PMBOK Guide 지식영역 적용 사례 -원전종합설계를 중심으로-

A Case on Application of the PMBOK(Project Management Body of Knowledge) Guide in Nuclear Power Plant Architect Engineering

  • 임재민 (한국전력기술 사업관리기술그룹) ;
  • 김성수 (한수원 중앙연구원 플랜트건설기술연구소)
  • 발행 : 2012.12.10

초록

Nowadays the Project Management is increasingly adapted into almost all the fields in business management processes among leading companies both in Korea and overseas. However its actual practices are rare to be found. Among the Project Life Cycle, this report covers the real cases of the PMBOK knowledge areas in NPP Architect Engineering. The areas of the Construction, Start-up and Operation will be exception of the cases. By way of analyzing the KEPCO ENC's Processes/Procedures/Systems and the ones in PMBOK Guide, this report will show the contents in the PMBOK Guide is rather practical than theoretical. Meanwhile, implications whether the conclusions of this report might be applied to other industries such as general construction, non-nuclear plants, etc. should be left behind to follow-up studies.

키워드

참고문헌

  1. 프로젝트 관리 지식체계 지침서, 제4판, 한국프로젝트경영협회
  2. Project Management Body of Knowledge (PMBOK Guide) Fourth Edition, PMI (U.S.)
  3. Managing Successful Projects with PRINCE (Projects in Controlled Environments) 2TM, OGC(Office of Government Commerce, U.K.), 2009
  4. 전사적 리스크 관리 체계 구축, 한국전력기술주식회사
  5. 사업관리지침(Project Procedures Manual), 한국전력기술주식회사, 2012
  6. 사업설계관리절차서(Engineering Procedures Manual), 한국전력기술주식회사, 2012
  7. 사업설계지침서(Project Engineering Guideline), 한국전력기술주식회사, 2012
  8. 원전건설 경쟁력 제고방안(종합설계/구매분야), 2007, 한국전력기술주식회사
  9. 발전소 건설관리지침, 한국전력공사, 1993