Browse > Article

Dynamic Analysis of a Pantograph-Catenary System for High-Speed Train(II. Analysis of the Integrated Current Collection System)  

Seo Jong-Hwi (아주대학교 기계공학과)
Mok Jin-Yong (한국철도기술연구원)
Jung Il-Ho (아주대학교 기계공학부)
Park Tae-Won (아주대학교 기계공학부)
Kim Young-Guk (한국철도기술연구원)
Kim Seok-Won (한국철도기술연구원)
Publication Information
Abstract
In this paper, the combined system equation of motion, which can analyze the dynamic interaction between pantograph and catenary system, is derived by adopting absolute nodal coordinates and rigid body coordinates. The analysis results are compared with real experiment data from test running of Korean high-speed train (HSR 350x). In addition, a computation method for the dynamic stress of contact wire is presented using the derived system equation of motion. This method might be good example and significant in that the structural and multibody dynamics model can be unified into one numerical system.
Keywords
High-Speed Train; Pantograph; Catenary System; Current Collection System; Absolute Nodal Coordinates; Dynamic Stress;
Citations & Related Records
Times Cited By KSCI : 3  (Citation Analysis)
연도 인용수 순위
1 Seo, J. H., Jung, I. H., Park, T. W., 'Computation of Dynamic Stress in Flexible Multibody Dynamics Using Absolute Nodal Coordinate Formulation,' KSPE, Vol. 21, No.5, pp. 114-121, 2004
2 Goetz, A., Introduction to Differential Geometry, Addision Wesley Publishing Company, 1970
3 Craig, R. R., Mechanics of Materials, John Wiley & Sons, pp. 258-265, 1996
4 Barlow, J., 'Optimal Stress Locations in Finite Element Models,' J. of Numerical Methods in Engineering, Vol.10, pp. 243-251, 1976   DOI   ScienceOn
5 Mok, J. Y., Park, C. S., 'Relation and Vibration Trend between the Behavior of the Pantograph vs. the Vehicle Running Speed in Korean High Speed Train,' Proceedings of KSNVE Annual Autumn Conference, pp. 170-176, 2003
6 KlTECH, 2nd_Step, 2nd_Year, Report (00-II-2-1-10), 'The Development of Pantograph,' 2001
7 Kim, J. S., Park, S. H., 'Dynamic Simulation of KTX Catenary System for Changing Design Parameters,' KSNVE, Vol. 11, No.2, pp. 346-353, 2001
8 Wu, T. X., Brennan, M. J., 'Dynamic Stiffness of a Railway Overhead Wire System and Its Effect on Pantograph-Catenary System Dynamics,' J. of Sound and Vibration, Vol. 219, No.3, pp. 483-502,1999   DOI   ScienceOn
9 Kim, J. W., Park, I. K., 'A Modeling and Contact Force Analysis of the Catenary-pantograph System for a High-speed Rail Vehicle,' KSNVE, Vol. 13, No. 6, pp. 474-483, 2003
10 Collina, A., Bruni, S., 'Numerical Simulation of Pantograph-Overhead Equipment Interaction,' J. of Vehicle System Dynamics, Vol. 38, No.4, pp. 261-291,2002   DOI   ScienceOn
11 Choi, Y. S., 'Current Collection of Catenary System with Time-Varying Stiffness,' KSR, Vol. 3, No.3, pp. 131-138, 2000
12 Hur, S., Kyung, D. H., Song, D. H., 'A Study on the Dynamic Simulation of High Speed Current Collection System,' KSR, Vol. 5, No.1, 2002
13 Han, H. S., 'Simulation-based Parametric Study of the Current Collection System of High Speed Trains,' KSR, Vol. 6, No.4, pp. 279-285, 2003
14 Seo, J. H., Jung, I. H., Park, T. W., 'Dynamic Analysis of very Flexible Cable Carrying a Moving Multibody System,' KSNVE. Vol. 14, No.2 pp. 150-156, 2004