• 제목/요약/키워드: Overseas Power Plant Construction

검색결과 27건 처리시간 0.023초

해외 원자력발전소 방호도장 유지관리 현황 고찰 (Study on Protective Coating Management Status in Overseas Nuclear Power Plant)

  • 임상준
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2018년도 춘계 학술논문 발표대회
    • /
    • pp.318-319
    • /
    • 2018
  • Protective coatings at nuclear power plants should be designed to withstand exposure to ambient conditions during normal operation or design-basis accidents. However, there was a change in the perception of the protective coating to the revision of the Regulatory Guidelines by the NRC in July 2000. In other words, maintenance guidelines have been strengthened in order to minimize the clogging of the cooling water system due to the substances in the containment building. Therefore, KHNP, the contractor and operator of the nuclear power plant, plans to develop the coating system for nuclear power plants in accordance with the regulation, and plans to develop its own coating expert.

  • PDF

해외건설 프로젝트의 성공적 수행을 위한 위험요소 및 대처방안에 대한 연구 - 해외건설 사례분석을 포함하여 - (A Study on Risk Analysis and Relevant Measures for the Successful Performance in Overseas Construction Projects - Including Case Analysis on A Overseas Construction Project -)

  • 김상만
    • 무역상무연구
    • /
    • 제50권
    • /
    • pp.215-250
    • /
    • 2011
  • Korean won overseas construction projects worth 71.6 billion US Dollars in 2010, which exceeded that of 2009 by 45.6%. An overseas construction project is a transaction of large scale, long term project, many parties participating, deferred payment, and of high-technology. It contributes to foreign currency earning, and also leads the nation's export restructuring work towards high value-added one. There are various kinds of risks towards the relevant parties respectively, which are key elements in successfully performing the overseas construction project. There are completion risk, financing risk, operating risk, revenue risk etc, in an employer's place. A contractor may be confronted with payment risk, issuance risk of performance bond, financing risk, performance risk of sub-contractors, and exchange rate risk. In lenders place there are repayment risk, completion risk, and political risk in the host country. In order to mitigate risks, the parties shall take relevant measures or require relevant securities. A contractor needs to evaluate the credibility of an employer in respect of payment risk, and can also request export insurance cover by the Korea Trade Insurance Corporation(the former 'Korea Export Insurance Corporation"). An employer can require a contractor to provide performance bond in respect of completion risk, and employ a well-known first class bank as a mandated arranger to arrange financing with regard to completion risk. Lenders needs to evaluate the credibility of an employer and accomplish feasibility study of the project. Lenders can request insurance cover from export credit agency. Once the parties assess the respective risks and obtain relevant securities, the project will be successfully completed. The success of the project will be sure to bring the parties involved enormous profits and another opportunity to participate in overseas construction project afterwards.

  • PDF

해외 플랜트 건설 분야의 현황 분석을 통한 경쟁력 강화전략 도출 (Strengthening Plant Market Competitiveness in the Construction Firms;A Corporate Strategy)

  • 이태식;이꽃님;구자경
    • 한국건설관리학회:학술대회논문집
    • /
    • 한국건설관리학회 2006년도 정기학술발표대회 논문집
    • /
    • pp.317-321
    • /
    • 2006
  • 플랜트 산업은 기자재, 노동력, 기술이 함께 투입되는 종합산업으로 부가가치가 매우 높고, 선진국들의 수출전략산업으로 해외시장에서 치열한 수주경쟁이 벌어지고 있다. 우리나라도 플랜트 시장의 수출 증대는 매우 중요한 과제로 여겨지고 있다. 그러나 현재까지의 추세로 보아 우리나라의 플랜트 산업은 석유가스와 석유화학부문에 너무 치우쳐 있고 업체들간의 수주 불균형으로 인한 인력부족, 그리고 여러 기술적${\cdot}$비용적인 문제가 발생하고 있다. 이를 해결하기 위해서는 정확한 시장환경 분석을 통한 경영전략의 수립이 요구된다. 국내 건설업체들이 향후 지속적인 수익을 확보하기 위해서는 최근의 시장동향을 고려할 때 시장발전이 제한적인 국내시장 대신 해외시장에 진출하기 위한 전략의 확보가 요구된다. 조사 결과 해외 플랜트 시장의 발전 가능성에 비해 국내 업체들이 플랜트 시장에 진출하기에 시공분야에서는 오랜 경험을 바탕으로 충분한 경험을 갖고 있으나 고부가가치 분야인 엔지니어링, 사업관리 분야 등에 대해서는 매우 취약한 것으로 조사되었으며, 이로 인해 해외 업체들과의 수주 경쟁에서 뒤처지는 것으로 나타났다. 이에 본 연구는 국내 건설업체들이 플랜트 건설 분야에 경쟁력 강화를 위한 현 문제점을 지적하고 그에 대한 개선점을 제안하였다.

