Browse > Article
http://dx.doi.org/10.5762/KAIS.2014.15.2.632

A Study on the Application of PIDO Technique for the Maintenance Policy Optimization Considering the Performance-Based Logistics Support System  

Ju, Hyun-Jun (Aircraft Systems PMO, ADD)
Lee, Jae-Chon (Dept. of Systems Engineering, Ajou University)
Publication Information
Journal of the Korea Academia-Industrial cooperation Society / v.15, no.2, 2014 , pp. 632-637 More about this Journal
Abstract
In this paper the concept of the performance-based logistics (PBL) support for weapon systems is discussed and an enhancement is studied such that prior to the Operational phase, the development of the PBL can begin from the Engineering & Manufacturing Development (EMD) phase together with multiple performance indices considered. The genetic algorithm should be considered for the complex system to solve the maintenance policy optimization. In particular, the requirement of repair level analysis model is developed based on reflecting the PBL concept. To decide the maintenance policy prior to Operational phase in accordance with customer requirements, the PIDO(Process Integration and Design Optimization) technique useful in choosing the performance indices and changing the constraints was used. The genetic algorithm of PIDO tool, like PIAnO and ModelCenter, was verified that it could be applied to optimize the maintenance policy.
Keywords
Maintenance Policy; PBL; PIDO;
Citations & Related Records
Times Cited By KSCI : 1  (Citation Analysis)
연도 인용수 순위
1 The Office of Secretary of Defense, "Designing and Assessing Supportability in DOD Weapon Systems: A Guide to Increased Reliability and Reduced Logistics Footprint", October, 2003.
2 Defense Acquisition University, "Performance Based Logistics: A Program Manager's Product Support Guide", March, 2005.
3 S. J. Park, "ORORA(Level of Repair Analysis S/W)," ADDT-2007-0257, 2007.
4 A. Kaplan, "Mathematics of COMPASS", AMSAA, February, 2011.
5 U. D. Kumar, D. Nowicki, J. Ramirez, D. Verma, "A Goal Programming Model for Optimizing Reliability, Maintainability and Supportability under Performance Based Logistics", Intl Journal of Reliability, Quality and Safety Engineering, Vol.14, No. 3 pp. 251-261, 2007. DOI: http://dx.doi.org/10.1142/S0218539307002623   DOI   ScienceOn
6 O. Wijk, T. Olinger, R. Hell, "Simulation as support for decision making in negotiations", 14th annual System Engineering Conference in San Diego, 2011.
7 P. Andersson, R. Hell, O. Tengo, O. Wijk, "Better PBL Contracts -An Analytical Approach", Systecon AB, 2013.
8 T. Jin, Z. Tian, C. Novoa, "Managing Performance Based Logistics by Balancing Reliability and Spare Parts Stocking", IEEE, 2011. DOI: http://dx.doi.org/10.1109/ICQR2MSE.2011.5976648   DOI
9 J. Cothran, K. Vitasek, "Achieving Success with Performance Based Logistics", DAU and Uni. Of Tennessee, November, 2005.
10 J. Cothran, "PBL BCA", DAU, 2004.
11 H. J. Ju, J. C. Lee, "On Modeling the PBL Process and the ILS Development from a Life Cycle View with Resultant Enhanced Interrelationship", Journal of the KAIS, Vol.13, No. 10 pp. 4418-4425, 2012. DOI: http://dx.doi.org/10.5762/KAIS.2012.13.10.4418   과학기술학회마을   DOI   ScienceOn
12 DAPA, "Defense Acquisition Program Management Regulation", Instruction 237, 2013.