1 |
In-Su Jung, Woo-Jung Kim, "Analysis of the Possibility of Required Resources Estimation for Nuclear Power Plant Decommissioning Applying BIM", Transactions of the Korean Nuclear Society Spring Meeting, 2014.
|
2 |
In-Su Jung, Woo-Jung Kim, "Direction for the Estimation of Required Resources for Nuclear Power Plant Decommissioning based on BIM via Case Study", Transactions of the Korean Nuclear Society Spring Meeting, 2014.
|
3 |
CIC(Cooperative Research Centre for Construction Innovation), "National Guidelines for Digital Modeling", 2009.
|
4 |
NIBS(National Institute of Building Science), "United States National Building Information Modeling Standard", 2007.
|
5 |
U.S. General Service Administration(GSA), "BIM Guide Overview", 2003.
|
6 |
buildingSMART Korea Website, Available From : http://www.buildingsmart.or.kr (accessed August., 10, 2015)
|
7 |
Chang-Hee Lee, Seong-Ah Kim, Sangyoon Chin, "An Index for Measuring the Degree of Completeness of BIM-based Quantity Take-Off", Korean journal of construction engineering and management, v.12 no.6, pp.79-92, November, 2011. DOI: http://dx.doi.org/10.6106/KJCEM.2011.12.6.79
DOI
|
8 |
Jae-Choul Shin, Ju-Hwan Hwang, Sang-Gyu Lee, Si-Won Lee, "BIM based Reliability Analysis and Automated Quantity Calculation", Korean Society of Hazard Mitigation, vol. 12, no.3, pp. 49-55, June, 2012. DOI: http://dx.doi.org/10.9798/KOSHAM.2012.12.3.049
DOI
|
9 |
Jae-Woo Park, Gi-Wook Ha, Won-Hwa Hong, "A Study on Database Construction of C&D Waste Using BIM on the Demolition Stage", Proceeding of Annual Conference of the Architectural Institute of Korea, v.33 no.2, pp.345-346, October, 2013.
|
10 |
Chang-Hak Kim, "Development of Integrated Computer System for Quantifying and Managing of Demolition Waste", Korean journal of construction engineering and management, v.12 no.1, pp.133-140, 2011. DOI: http://dx.doi.org/10.6106/KJCEM.2011.12.1.133
DOI
|
11 |
Korea Hydro & Nuclear Power Co., "A study on the mid to long term planning for domestic NPPs decommissioning", pp. 121-131, 2011.
|