  • PDF

원전건설 발주 및 계약체계에 대한 고찰 (A Study of the Construction Contracts and Delivery System for Nuclear Power Plant)

  • 서용덕;원서경
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2012년도 추계 학술논문 발표대회
    • /
    • pp.233-235
    • /
    • 2012
  • Continually having growed up overseas construction market for new Nuclear Power Plant(NPP), the exports of Korean Reactor emerges as the key task of National Nuclear Business. The objective of this study is to strengthen the competitiveness of Korean Reactor through the improvement of Construction Project Contract & Delivery System for NPP. This study suggests the method for increasing Korean Reactor's competitiveness of exports by analyzing the business environment of foreign market and comparing Contract & Delivery System between domestic and foreign.

  • PDF

신재생 에너지를 이용한 해외 그린 암모니아 프로젝트에 대한 경제성 비교 (Economic Feasibility Comparison of Overseas Green Ammonia Project Using Renewable Energy)

  • 신현창;목학수
    • 한국산업융합학회 논문집
    • /
    • 제27권3호
    • /
    • pp.547-553
    • /
    • 2024
  • Hydrogen is considered a key energy source to achieve carbon neutrality through the global goal of 'Net Zero'. Due to limitations in domestic green hydrogen production, Korean companies are interested in importing green hydrogen produced overseas. Because Australia and the Middle East possess high-quality renewable energy resources, they are attracting attention as suitable regions for producing green hydrogen using renewable energy. The cost of constructing and operating a green ammonia plant varies depending on the region. In this study, an economic feasibility comparison of green ammonia plant construction in Australia and the Middle East is conducted. Through this, it is expected to contribute to the economic analysis and feasibility analysis of the project to import hydrogen in the form of green ammonia into Korea.

THE INTRODUCTION METHOD OF TECHNOLOGY MANAGEMENT IN THE OIL AND GAS PLANT INDUSTRY

  • Doo Hee Lee;Young Woong Song;Hyoung Chul Lim;Yoon Ki Choi
    • 국제학술발표논문집
    • /
    • The 2th International Conference on Construction Engineering and Project Management
    • /
    • pp.249-258
    • /
    • 2007
  • Recently orders of projects in the field of oil and gas plants have increased due to rising oil prices and consumption. The markets of oil and gas plants are expanding into the Middle East area and all over the world. Because the oil and gas markets have a lot of overseas construction operations, competition among advanced companies is more important. However, companies in the period of growth have not had enough competitive powers of license in the design phase. Therefore, they are faced with difficulty of adopting the technology which is maximizing the effect of investments, and scheduling of a long-range plan. In order to achieve adequate technology management and competitive power, this study considers a long-range plan through an analysis of an appropriate introduction and the strategic planning process of technology management.

  • PDF

BIM을 활용한 원전 해체 물량산출 방안 (Plan of BIM-based Quantity Take-off for Nuclear Power Plant Decommissioning)

  • 정인수;원지선
    • 한국산학기술학회논문지
    • /
    • 제16권9호
    • /
    • pp.6297-6304
    • /
    • 2015
  • 우리나라 최초의 원자력발전소인 고리 원전 1호기의 폐쇄가 결정됨에 따라 원전 해체가 화두가 되고 있다. 원전 해체는 우리나라에서 한번도 경험해 보지 못한 일로 해체 과정도 어렵고 시간도 많이 소요된다. 그 일부분인 해체물량 또한 파악이 어렵다. 본 연구에서는 최근 건설산업에 많이 활용되고 있는 BIM 기술을 원전 해체 물량산출에 활용할 수 있는 방안을 제시하였다. 그 결과, 원전 해체 공법선정 및 공정 확립, BIM 모델링 환경 준비, 작업분류체계 구축, 객체분류체계 구축, BIM 통합모델 작성, BIM 객체에 물량 속성 배분 등의 방안을 제시하였다. 제시한 방안은 영구정지 대상 원전이 집중적으로 발생하는 시기부터 유용하게 활용될 수 있다. 이에 기반한 기술확보를 통해 나아가 해외 원전 해체 사업 수주에도 유리하게 작용할 것으로 기대된다.

