• 제목/요약/키워드: Pantograph-catenary interaction

검색결과 25건 처리시간 0.036초

Pantograph-catenary Dynamic Interaction for a Overhead Line Supported by Noise Barrier

  • Belloli, Marco;Collina, Andrea;Pizzigoni, Bruno
    • International Journal of Railway
    • /
    • 제5권2호
    • /
    • pp.55-64
    • /
    • 2012
  • Subject of the paper is a particular configuration of overhead line, in which noise barrier structure is used as supports of the catenary instead of standard poles. This configuration is foreseen in case the noise barrier position is in conflict with the poles location. If the catenary is supported by the noise barrier, the motion that the latter undergo due to wave pressure associated to train transit is transmitted to the overhead line, so that potentially it influences the interaction between the catenary itself and the pantograph of the passing train. The paper focuses on the influence of such peculiar configuration on the quality of the current collection of high speed pantograph, for single and double current collection. The study has been carried out first with an experimental investigation on the pressure distribution on noise barrier, both in wind tunnel and with in-field tests. Subsequently a numerical analysis of the dynamics of the barrier subjected to the wave pressure due to train transit has been carried out, and the output of such analysis has been used as input data for the simulation of the pantograph-dynamic interaction at different speeds and with front or rear pantograph in operation. Consideration of structural modifications was then highlighted, in order to reduce the influence on the contact loss percentage.

블럭펄스함수를 이용한 판토그래프와 가선시스템사이의 동특성 해석 (The Dynamic Characteristics Analysis Between Pantograph and Catenary System Using Block Pulse Function)

  • 신숭권;송용수;엄주환;엄기영
    • 대한전기학회:학술대회논문집
    • /
    • 대한전기학회 2004년도 학술대회 논문집 정보 및 제어부문
    • /
    • pp.748-750
    • /
    • 2004
  • The pantograph should supply the electrification equipments of a train with the current from the overhead catenary system over a broad range of speeds. For a high-speed electrical train, the dynamic interaction between the pantograph and the overhead catenary system causes the variation of the contact force. As the operational speed increases, the variation of the contact force increases. The contact force variation can cause contact losses, arcing and sparking. If the spark happens between the pantograph and the overhead catenary system, the EMI(electro magnetic interface) and noises may occur. After all, the quality of current collection is deteriorated. This paper deals with the dynamic characteristics analysis between pantograph and catenary system using block pulse function.

  • PDF

전차선로 동적특성에 따른 설치상태 분석 (Analysis on Installation Condition According to Dynamic Characteristics for Overhead Catenary System)

  • 박영;이기원
    • 전기학회논문지
    • /
    • 제65권9호
    • /
    • pp.1605-1609
    • /
    • 2016
  • The measurement of current collection performance between pantograph and contact wire of overhead catenary system is intended to prove the safety of operation and the quality of the current collection system. The results of interaction performance of current collection system are required for approving with commercial operation on railway lines. The methods of interaction performance of current collection system are defined on interactional standards such as IEC 62486 and EN 50317. In this paper, the interaction performance is evaluated by the percentage of arcing on Honam high-speed line and the results are used for adjustment of the overhead catenary line structure. The experimental results in Honam high-speed line confirm that the duration of an arc lasting longer 25 ms between pantograph and contact wire was depended on the conditions of overhead contact line after installation.

터널구간 팬터그래프와 전차선간 동적성능 검측장치 구현 (Implement of Dynamic Performance Measurement System Between Pantograph and Contact wire in Tunnel)

  • 박영;박철민;이기원;권삼영
    • 전기학회논문지
    • /
    • 제61권11호
    • /
    • pp.1732-1736
    • /
    • 2012
  • To increase speed up of train, in the field of catenary system, it is necessary to develop of new monitoring methods for dynamic interaction between pantograph and contact wire. Also, there is a need to develop technologies that constantly measure are from various railway structure such as uplift of contact wire, vibration of catenary, dynamic strain of contact line in tunnel. In this paper condition monitoring systems for dynamic performance of catenary systems in tunnel were proposed. An advanced method and results of field tests using high speed camera for monitoring of vertical upward movement of the grooved contact wire due to the force produced from the pantograph were presented. The proposed uplift measurement system of contact wire is expected to enhance precision of current collection quality performance assessment methods at high-speed lines.

Active Control of a High-Speed Pantograph using LQ-Servo Controller

  • Shin, Seung-Kwon;Song, Young-Soo;Eum, Ki-Young;Koo, Dong-Hoe
    • 제어로봇시스템학회:학술대회논문집
    • /
    • 제어로봇시스템학회 2004년도 ICCAS
    • /
    • pp.1173-1177
    • /
    • 2004
  • The high investment is necessary for the new high speed lines. So the KRRI was interested in the possibility of upgrading the existing line in order to speed up the train in the conventional lines. The tilting train system has been developed because the reconstruction of railway for the cant compensation costs very high. The purpose of the tilting system is to compensate the centrifugal acceleration in order to reduce the lateral acceleration of the passenger at high speed on the curves.The pantograph of the tilting train is indispensable in order to supply the electrification equipments with power in safe. The dynamic interaction between the pantograph and the overhead catenary system causes the variation of the contact force and the contact force variation can cause contact losses, arcing and sparking. If the spark happens between the pantograph and the overhead catenary system, the EMI(electro magnetic interface) and noises may occur. After all, the quality of current collection is deteriorated. This paper deals with the active control of pantograph and presents the LQ-servo controller to reduce the contact force variation.

