Proceedings of the Korean Society of Surveying, Geodesy, Photogrammetry, and Cartography Conference
/
2004.04a
/
pp.227-232
/
2004
In this study, we extracted road surface information which are required highway pavement management system from the obtained digital imagery and these digital image data were analyzed. Thus, this paper says the higyway surface management system and information of surface conditions which are required to management of highway pavement
PURPOSES : Pavement Management System contains the data that describe the condition of the road. Under limited budget, the data can be utilized for efficient plans. The objective of this research is to develop a mixed integer program model that maximizes remaining durable years (or Lane-Kilometer-Years) in road maintenance planning. METHODS : An optimization model based on a mixed integer program is developed. The model selects a cluster of sectors that are adjacent to each other according to the road condition. The model also considers constraints required by the Seoul Metropolitan Facilities Management Corporation. They select two lanes at most not to block the traffic and limit the number of sectors for one-time construction to finish the work in given time. We incorporate variable cost constraints. As the model selects more sectors, the unit cost of the construction becomes smaller. The optimal choice of the number of sectors is implemented using piecewise linear constraints. RESULTS : Data (SPI) collected from Pavement Management System managed by Seoul Metropolitan City are fed into the model. Based on the data and the model, the optimal maintenance plans are established. Some of the optimal plans cannot be generated directly in existing heuristic approach or by human intuition. CONCLUSIONS:The mathematical model using actual data generates the optimal maintenance plans.
Korean Journal of Construction Engineering and Management
/
v.8
no.1
s.35
/
pp.124-131
/
2007
Project management means usually managing the rate of construction progress. But it also contains preparing scheme of execution and establishing plan for equipment, material, labor force to finish project within expected duration. In this paper to establish effective project planning a road pavement operation is selected as a case and simulation method is used for analyzing it. Next probability distributions are created after analyzing collected data and these are reflected in simulation model. Simulated result is compared with real project planning using models of lean concrete pavement process and concrete slab pavement process to verify efficiency of this model. In the event we know that project planning using simulation is more effective than one of the field in the aspects of duration and cost. Meanwhile simulated result in this paper has a limitation in accuracy because various constraints of filed are not reflected in it. However if we reflect this constraints in model through examining field in future this limitation is expected to be improved.
KSCE Journal of Civil and Environmental Engineering Research
/
v.30
no.5D
/
pp.497-504
/
2010
In this paper, the author presents a reliability estimation technique to analyze the effects of traffic loads on pavement mean life based on the national highway database of Suwon and Uijeongbu region from 1999 to 2008. The estimation of the mean life, its standard deviation and reliability for pavement sections are calculated by using an appropriate distribution, Lognormal distribution, based on reliability theory. Furthermore, the probability paper method and Maximum likelihood estimation are both used to estimate parameters. The author found that mean life of newly constructed sections and over-layed sections is about 6.5 to 7.9 years and 7.3 to 9.1 years, respectively. The author also ascertained that the results of cumulative failure probability for pavement life between the proposed methods and observed data are similar. Such an assessment methodology and measures based on reliability theory can provide useful information for maintenance plans in pavement management systems as long as additional life data on pavement sections are accumulated.
KSCE Journal of Civil and Environmental Engineering Research
/
v.33
no.4
/
pp.1639-1650
/
2013
Road pavement management is an important activity that affects to national economy, movement and safety of people, and also demands huge amount of budget. Therefore, its management strategy must be established under objective information. In addition, decision support system that produces the management strategy needs to consider practical benefits from various aspects. Considering these aspects, this paper aimed to develop a customized Korean life cycle cost analysis model estimating various effects on road users and socio-environmental costs based on pavement condition. The suggested LCCA model focused on Korean national highway, and tried to adopt a national guideline recommended by Korean government for securing credibility of estimation results. In the development processes, some of the suggestions that do not fit well in the situations of pavement management field were added, altered, or partially modified. These attempts to develop customized asset management system would be an important step to break away from passive attitudes relying on ready-made software, but also to improve awareness about the social benefits from the better maintenance strategy.