산업설비 EPC 업무 분석을 통한 정보 분류 내역에 관한 연구 (A Study on Information Breakdown through the Analysis of Industrial Engineering EPC Business Process)

  • 조항민;송영웅;최윤기
    • 한국건설관리학회:학술대회논문집
    • /
    • 한국건설관리학회 2006년도 정기학술발표대회 논문집
    • /
    • pp.167-172
    • /
    • 2006
  • 최근 해외 건설시장 플랜트 분야의 수주 증대에 따라 오일 ${\cdot}$ 가스 분야의 프로젝트가 증가하고 있다. 따라서 국내 건설 산업 업체들의 해외 플랜트 사업의 경쟁력을 확보하기 위해서는 기술 경쟁력 확보, 생산성 향상, 전략적 정영 추진 등 적극적인 대처 방안 수립이 요구되고 있다. 그 중에서도 해외 플랜트 사업의 오일 ${\cdot}$ 가스 분야는 산업 경쟁력 향상을 위하여 프로젝트 수행과 관련한 EPC(Engineering Procurement Construction : 이하 EPC) 유통 정보의 활용이 더욱 요구되지만, EPC 단계별 다양한 업무에서 발생하는 유동정보 콘텐츠를 효율적으로 관리하기 위한 콘텐츠 분류체계가 제시되고 있지 못하고 있다. 그로 인하여 설계도면의 변경, 중복업무의 발생, 업무주체간의 정보 누락 등의 문제점이 발생하고, 그러한 문제점으로 인하여 생산성 저하 현상이 나타나고 있다. 따라서 본 연구는 오일 ${\cdot}$ 가스 분야의 콘텐츠 관리체계의 실무적 활용의 증대와 건설산업 정보관리의 효용성을 향상시키기 위하여 콘텐츠 관리 체계를 확립하기 위한 BPM(Business Process Management) 기반의 콘텐츠 분류 체계를 제시하고자 한다. Business Process별 요구되는 지식의 유형을 체계화하고, 콘텐츠 정보를 분석하여 산업설비 유동정보의 체계화를 정립하고자 한다.

  • PDF

PMBOK Guide 지식영역 적용 사례 -원전종합설계를 중심으로- (A Case on Application of the PMBOK(Project Management Body of Knowledge) Guide in Nuclear Power Plant Architect Engineering)

  • 임재민;김성수
    • 건설관리
    • /
    • 제13권6호
    • /
    • pp.41-45
    • /
    • 2012
  • Nowadays the Project Management is increasingly adapted into almost all the fields in business management processes among leading companies both in Korea and overseas. However its actual practices are rare to be found. Among the Project Life Cycle, this report covers the real cases of the PMBOK knowledge areas in NPP Architect Engineering. The areas of the Construction, Start-up and Operation will be exception of the cases. By way of analyzing the KEPCO ENC's Processes/Procedures/Systems and the ones in PMBOK Guide, this report will show the contents in the PMBOK Guide is rather practical than theoretical. Meanwhile, implications whether the conclusions of this report might be applied to other industries such as general construction, non-nuclear plants, etc. should be left behind to follow-up studies.

APR+ 표준설계에 대한 경제성 분석 (A Economic Evaluation for APR+ Standard Design)

  • 하각현;이재호
    • 에너지공학
    • /
    • 제25권1호
    • /
    • pp.43-47
    • /
    • 2016
  • 한수원 중앙연구원은 2007년부터 정부과제의 하나로 전기출력이 1500MWe급인 GEN III+ 원전 APR+를 개발해 왔다. APR1400 보다 안전성이 진전된 노형을 개발하기 위해 국내외에서 건설되거나 설계중인 ALWR의 개선된 설계특성을 조사하였다. 국내외의 원전건설 사업에 적합한 APR+ 표준설계를 개발하기 위해 신개념설계특성과 후쿠시마 원전사고 경험을 설계에 반영하였다. APR+의 안전성향상 표준설계 단계(2013.1 ~ 2015.12)에서 한 번의 경제성평가를 수행하였다. 설계 안전성향상 기술개발 단계에의 경제성 평가 결과 APR+ N-th호기는 국내석 탄화력 1000MWe급 대비 39.2% 경쟁력 우위인 것으로 평가되었다. 또한 APR+원전은 해외 원전 선진국 ALWR에 비해 동등 이상 수준의 경쟁력을 확보하는 것으로 평가되었다.