  • PDF

경간형식과 고속열차 판토그라프 접촉력 특성의 상호관계에 대한 시험적 고찰 (An Experimental Study on the Correlation between Span Types and the Contact Force of the Pantograph for High-speed Train)

  • 김영국;목진용;이희성
    • 한국철도학회논문집
    • /
    • 제8권5호
    • /
    • pp.398-404
    • /
    • 2005
  • In this paper, we introduce the on-line test of the current collection characteristics for HSR 350x(Korea High Speed Train project) that have been performed in the Kyoung-bu high-speed line since 2002. Through the analysis of measured data during on-line test, the variation trend of contact force between pantograph and contact wire of catenary according to the span type, the track conditions and driving patterns is reviewed. In order to analyze the variation trend of contact force, we have checked the span type of catenary in KP 24 - 125 out of Kyoung-bu high speed line and obtained the statistical processing result per each span type. This study shows that the track conditions do not affect on the dynamic performance between pantograph and contact wire catenary, and the span type and the driving pattern are important factors in determining the good interaction between them.

최고운행속도 350km/h급 전차선로 최대경간길이 계산 기법 (Technique of Maximum Span Length Calculation for 350km/h High Speed Catenary System)

  • 창상훈;이기원;유향복
    • 한국철도학회:학술대회논문집
    • /
    • 한국철도학회 2011년도 춘계학술대회 논문집
    • /
    • pp.924-931
    • /
    • 2011
  • This paper deal with maximum span calculation technique for 350km/h high speed catenary system. Considers a geometric interaction, possible maximum span length is between two pole. Wind condition and the train current collector is moving even to being pantograph does not escape while operating. Uses like this justice and possible maximum span length is follow next condition. (i) Operating range of pantograph fan head, (ii) The wind velocity which assumes from system, (iii) Width in pantograph from operation height moving, (iv) Type of processing Catenary system, specially tensile strength of overhead contact wire and messenger wire etc. When accurately calculates the maximum permission span, the dropper between of overhead contact wire and messenger wire and must consider the correlation.

  • PDF

고속전철 집전시스템의 동역학 해석에 관한 연구(II. 집전시스템 통합 해석) (Dynamic Analysis of a Pantograph-Catenary System for High-Speed Train(II. Analysis of the Integrated Current Collection System))

  • 서종휘;목진용;정일호;박태원;김영국;김석원
    • 한국정밀공학회지
    • /
    • 제22권1호
    • /
    • pp.160-166
    • /
    • 2005
  • In this paper, the combined system equation of motion, which can analyze the dynamic interaction between pantograph and catenary system, is derived by adopting absolute nodal coordinates and rigid body coordinates. The analysis results are compared with real experiment data from test running of Korean high-speed train (HSR 350x). In addition, a computation method for the dynamic stress of contact wire is presented using the derived system equation of motion. This method might be good example and significant in that the structural and multibody dynamics model can be unified into one numerical system.

고속열차 팬터그래프 동특성 측정 및 동역학 해석을 통한 최적 전차선 장력 예측 (Prediction of Optimal Catenary Tension by Dynamic Characteristic Measurement and Dynamic Analysis of Pantograph in High-Speed Train)

  • 오혁근;유근준;박태원
    • 한국산학기술학회논문지
    • /
    • 제19권11호
    • /
    • pp.350-356
    • /
    • 2018
  • 팬터그래프(Pantograph)와 전차선간의 동적 상호작용인 접촉력(contact force)은 차량에 대한 안정적 전원공급 특성인 집전성능을 평가하는 중요한 지표이다. 본 연구에서는 동력분산형 고속열차 시험차량인 HEMU-430X(High-speed Electric Multiple Unit - 430km/h eXperiment) 차량의 팬터그래프 동적 접촉력 특성을 전차선 장력에 따라 분석하였고, 이를 팬터그래프-전차선 동적 상호작용 모델을 이용한 해석결과와 비교하였다. 시험결과와 해석결과를 비교한 결과, 주요 동적접촉력 특성인 평균접촉력 및 접촉력 표준편차가 비교적 잘 일치하는 것을 확인하였다. 또한 해석모델을 이용하여 전차선 장력과 접촉력과의 상관관계를 차량 운행속도에 따라 제시하였으며, 이를 이용하여 각 운영속도별 최적 전차선 장력을 제시하였고 이를 국제규격과 비교하였다. 그 결과 해석을 통해 도출된 결과와 국제 규격에서 권장하는 전차선 장력이 비교적 잘 일치하는 것을 알 수 있었다.

판토그라프 접촉력 측정을 위한 스트레인 게이지 내장형 센서 개발 (Development of Load Cell to Measure Contact Force of Pantograph)

  • 박찬경;백진성;김영국;김기환
    • 한국철도학회:학술대회논문집
    • /
    • 한국철도학회 2010년도 춘계학술대회 논문집
    • /
    • pp.947-953
    • /
    • 2010
  • The KTX-Sancheon has been commercially operating on the high-speed line since March. 2. In order to verify the performance of high-speed train and core equipments such as current collection system, sophisticated tests and evaluating procedures should have been considering. In this paper, the load cell with a built-in strain-gauge which developed to improve measuring method of contact force between the pantograph and catenary system is introduced. The static test results of the load cell shows that its design is very suitable and applicable for the dynamic test and on-line test. After the test and evaluation of load cell's dynamic calibration with pantograph, we will be applied to test interaction characteristics between the pantograph and catenary system on the high-speed line.

  • PDF