• Title/Summary/Keyword: Overseas Construction Project

Search Result 220, Processing Time 0.032 seconds

Plan of BIM-based Quantity Take-off for Nuclear Power Plant Decommissioning (BIM을 활용한 원전 해체 물량산출 방안)

  • Jung, In-Su;Won, Ji-Sun
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.16 no.9
    • /
    • pp.6297-6304
    • /
    • 2015
  • Nuclear power plant decommissioning has attracted attention according to the shutdown decision of Kori 1 which is Korea's first nuclear power plant. Nuclear power plant decommissioning is the one who never experienced ever in our country. So, its process is difficult and time-consuming. In addition, it is difficult to determine the decommissioning quantity. This study proposed the plan that can be used in quantity take-off for nuclear power plant decommissioning using BIM technology being utilized in recent construction industry. As a result, we suggested the method of BIM-based quantity take-off such as the selection decommissioning method and process, setting up of BIM modeling environment, establishment of OBS & WBS, integrated BIM modeling, the definition of quantity property. The proposed plan can be utilized usefully from when permanent stopping nuclear power plant occurs intensively. Furthermore, the overseas nuclear power plant decommissioning project order also are expected through technology securement based on this plan.

Study on Management Plan of the Financial Supervisory Service According to Increase of Risk of Household Debts (중소형증권사 Project-Financing 우발채무 확대에 따른 금융감독원 관리방안에 관한 연구)

  • Lee, YunHong
    • Korean Journal of Construction Engineering and Management
    • /
    • v.19 no.4
    • /
    • pp.21-33
    • /
    • 2018
  • In 2018, the real estate markets have hardly been transacted according to the government's tight regulations of real estates, and have the high possibility to reach a low hit due to the hike of loan interest rates following the U. S rise of base money rate. The key profits for the large construction companies mainly come from the overseas plant projects and the domestic non-governmental construction projects. They suffered a lot such as the lowering of their credit ratings due to the large losses caused by the frquent design changes and work delay. Even in the domestic non-governmental construction projects, the general business risks are on the rise due to the property marketing moving over to the decreasing phase. The small and medium sized security companies has realized a lot of operaring profits as they participated in the PF market to make up for the losses in the securities trading business. But, now as the housing market is not so good around the nation except Seoul and the financial states of large construction companies are not good enough, they can face the liquidity crisis if there happens the problems in the PF backed securities which they have handled. As Korean economy experienced the crisis in the savings banks before, it is recommended that Financial Supervisory Service proposes the preemptive control method and supervision direction to overcome the crisis.

CM Prospects and Strategies Based on Contract Statistics : 1997 through 2014 (CM산업 수주실적 분석을 통한 CM기업의 발전 방안 - 1997년 ~ 2014년 실적자료 기반 -)

  • Ha, Jiwon;Jung, Youngsoo
    • Korean Journal of Construction Engineering and Management
    • /
    • v.17 no.5
    • /
    • pp.97-107
    • /
    • 2016
  • CM services have been focused on the advancement of the CM industry and expansion to overseas market based on CM capabilities. However, there has been lack of quantitative and comprehensive research to investigate current CM trends and prospects for improving competitiveness. In this sense, the purpose of this study is to statistically analyze total of 3,453 CM service contracts over the past 18 years (between 1997 and 2014) in term of market type, contract size, owner's type, commodity type. Finding of this research reveal that 1) compared to 2005, CM market size in 2015 increased as much as 2.5 times, and that 2) domestic CM projects count for 87.5%, architectural project 88.4%, less than 1 billion won small contracts 75%, respectively. Also, recently as CM company are developing capability and competitiveness, 1) overseas CM market share has grown up to 20% among total CM contract amount, and 2) CM contracts by private owners has increased 3 times demanding the total management services based on high technical capability. Additionally, the result of this paper supports the growth path model proposed by Jung et al. (2014), where a path from Domestic Public (DP3) and Domestic Private (DC2) CM projects towards the expansion to International Private (IC5) contracts was quantitatively analyzed. Implications for other practical issues are also briefly discussed.