In Korea, Expressway and National Highway System has been continually managed by their own pavement management system. The pavement condition evaluation system has not been developed for the municipal roads except for Seoul city. Therefore, this study focuses on analyzing the characteristics of distress in major city's pavement and developing the pavement condition index for the municipal PMS. Panel rating and pavement condition survey for the selected pavement sections were conducted for developing pavement condition index. Municipal level pavement condition index(MPCI) was developed by statistical analysis. Also, a sensitivity analysis for each independent variable of the MPCI and comparison with other pavement condition indicies, such as SPI and HPCI, were performed.
A pavement construction process consists of series of lay-down operation for pavement materials to form a designated thickness and compaction operation for the lay-down layer to form a designated strength. A technological breakthrough in pavement compaction equipment was made in last 15 years in western countries: intelligent compaction roller, that is equipped with GPS along with other pavement response sensors is becoming a game-changer in pavement construction. This paper introduces AR system that may be used in asphalt pavement compaction operation using intelligent compactor. Since AR technology is very new concept in road construction society, a suggestion for accompanying education program was also made for specific task group in pavement compaction operation. Since AR technology has not been introduced in asphalt pavement compaction operation, the AR compaction management would lead the construction quality of asphalt pavement to the beyond level.
Proceedings of the Korea Concrete Institute Conference
/
1997.10a
/
pp.183-188
/
1997
From a viewpoint of construction cost and preserving management of pavement, a policy of domestic pavement was gradually spreaded concrete pavement rather than asphalt. But the use of concrete with ordinary portland cement has shortages, such as dry-shrinkage, low flexural strength, etc. In order to overcome these problems, the concrete pavement using CSA expansive additive (Non-Shrinkage Cement) was studied and carried out the fie이 application. As the results, we find out Non-Shrinkage Cement that was distinguished in short-term construction by increasing flexural strength, shrinkage compensating and low-heat evaluation compared with OPC concrete.
Korean Journal of Construction Engineering and Management
/
v.24
no.4
/
pp.3-13
/
2023
The purpose of this study is to compare and analyze the performance and work productivity of wet type pavement cutters and sludge suction type pavement cutters (hereinafter referred to as automatic pavement cutters) developed to reduce scattering dust. We first investigated the development status of wet type manual pavement cutters that are mainly used in Korea and automatic pavement cutters, and analyzed the pavement cutting work in detail. And the standard cutting performance was derived by measuring the cutting time by depth by applying the two equipment to the test bed under the same conditions. However, there is a limitation that the data measured in the test bed does not reflect the various variables of the actual pavement cutting site. Therefore, in this study, data was collected through field surveys, and the correlation between cutting distance and time was analyzed, and then a model for calculating the productivity of pavement cutters was presented through simple regression analysis. As a result of comparative analysis of the values derived from the regression equation with the standard cutting performance derived from the test bed, the cutting performance derived through the regression equation showed a similar trend to the standard cutting performance. Finally, we verified the usability of the automated pavement cutter developed by qualitatively analyzing three tasks that are difficult to measure quantitatively but affect productivity.
National highway is one of the social infrastructures that continue to be managed in order to serve their full functions. The national highway has been managed by the Pavement Management System (PMS) until now. The PMS manages the highway as a way of facility maintenance and maximizes the service life of the highway with minimum cost. The cost is evaluated mainly with a facility manager's perspective based on engineering judgment. People's needs of quality of life have been increased as their income level is rising and naturally the opinion of citizen as a taxpayer plays an important role in determining national policy. Therefore, the contentment of a user's perspective was the starting point of addressing these needs. The Level of Service began to be used as a measure for the evaluation of the user's perspective. In this thesis we would like to design an application and a data architecture for a pavement asset management system and to show how it meets the requirements of KTAM-40 Systems.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.