect on management performance. Finally, risk assessment had a positive (+) effect on management performance. Conclusion: BCMS's risk assessment and risk management capabilities should be managed through financial performance, and risk management activities should be managed through non-financial performance.

A Study on the Determining Factors For Assessment Criteria of Project Performance Capability of CM(Constuction Management) Considering Safety (안전을 고려한 건설사업관리 용역업자(CM) 사업수행능력 평가기준 요인 도출 연구)

  • Kim, Do-Su;Shin, Yoon-Seok
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2019.11a
    • /
    • pp.52-53
    • /
    • 2019
  • The construction industry has the most safety accidents among domestic industries. Special care must be taken because disasters in the construction industry lead to social problems caused by huge property losses and casualties. As a result of this, there is a growing awareness of disasters occurring in the construction industry, and government departments are tightening regulations on safety management. In particular, the OSHA(Occupational Safety and Health Agency) focuses on the expansion of protection targets and the clarification of responsibility in the full amendment OSHA. As a result, a study that focuses on safety management by client's responsibility is needed. In this study, the project performance capability assessment of construction project management contractors, which is being carried out with uniform assessment criteria without considering the characteristics of the construction project, is considered and all the amendments to the OSHA are considered, and the factors were derived for improvement measures.

  • PDF

QFD Model for Quality Performance Self-assessment

  • Liu, Yumin;Xu, Jichao
    • International Journal of Quality Innovation
    • /
    • v.7 no.1
    • /
    • pp.112-127
    • /
    • 2006
  • How to measure Quality Performance (QP) or excellence performance in organizations is very important for improving the quality of an organization's products and services. This paper takes Quality Function Deployment (QFD) as a useful tool to identify the key characteristics of quality performance and measure the influence factors on quality performance. Most national quality awards provide a framework of the criteria to show the essential elements of an organization's quality performance and get the Quality Performance Score (QPS) by self-assessment using the criteria. By means of these criteria, especially, the criteria of China Quality Award (CQA), a measurable indicator system for quality performance is set up. A four-phase QFD model of assessment for quality performance is developed. This QFD model not only presents the most important efforts for the deployment of the measurable indicators of quality performance, but also takes great advantage of evaluating the quality performance and obtaining the quality performance score. The measurable indicator hierarchy of quality performance is formed and its implementation method for assessment quality performance is described in this paper.

Teacher′s Attitude and practical Application of Performance Assessment in the Home Economics Education (가정교과 교사의 수행평가에 대한 태도와 실시현황에 대한 연구)

  • 유인영;윤인경
    • Journal of Korean Home Economics Education Association
    • /
    • v.13 no.1
    • /
    • pp.93-106
    • /
    • 2001
  • The purpose of this research is to study the performance assessment made by high school home economics teachers : their awareness and attitudes toward the assessment correlate with the qualitative output of the executions of it. as well s to determine how their awareness and attitudes toward the assesment correlate with the qualitative output of the executions of their performance assessments. The research has yielded the following results : 1. The attitudinal score shows above average of 58.7/90. By the sub-factors. awareness of the characteristics of performance assessment is 20.6/30 : the favorable attitudinal score is at 20.0/30. the behavioral attention at 9.5/15. and the effects of performance assessment on the teachers and the classes at 8.6/15. 2. In a single semester. the highest frequency of executing performance assessment is between 1 to 2 times (58.7%). and practical skill test is proven to be the most frequently used category at 79.9%. 3. The correlation between the overall attitude on performance assessment and the quality of actual performance assessment executed is high. indicating superior quality of performance assessment. which is directly proportionate to the enhanced attitude of teachers on performance assessment.

  • PDF