• 제목/요약/키워드: Pantograph Performance

검색결과 89건 처리시간 0.026초

Influencing Factors on Dynamic Characteristics of Pantograph of Korean High Speed Train

  • Eom, Beom-Gyu;Mok, Jin-Yong;Lee, Hi-Sung
    • International Journal of Railway
    • /
    • 제2권4호
    • /
    • pp.187-192
    • /
    • 2009
  • Running test of the Korean High-Speed Train using remote controlled measuring system have been executed on the high speed track in order to evaluate and verify the performance of the train. In this paper, influencing factors on the contact force which represents dynamic characteristics between the pantograph and contact wire are analyzed, according to the track condition, span type and running condition. By the analytical study on the test data, we figured out that contact force and dynamic characteristics of the pantograph are mainly affected by running behavior of the train and the span distance which the train passes.

  • PDF

Adaptive Control of the Active Pantograph for a High-speed Train

  • Park, In-Ki;Park, Tong-Jin;Wang, Yeung-Yong;Han, Chang-Soo
    • 제어로봇시스템학회:학술대회논문집
    • /
    • 제어로봇시스템학회 2001년도 ICCAS
    • /
    • pp.174.3-174
    • /
    • 2001
  • Electric power collection is one of the most important factors for the high-speed trains' operation. For the stable current collection, the contact wire of a catenary and the panhead of a pantograph should maintain a constant contact each other. In this paper, the catenary was modeled as a spring with time-varying stiffness from the point of a pantograph moving along the catenary, and the pantograph was modeled as a 3-D.O.F. mass-spring-damper system. Using the adaptive control method, the desired control performance could be obtained with the modeling errors and the time varying parameters. Also the state estimator was used considering the difficulty of applying the sensors obtaining feedback signals. Simulations were accomplished in various ...

  • PDF

수서고속철도 전차선로의 설치조건의 따른 집전상태 분석 (Analysis of Current Collect Performance Depending on Installation Condition of Overhead Contact Line in Suseo High Speed Line)

  • 나경민;박영;이기원;조용현;권삼영;박철민
    • 전기학회논문지
    • /
    • 제66권4호
    • /
    • pp.727-732
    • /
    • 2017
  • This paper describes the dynamic characteristics depending on installation condition between a pantograph and an OCL (Overhead Contact Line) on a new high speed line in Korea. The current collection performance between the pantograph and the OCL was tested during train operation from Suseo to Jije stations. The current collection performance is evaluated based on the duration of an arc by using an arcing measurement system. The system consists of an optical sensor for measuring the duration of an arc and a camera for monitoring current collection performance. An arcing duration is defined as a percentage of arcing in international standards. This test aims to analyze the locations of repetitive arcing depending on installation conditions of OCLs on a new high speed line in order to use the result as reference data for correct construction and maintenance.

터널구간 가선계의 집전성능 (Current Collection Performance of Catenary System within Tunnel Section)

  • 손건호;이승일;최연선
    • 한국철도학회논문집
    • /
    • 제8권1호
    • /
    • pp.51-56
    • /
    • 2005
  • A dynamic simulation program of a catenary-pantograph system including tunnel section and transient section is developed in this study. The simulation program can accommodate for the pantograph of two panheads and three d.o.f model. Using the developed program, the dynamic characteristics with a SCHUNK'S WBL 85-PANTOGRAPH are analyzed at the conventional TAEBAEK line and its tunnel section when the catenary system is supported by a tunnel bracket. The simulation results show that the variation of contact force md uplift displacement is allowable in general section and the entrance and exit of a tunnel, but the uplift displacement and the separation ratio within tunnel section is difficult to allow.

선로변 전차선과 조가선의 전류를 이용한 집전성능 분석 기술 (Analysis of Current Collection Performance using Real-time Measurement of Current for Overhead Contact Line on the Track-side)

  • 박영;신승권;이기원;김재문;김원하
    • 전기학회논문지
    • /
    • 제62권4호
    • /
    • pp.573-576
    • /
    • 2013
  • In this paper, analysis method for current collection performance based on real-time current of catenary system is proposed. An innovative method based on track-side of railway system is used for measurement of currents for overhead contact line during the collection with pantograph. The evaluation of a qualitative ratio for current collection performance were conducted using proposed algorithm under various conditions such as laboratory and track-side. To check the validity of our approach, we compared between calculation results from current of contact wire and measurement results from arcing of pantograph using simulator in laboratory conditions. The results show that the behavior of current collection performance were analysis from currents of overhead contact line in AC electric railway system.

