• Title/Summary/Keyword: PBL(Performance Based Logistics)

Search Result 11, Processing Time 0.028 seconds

A study on the Performance Analysis of PBL for Air Weapon System (항공무기체계 운영의 PBL 성과분석에 관한 연구)

  • Park, Keun-Seog;Yoon, Yong-Hyun;Eom, Jung-Ho
    • Journal of the Korean Society for Aviation and Aeronautics
    • /
    • v.25 no.4
    • /
    • pp.52-60
    • /
    • 2017
  • This paper forces on the analysis of the overall outcome regarding Performance Based Logistics(PBL) application for Air Weapon System. We used data from domestically developed aircraft such as KT/A-1 and T-50 as well as data from foreign F-15K aircraft and F100 Engine to analyze the current ROKAF PBL application results. Furthermore, this paper thus suggests various techniques to maximize the outcome of user-based PBL performance such as clarifying the responsibility between customer and the company, developing standardized PBL performance index under TLCSM, PBL related maintenance capacity development, wartime PBL implementation process of domestic/foreign companies and many other schemes based on the analyzed data.

A study on the PBL Application Scheme for Optimal Maintenance of the KF-X Project (한국형전투기(KF-X)의 최적정비를 위한 PBL 적용방안에 관한 연구)

  • Park, Keun-Seog;Yoo, Yong-Hyun
    • Journal of the Korean Society for Aviation and Aeronautics
    • /
    • v.24 no.3
    • /
    • pp.10-18
    • /
    • 2016
  • This paper deals with the Performance Based Logistics(PBL) application scheme pertaining to optimal maintenance program for logistics of Korean Fighter Experimental(KF-X) Project. For enhancement of the performance based logistics system application to KF-X program the selection of appropriate standards fit to maximize cost-cutting, a set of performance metrics fit for the purpose of the contract, foreign technology dependence of core equipments and parts were considered. Thus, selecting appropriate standards fit for Korean logistics environment, domestic maintenance enterprise for stable rate of operation of KF-X, a systematic reliability task that is able to measure quantitative combat capability are suggested.

An Analysis on the Effect of PBL(Performance Based Logistics) Application for ROK Navy Landing Ship Fast(LSF-II) (해군 고속상륙정(LSF-II)에 대한 성과기반군수지원(PBL) 적용 효과 분석)

  • Chanjung Kim;Myoungjin Choi
    • Journal of Korean Society of Industrial and Systems Engineering
    • /
    • v.46 no.4
    • /
    • pp.331-338
    • /
    • 2023
  • ROK Navy Landing Ship Fast(LSF-II) is equipped with special equipment that is not compatible with other combat ships due to special missions. So there are almost no maintenance capabilities except for simple repair parts replacement and maintenance parts. The researcher determined that the way to solve these problems was to apply Performance Based Logistics (PBL), and reviewed the cases of PBL applications abroad and domestically. To confirm the current maintenance capability, we visited LSF-II operation unit to identify maintenance capabilities for each mounted equipment, and interviews with operators and maintenance practitioners confirmed the limitations of outsourcing maintenance and the need to apply PBL. In order to analyze the effect of PBL application, the measure of effectiveness and measure of performance were selected based on the opinions of LSF-II operation/maintenance practitioners and PBL experts and the practical experience of this researcher. A survey was conducted on operation/maintenance practitioners and professional personnel. Based on the survey results, the effect of applying PBL was analyzed using the AHP technique, and an efficient PBL application plan was proposed for LSF-II.

A Study on ROK Military PBL Using Simulation and Meta Model (시뮬레이션과 메타 모델을 이용한 한국군 성과기반군수 연구)

  • Won, Bong Yeon;Lee, Sang Jin
    • Journal of the Korea Society for Simulation
    • /
    • v.28 no.1
    • /
    • pp.81-91
    • /
    • 2019
  • The ROK military uses Performance Based Logistics(PBL) as one of the ways to utilize civilian resources and advanced techniques. However, the Korean PBL is mainly focused on purchasing and repairing parts, which is not contributing to the improvement of the availability of overall system. The objective of this study is to suggest the methodology to evaluate the PBL metrics using the simulation and meta model. A meta model is a regression model to analyze the effect of the PBL through simulating various scenarios with performance metrics. As a result, if the PBL is limited to the part level, the performance has little influence on the availability of overall system. In addition, analysis using the meta model shows that it cannot achieve the performance targets when the same metrics are applied to various items without considering the characteristics of the applied items. Therefore, in order to improve availability, PBL coverage should be extended to a system level that includes key components that have a large impact on availability. If multiple items are included in the PBL coverage, the metrics should be applied differently, taking into account the characteristics of each item.

A Study on the Improvement of Logistic Support by Performance Based Logistics (성과기반군수(PBL)를 활용한 군수지원 발전방안 연구)

  • Choi, Seok-Cheol
    • Journal of the military operations research society of Korea
    • /
    • v.34 no.2
    • /
    • pp.43-61
    • /
    • 2008
  • Performance based logistics(PBL) is recently studied and applied for enhancing the combat readiness and reducing the life-cycle cost for weapon system in the United States. Therefore, in this paper, we review the issues of logistic support and suggest alternatives to effectively manage the logistic support for weapon system by using performance based logistics, especially during operation and support phase of weapon systems.

