• Title/Summary/Keyword: Parking lot management

Search Result 114, Processing Time 0.031 seconds

A Study on Normal Project Period for Parking Lot of Aged Apartment Housing (노후 공동주택 주차장 리모델링 공사 표준공기 설정에 관한 연구)

  • Bang, Seongbae;Jang, JunYoung;Koo, Choongwan;Kim, Taewan;Lee, Chansik
    • Korean Journal of Construction Engineering and Management
    • /
    • v.22 no.6
    • /
    • pp.107-119
    • /
    • 2021
  • Recently, interest in remodeling apartment houses has been increasing due to problems such as a lack of parking spaces for old apartment houses. However, no method was suggested to predict the construction period of the apartment remodeling project. Unlike general apartment new construction, apartment remodeling construction involves demolition or reinforcement work, so a realistic remodeling construction period calculation plan differentiated from the existing construction period should be proposed. Therefore, this study intends to present a model for deriving the construction period of the underground parking lot of the apartment remodeling construction. Each construction period was calculated based on 19 activities of underground parking lot remodeling work through review of previous studies and expert advice. Activity's workload data and productivity data were derived to calculate the construction period, and the number of inputs and equipment inputs by Activity were determined to correct the productivity data. The construction period of Activity was calculated using the derived data, and the criteria for calculating the overlapping period for each Activity were presented to enable realistic construction period and scheduled schedule. As a result of predicting the accuracy of the construction period through the verification of the case complex, it is expected that it will be possible to predict the approximate construction period of the underground parking lot of the apartment remodeling construction in the future.

A Study on the Functional Analysis of Parking Lot Expansion Technology using Technology-Tree (기술트리를 이용한 주차장 확대 기술의 기능분석에 관한 연구)

  • Youn, Bohyung;Choi, Jaewook;Park, Sungpyo;Kim, Taewan;Lee, Chansik
    • Korean Journal of Construction Engineering and Management
    • /
    • v.20 no.3
    • /
    • pp.64-76
    • /
    • 2019
  • Aged apartments lack parking space and are suffering from severe parking difficulties due to the increase in the supply of private cars due to the economic improvement. Efficient remodeling technology is required as a way to solve the problem of a shortage of parking spaces, but there is a lack of establishing a technology for remodeling plans that can reflect the characteristics of various parks. This study was conducted to analyze the functions of the parking lot expansion technology using the technology tree and to derive the final technology through the function deployment. As a result of functional deployment of the plan to expand the parking lot, the fifth function was deployed and a total of 22 technologies were derived. Four types of technologies are categorized, four technologies for underground expansion, 12 technologies for underground and ground expansion, two technologies for ground expansion, and four technologies for ground-based expansion. As a result of the functional deployment of the main entrance plan, the fifth function was deployed and derived with 22 technologies. The total technologies were grouped into four categories, four technologies for direct underground entry, 11 technologies for indirect underground entry, three technologies for direct access to ground, and four technologies for indirect entry to ground. Through case verification, the detailed technologies applied to the semi-industrial complex of remodeling were identified and expert surveys and interviews were conducted to verify the adequacy of the technology tree.

A Low Power Parking Management System for Intelligent Building (인텔리전트 빌딩을 위한 저 전력 주차관리 시스템)

  • Lee, Chang-Ki;Im, Hyung-Kyu
    • The Journal of the Korea institute of electronic communication sciences
    • /
    • v.7 no.6
    • /
    • pp.1479-1485
    • /
    • 2012
  • The parking management system can increase driver's convenience with detailed parking information service in the parking lot. At the same time, parking management system consumes non-negligible electrical energy with large amount of sensors, displays and control modules. With the increase in the demand for green and sustainable building design all over the world, it becomes a meaningful issue for parking management system to reduce operating power. This paper presents the preliminary design and estimated results of a parking management system which is optimized to reduce the power consumption mainly on detectors and displays. The system design is based on pre-developed wireless parking detectors, Park Tile and Park Disk. The system has a number of parking space detectors, vehicle count detectors, information displays, guidance terminals and other control units. We have performed system architecture design, communication network design, parking information service scenario planning, battery life regulation and at last operating power estimation. The estimated operating power was 0.93KW per parking-slot, which is 20% of traditional systems. The estimated annual maintenance cost was 18% of traditional systems.