350km/h 전차선로 집전성능 시험 및 결과 분석 (Analysis of Current Collection Performance Testing and Result of 350[km/h] Catenary System)

  • 허용석;이인희
    • 전기학회논문지
    • /
    • 제65권2호
    • /
    • pp.365-369
    • /
    • 2016
  • The 350[km/h] catenary system was successfully opened in Honam high speed line. This 350[km/h] catenary system is firstly constructed in South Korea. Therefore the current collection performance of this system should be tested and evaluated by the authority. This paper describes the testings by running of HEMU-430X train and the evaluation criteria and result analysis to determine whether the performance of the catenary is good or not as a verification of catenary-pantograph interface. In detail, the contact force by pantograph, arcs by loss of contact and uplift amount of the catenary support were measured and discussed as a category of the current collection performance.

전차선로 동적특성에 따른 설치상태 분석 (Analysis on Installation Condition According to Dynamic Characteristics for Overhead Catenary System)

  • 박영;이기원
    • 전기학회논문지
    • /
    • 제65권9호
    • /
    • pp.1605-1609
    • /
    • 2016
  • The measurement of current collection performance between pantograph and contact wire of overhead catenary system is intended to prove the safety of operation and the quality of the current collection system. The results of interaction performance of current collection system are required for approving with commercial operation on railway lines. The methods of interaction performance of current collection system are defined on interactional standards such as IEC 62486 and EN 50317. In this paper, the interaction performance is evaluated by the percentage of arcing on Honam high-speed line and the results are used for adjustment of the overhead catenary line structure. The experimental results in Honam high-speed line confirm that the duration of an arc lasting longer 25 ms between pantograph and contact wire was depended on the conditions of overhead contact line after installation.

속도 향상을 위한 고속전철 TGV-K 집전시스템의 성능에 관한 연구 (A Study on Performance of TGV-K Current Collection System for the Speed-up)

  • 허신;경진호;한형석;송달호
    • 한국철도학회:학술대회논문집
    • /
    • 한국철도학회 1998년도 창립기념 춘계학술대회 논문집
    • /
    • pp.533-539
    • /
    • 1998
  • Described in this paper are the dynamic model and the dynamic performance of catenary-pantograph system for TGV-K(maximum operating speed of 300km/hr). Dynamic simulations showed that the system satisfies the performance criteria such as contact loss ratio, contact force and lift-off of the contact wire. It is also shown by the simulations that the dynamic behavior and contact performance of the system at the operating speed of 350km/hr are found unacceptable. Design parameters of the catenary-pantograph system should be optimized for the speed-up of the TGV-K.

  • PDF

한국형 고속열차의 350km/h 본선 주행시험을 통해 본 고속열차용 팬터그래프의 이선 특성과 동적 특성 고찰 (Study on the current collection & vibration characteristics of the KHST's pantograph through trial running test up to 350km/h)

  • 목진용;박찬경;박춘수;김기환
    • 한국소음진동공학회:학술대회논문집
    • /
    • 한국소음진동공학회 2005년도 춘계학술대회논문집
    • /
    • pp.459-462
    • /
    • 2005
  • The KHST(Korean High Speed Train) which had been developed by through 'G7-R&D project' has succeeded trial running test up to 350km/h on the Kyoung-Bu High Speed Track in December 16th, 2004. In order to evaluate the function and characteristics of KHST, various experimental conditions have been considered and conducted. In this paper, measured current collection characteristics and dynamic behaviors of KHST's pantograph are analysed over 300 to 350km/h in running speed of KHST. A measuring system developed and installed on the KHST for measuring the performance and mechanical characteristics of the KHST's pantograph was used for this trial running test and eventually, we proofed that KHST has a remarkable and stable current collection characteristics as it had been designed.

  • PDF

경간형식과 고속열차 판토그라프 접촉력 특성의 상호관계에 대한 시험적 고찰 (An Experimental Study on the Correlation between Span Types and the Contact Force of the Pantograph for High-speed Train)

  • 김영국;목진용;이희성
    • 한국철도학회논문집
    • /
    • 제8권5호
    • /
    • pp.398-404
    • /
    • 2005
  • In this paper, we introduce the on-line test of the current collection characteristics for HSR 350x(Korea High Speed Train project) that have been performed in the Kyoung-bu high-speed line since 2002. Through the analysis of measured data during on-line test, the variation trend of contact force between pantograph and contact wire of catenary according to the span type, the track conditions and driving patterns is reviewed. In order to analyze the variation trend of contact force, we have checked the span type of catenary in KP 24 - 125 out of Kyoung-bu high speed line and obtained the statistical processing result per each span type. This study shows that the track conditions do not affect on the dynamic performance between pantograph and contact wire catenary, and the span type and the driving pattern are important factors in determining the good interaction between them.