Fig. 1. Spectrum of PBL Strategies
Fig. 2. Simulation Process of PBL Model
Fig. 3. Overall Architecture of Simulation Model
Fig. 4. Data Conversion Process
Fig. 5. Result of Simulation Tendency Analysis
Fig. 6. Engine Availability by Metric Decrease
Table 1. PBL Support Integration
Table 2. Item and Definition of Simulation Model Design
Table 3. Number of Occurrences by Type of Maintenance
Table 4. Classification of Maintenance type
Table 5. Probability Distribution of Maintenance Period
Table 6. Probability Distribution of Other Time Required
Table 7. Number of Spare
Table 8. Maintenance Period for Meta Model Design
Table 9. Simulation Result of Maintenance Period Scenario
Table 10. Result of Regression Analysis I
Table 11. Result of Regression Analysis II
Table 12. Result of Regression Analysis III
References
- 국방일보, "무기체계 성능 발휘하게 군수혁신 지속" (Downloaded March 16, 2018)
- 국방일보, "예산 70억 덜들고 장비 안정적 가동 'PBL이 답이다'"(Downloaded December 05, 2018)
- Baek, J. O.(2018) Contents and point of the Korea national defense budget in 2018, Seoul: Korea Institute for Defense Analyses.
- Choi, S. C.(2008) "A Study on the Improvement of Logistic Support by Performance Based Logistics," Journal of the Military Operations Research Society of Korea, 34(2), 43-61.
- Cioppa, Thomas M.(2002) Efficient Nearly Orthogonal and Space-Filling Experimental Designs for High-Dimensional Complex Models, Monterey: Naval Postgraduate School.
- Jin, A. Y., H. S. Lee(2016) "Cost analysis for applying PBL to equipment maintenance," The Korean Journal of Defense Analysis, 113, 226-245
- Kang, K. B., Kenneth Doerr, Michael Boudreau and Uday Apte(2005) A decision support model for valuing proposed improvements in component reliability, Monterey: Naval Postgraduate School.
- Kang, J. Y., H. C. Lee, I. S. Um(2006) "A Study for Design Optimization of an Automated Distribution Center using the Simulation and Metamodel," Journal of the Korea Society for Simulation, 15(3), 103-114.
- Kim, K. R., H. Y. Yong, K. S. Kwon(2012) "Optimization for Concurrent Spare Part with Simulation and Multiple Regression," Journal of the Korea Society for Simulation, 21(3), 79-87. https://doi.org/10.9709/JKSS.2012.21.3.079
- Kim, S. K., S. J. Lee(2017) "A Case Study on the Cost Effectiveness Analysis of Depot Maintenance Using Simulation Model and Experimental Design", Journal of the Korea Society for Simulation, 26(3), 23-34. https://doi.org/10.9709/JKSS.2017.26.3.023
- Kim, T. K., K. B. Wi, K. S. Lee(2017) A study on the development of PBL contract, Seoul: Korea Institution of National Defense Development.
- Lee, S. J., B. K. Jung(2009) "A Study on the Influence in Applying the performance Based Logistics with a Case of the KUH Engine," Journal of the Korea Association of Defence Industry Studies, 16(2), 50-76.
- Lee, J. S., S. K. Son(2016) "Strategic management plan of PBL contract," Korea Defense Industry Association Defense & Technology, 446, 44-61.
- U.S. Defense Acquisition University(2005) Performance Based Logistics: A Program Manager's Product Support Guide.
- Woo, J. U., H. K. Kang, N. Y. Kwon and A. Y. Jin(2014) Effective promotion method of PBL, Seoul: Korea Institute for Defense Analyses.