Alternative Tracing Method for Moving Object Using Reference Template in Real-time Image - Focusing on Parking Management System (참조 템플릿 기반 실시간 이동체 영상을 이용한 대안적 탐지 방안 - 주차관리시스템을 대상으로)

  • Joo, Yong Jin;Kang, Lee Seul;Hahm, Chang Hahk
    • Journal of the Korean Society of Surveying, Geodesy, Photogrammetry and Cartography
    • /
    • v.32 no.5
    • /
    • pp.495-503
    • /
    • 2014
  • As the number of vehicles has been sharply increases, the significance of safety and effective operation issues in the parking lot is being emphasized, which takes a part of the transportation system. Recently, there have been several studies for the parking management by detecting moving object, however, recognizing numbers of fast-moving vehicles simultaneously in the picture is still a challenging problem. The parking lot in public area, or large-sized buildings has clear parking section, whereas the sensor system is configured to monitor a plurality of parking spaces. Therefore, by considering those parking lots, we suggested to develop the real-time parking availability information system by applying the real-time image processing techniques. with the help of template matching. Following the study, we wanted to provide the alternative method for parking management system through the reference template makers by recognizing movements of parked vehicles with the size and shape, regardless of direct detecting of driving movements. In addition, we evaluated the applicability and performances of the information system, presented in this study, and implemented a prototype system to simulate the parking statuses of each floor. In fat, it was possible to manage and analyze statistics about the total number of parking spaces and the number of vehicles parked through real-time video flames. We expected that the result of the study will be advanced, following the user-friendliness and cost reduction in operating parking management system and giving information by efficient analysis of parking situation.

A Study on the Improvement of Indoor Environment in the Underground Parking Lot of Apartments in Jeonju City (전주시 공동주택 지하주차장의 실내환경 개선에 관한 연구)

  • Jung, Jaeyoun;Jeong, Insoo;Bao, Wei
    • Journal of the Korean Institute of Rural Architecture
    • /
    • v.22 no.1
    • /
    • pp.1-12
    • /
    • 2020
  • The main purpose of the research is to prevent residents who are using underground parking lot from being exposed to pollusion, and to allow them to enjoy clean indoor environment. The study subject for the research are underground parking lots in 20 different apartments, 4 of them were constructed before 2000, 10 were constructed from 2000-2010, and the rest were constructed after 2010. By analyzing the air quality in these underground parking lots, we found out that O3, NO2, CO, PM10, Radon in all parking lots were not excessive compared to the standard limit. TVOC rate was measured with the value in between 312 ~ 2,137㎍/m3, with CO2 value in between 193~1,824 ppm, and HCHO with the value in between 0.01~1.52ppm. The lightning system in underground parking lots in apartments constructed before 2000 were using manual light control system, while automatic light control system was used in all apartments constructed after 2000, and the brightness of parking lots in apartments constructed before 2000 was quite low. The apartments constructed after 2000 are performing cleaning and ventilation due to management agreement, while the apartments constructed before 2000 are not performing regular cleaning and there was no mechanical ventilation system installed. The difference of indoor air quality was significant seasonally, daily, and yearly (year of construction), while illuminance was significantly different yearly.

The Development of a Model for Selecting Method of Entry for Apartment in Remodeling an Underground Parking Lot (지하주차장 리모델링 공사시 주동진입방법 선정 모델 개발)

  • Song, Nak-Hyun;Jung, In-Su;Lee, Chan-Sik
    • Korean Journal of Construction Engineering and Management
    • /
    • v.10 no.2
    • /
    • pp.65-74
    • /
    • 2009
  • It is expected that the number of apartment complexes in Korea that are over 20 years old will rapidly increase to more than 3,500,000. Consequently, the remodeling of these buildings is being revitalized throughout the country. Among the requirements for such remodeling, the expansion of parking lots has considerable weight. When enlarging a parking lot, the access route from an underground floor to the main building (i.e., the means of entry into the main building) determines the possibility of vertical enlargement for elevators, the size of the parking lot, the construction period, and construction expenses, etc. When enlarging an underground parking lot of an apartment complex, the access between the main building and the parking lot, as well as the inhabitants' requirements for entering the main building, are generally determined based on the designer's experience, rather than on the exact estimation of the peculiarity of the complex. In order to resolve such a problem, when enlarging an underground parking lot, a systematic and rational method is needed for selecting the means of entry into the main building. In this study, a selection model is derived for the method of selecting an access route into the main building when constructing an underground parking lot, in order to provide a reasonable decision-making process. A research method was investigated for determining the access route into the main building when enlarging a parking lot. On the basis of research carried out through in-depth interviews with experts, the characteristics for each means of entry into the main building were analyzed and the factors affecting the selection of the access route were deduced. The affecting factors selected were construction efficiency, convenience efficiency and economic efficiency. Weight values were then estimated for the selected affecting factors by applying the AHP method. Results showed that convenience efficiency, which gained the highest value, is the most important factor in selecting the means of entry into the main building. The most suitable means of entry into the main building was also suggested after estimating the applicability of the site by selecting complexes with remodeling possibility. This study will be applied as a reference for selecting the means of entry into the main building when constructing an underground parking lot particularly for older apartment complexes.