A Study on the Application of Performance Based Logistics (성과기반군수(PBL) 적용방안 연구)

  • Choi, Seok-Cheol
    • Journal of the Korea Institute of Military Science and Technology
    • /
    • v.11 no.2
    • /
    • pp.88-94
    • /
    • 2008
  • It is very important for weapon systems to manage the logistic support for the better combat readiness. Therefore, in this paper we review the issues of logistic support and suggest alternatives to effectively manage the logistic support for weapon systems by using performance based logistics, especially during operations and support phase.

Research on RAM-C-based Cost Estimation Methods for the Supply of Military Depot Maintenance PBL Project (군직 창정비 수리부속 보급 PBL 사업을 위한 RAM-C 기반 비용 예측 방안 연구)

  • Junho Park;Chie Hoon Song
    • Journal of the Korean Society of Industry Convergence
    • /
    • v.26 no.5
    • /
    • pp.855-866
    • /
    • 2023
  • With the rapid advancement and sophistication of defense weapon systems, the government, military, and the defense industry have conducted various innovative attempts to improve the efficiency of post-logistics support(PLS). The Ministry of Defense has mandated RAM-C(Reliability, Availability, and Maintainability-Cost) analysis as a requirement according to revised Total Life Cycle System Management Code of Practice in May 2022. Especially, for the project budget forecast of new PBL(Performance Based Logistics) business contacts, RAM-C is recognized as an obligatory factor. However, relevant entities have not officially provided guidelines or manuals for RAM-C analysis, and each defense contractor conducts RAM-C analysis with different standards and methods to win PBL-related business contract. Hence, this study aims to contribute to the generalization of the analysis procedure by presenting a cost analysis case based on RAM-C for the supply of military depot maintenance PBL project. This study presents formulas and procedures to determine requirements of military depot maintenance PBL project for repair parts supply. Moreover, a sensitivity analysis was conducted to find the optimal cost/utilization ratio. During the process, a correlation was found between supply delay and total cost of ownership as well as between cost variability and utilization rate. The analysis results are expected to provide an important basis for the conceptualization of the cost analysis for the supply of military depot maintenance PBL project and are capable of proposing the optimal utilization rate in relation to cost.

On Modeling the PBL Process and the ILS Development from a Life Cycle View with Resultant Enhanced Interrelationship (PBL 수행절차와 ILS 개발절차의 수명주기별 프로세스 모델링 및 상호 연계성의 개선에 관한 연구)

  • Ju, Hyun-Jun;Lee, Jae-Chon
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.13 no.10
    • /
    • pp.4418-4425
    • /
    • 2012
  • The demand on applying the performance-based logistics (PBL) in the operational phase of the weapon systems development is increasing these days. Therefore, the enhancement of the PBL concept and process needs to be done. This is the objective of the paper. As a method of approach, a modeling method is adopted to cover the whole life cycle of the weapon systems development from the concept development to the operation. The modeling results for the PBL process yield an useful suggestion for improvement. Also, by analyzing the interrelationship model between the PBL process and the integrated logistics support (ILS) procedure, it is possible to take advantage of the PBL concept in the ILS elements development, which is usually carried out from the beginning of the development phase, a lot earlier than the operational phase. Note that the PBL concept has been restrictively applied in only the supply support among many ILS elements up until now. However, the results obtained in the paper can make it also possible to consider the availability, reliability, logistics support, cost and so on from the early phase of the weapon systems development.

A Study on the Application of PIDO Technique for the Maintenance Policy Optimization Considering the Performance-Based Logistics Support System (성과기반 군수지원체계의 정비정책 최적화를 위한 PIDO 기법 적용에 관한 연구)

  • Ju, Hyun-Jun;Lee, Jae-Chon
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.15 no.2
    • /
    • pp.632-637
    • /
    • 2014
  • In this paper the concept of the performance-based logistics (PBL) support for weapon systems is discussed and an enhancement is studied such that prior to the Operational phase, the development of the PBL can begin from the Engineering & Manufacturing Development (EMD) phase together with multiple performance indices considered. The genetic algorithm should be considered for the complex system to solve the maintenance policy optimization. In particular, the requirement of repair level analysis model is developed based on reflecting the PBL concept. To decide the maintenance policy prior to Operational phase in accordance with customer requirements, the PIDO(Process Integration and Design Optimization) technique useful in choosing the performance indices and changing the constraints was used. The genetic algorithm of PIDO tool, like PIAnO and ModelCenter, was verified that it could be applied to optimize the maintenance policy.

Research on Naval Weapons Systems MRO by analyzing Aerospace MRO Industry (항공 MRO 산업 사례를 통한 해군 무기체계 정비방안 고찰)

  • Oh, Kyungwon;Choi, Heonnsik;Kong, Changduk;Park, Hyunbum
    • Journal of Aerospace System Engineering
    • /
    • v.8 no.2
    • /
    • pp.14-20
    • /
    • 2014
  • MRO is important concept in military logistics. It is required to reforming military budget and manpower because of decreasing troops and other factors. For this reason, military logistics needs to change and improvement. MRO is necessary concept in this situation. In that case, How improve Naval Weapons Systems MRO for this changing time? For example, ROK air force applies Aerospace MRO industries in their Weapons Systems. But, ROK navy's MRO concept is uncertain and current MRO is divided just three step, Organizational Maintenance, Field Maintenance, Depot Maintenance. So it is time to develop systematic MRO concept for improving Naval Weapons Systems and Logistics. In this research, This0 study is about expanded application of PBL and the need to make relationship between Private enterprise and Military.