Development of Basic Construction Cost Estimation Model for Expansion of Underground Parking Lot Remodeling in Apartment Housing (공동주택 지하주차장 확대 리모델링 개략 공사비 산정 모델 개발)

  • Jeong, Eunbeen;Koo, Choongwan;Kim, Taewan;Lee, Chansik
    • Korean Journal of Construction Engineering and Management
    • /
    • v.22 no.2
    • /
    • pp.42-52
    • /
    • 2021
  • The cost of remodeling parking lots of apartment houses accounts for about 20 percent of the total cost of remodeling. This means that when the remodeling cost of the underground parking lot is known, it becomes possible to estimate the total construction cost. The standard of estimation referenced when calculating the construction cost is difficult to apply to calculating the remodeling cost. Thus, a construction cost estimation model that reflects the characteristics of remodeling construction is necessary. This study developed a basic construction cost estimation model for expansion remodeling of underground parking lots of apartment houses that calculates the approximate cost of construction by reflecting the characteristics and design elements of remodeling. Based on literature review and consultation with experts, 37 activities of underground parking lot remodeling construction were derived. In order to enable calculation of approximate construction cost before the remodeling design drawing is finalized, the quantity calculation formula and unit price for each activity were presented. Based on expert advice, 13 factors that affect the increase in construction cost and weights of each factor were determined. As a result of applying three cases of remodeling complexes to the basic cost estimation model, the accuracy was confirmed to be 93 percent on average.

YOLOv4 Grid Cell Shift Algorithm for Detecting the Vehicle at Parking Lot (노상 주차 차량 탐지를 위한 YOLOv4 그리드 셀 조정 알고리즘)

  • Kim, Jinho
    • Journal of Korea Society of Digital Industry and Information Management
    • /
    • v.18 no.4
    • /
    • pp.31-40
    • /
    • 2022
  • YOLOv4 can be used for detecting parking vehicles in order to check a vehicle in out-door parking space. YOLOv4 has 9 anchor boxes in each of 13x13 grid cells for detecting a bounding box of object. Because anchor boxes are allocated based on each cell, there can be existed small observational error for detecting real objects due to the distance between neighboring cells. In this paper, we proposed YOLOv4 grid cell shift algorithm for improving the out-door parking vehicle detection accuracy. In order to get more chance for trying to object detection by reducing the errors between anchor boxes and real objects, grid cells over image can be shifted to vertical, horizontal or diagonal directions after YOLOv4 basic detection process. The experimental results show that a combined algorithm of a custom trained YOLOv4 and a cell shift algorithm has 96.6% detection accuracy compare to 94.6% of a custom trained YOLOv4 only for out door parking vehicle images.

Runoff Characteristics of Heavy Metals from a Parking Lot by Rainfall (주차장 지역의 강우에 의한 Pb와 Zn의 유출 특성)

  • Im, Jong-Kwon;Son, Hyun-Seok;Kim, Sung-Keun;Zoh, Kyung-Duk
    • Journal of Korean Society on Water Environment
    • /
    • v.26 no.6
    • /
    • pp.926-933
    • /
    • 2010
  • Runoff from a parking lot can be highly contaminated nonpoint source due to the impermeability of rainwater. This study presented runoff characteristics of heavy metals especially Zn and Pb from a parking lot during total 17 rain events. Monitoring results showed the first flush phenomenon within 30 min was observed in all rain events, but the event mean concentration (EMC) did not clearly show the characteristics of runoff. The ranges of Pb and Zn was $4{\sim}201{\mu}g/L$ and $131{\sim}672{\mu}g/L$, respectively, and the runoff mass of Zn and Pb was highly to related with the flow rate, and runoff coefficient of rain. The runoff mass of Zn was greater than that of Pb in all events. The runoff mass of Pb was highly correlated with the amount of TSS, and TSS and DOC were was related with the mass of Zn. This result implies that Pb and Zn are mainly existed in the particulate form. The results can be used to as meaningful data in the management of nonpoint source, and in the management in the runoff catchment in the parking lot.

Study on the Changes in Evapotranspiration according to the Decentralized Rainwater Management (분산식 빗물관리시설 적용에 따른 증발산 변화 연구)

  • Han, Young-Hae;Lee, Tae-Goo
    • KIEAE Journal
    • /
    • v.12 no.5
    • /
    • pp.3-10
    • /
    • 2012
  • In this study, the influence of decentralized rainwater management over the changes in evapotranspiration was analyzed. The analysis method was obtained by establishing the decentralized rainwater management plan according to different scenarios, and subsequently examined evapotranspiration in the plan. Scenario 1 refers to the analysis of the existing situation, in which was 100% of a parking lot is asphalt pavement. In Scenario 2, the pavement of the parking surface in the parking lot is replaced with lawn blocks. In Scenario 3, some asphalt pavement was removed to establish a flower-bed type infiltration system to allow rainwater to permeate. In Scenario 4, infiltration and storage of rain water would be achieved by transforming the parking surface into lawn blocks, keeping the asphalt for the parking road while establishing a vegetation strip. The amount of evapotranspiration of the target site was analyzed with a water budget analysis program (CAT) using the 2001 meteorological data for each scenario According to the analysis values of S2 and S3, it was found that evapotranspiration is critically affected by the amount of area replaced with pervious area in the total target site. An energy equivalent to 680kWh is required for 1 ton of water to evaporate. Hence, it can be seen that the active inducement of evapotranspiration in urban area makes a positive contribution not only to heat island mitigation, but also to the small-scale water circulation process in a city.