Strategy for Various CM Applications based on Comparative Case Analysis (사례 비교분석을 통한 CM 적용 다양화 방안 - 발주자 특성 및 사업특성을 중심으로 -)

  • Kim, Namjoon;Jung, Youngsoo;Kang, Seunghee;Shin, Dongwoo
    • Korean Journal of Construction Engineering and Management
    • /
    • v.17 no.1
    • /
    • pp.10-17
    • /
    • 2016
  • Domestic CM market has continued to grow since the enactment of CM policies in 1996. In addition, future CM market is forecasted to have potential high growth. Therefore, it is necessary to apply various CM business models reflecting the owner's requirements and characteristics in order to improve in the CM industry and to strengthen the competitiveness in the overseas construction market. In this context, the purpose of this study is to suggest strategies of various CM applications based on comparison of 4 cases analyzed by 'business weight' and 'business depth' in terms of business function as well as by the types of 'CM market' and 'CM practice'. Result of this comparative analysis shows that each case presents differences in terms of type, business weight, and business depth of CM practice. However, domestic public CM services are currently being challenged to strengthen capability throughout the project life-cycle against the limitation of government's CM policies focused on the construction supervision. In order to address this problem, this study proposes the strategies of various CM applciations from several different perspectives

A Study on Environmental Impact Assessment Guidelines for Marine Environments in Construction Projects of Thermal Power Plant (화력발전소 건설사업의 해양환경 환경영향평가 가이드라인(안) 연구)

  • Maeng, Junho;Kim, Eunyoung;Kang, Taesoon;Son, Minho
    • Journal of Environmental Impact Assessment
    • /
    • v.26 no.1
    • /
    • pp.78-92
    • /
    • 2017
  • Environmental impact assessment(EIA) on the construction and operation of thermal power plant(TPP) is aimed at promoting sustainable coastal development by clearly identifying the marine physics and organisms effects of the project on the surrounding marine environment and minimizing its impact. The primary purpose of this study is to establish EIA guidelines for TPP in order to assess how TPP construction projects influence marine environment and to establish the mitigaion plans of environmental impacts. Through this study, scientific and efficient EIA guidelines for the marine environments were established by a specialist forum consisted of officials from the Ministry of Environment and the Ministry of Trade, Industry and Energy, personnel from five public corporations in charge of TPPs and marine environment experts. In the study, fifteen EIA reports (2009~2015) on TPPs submitted were analyzed to identify the shortcomings of current assessment items on marine environment and to collect a wide range of information including EIA report formulation regulations, domestic and overseas environmental survey guidelines and EIA review comments on TPPs. Based on the findings, a specialist forum put together EIA guidelines for TPP construction projects.

Research on ITB Contract Terms Classification Model for Risk Management in EPC Projects: Deep Learning-Based PLM Ensemble Techniques (EPC 프로젝트의 위험 관리를 위한 ITB 문서 조항 분류 모델 연구: 딥러닝 기반 PLM 앙상블 기법 활용)

  • Hyunsang Lee;Wonseok Lee;Bogeun Jo;Heejun Lee;Sangjin Oh;Sangwoo You;Maru Nam;Hyunsik Lee
    • KIPS Transactions on Software and Data Engineering
    • /
    • v.12 no.11
    • /
    • pp.471-480
    • /
    • 2023
  • The Korean construction order volume in South Korea grew significantly from 91.3 trillion won in public orders in 2013 to a total of 212 trillion won in 2021, particularly in the private sector. As the size of the domestic and overseas markets grew, the scale and complexity of EPC (Engineering, Procurement, Construction) projects increased, and risk management of project management and ITB (Invitation to Bid) documents became a critical issue. The time granted to actual construction companies in the bidding process following the EPC project award is not only limited, but also extremely challenging to review all the risk terms in the ITB document due to manpower and cost issues. Previous research attempted to categorize the risk terms in EPC contract documents and detect them based on AI, but there were limitations to practical use due to problems related to data, such as the limit of labeled data utilization and class imbalance. Therefore, this study aims to develop an AI model that can categorize the contract terms based on the FIDIC Yellow 2017(Federation Internationale Des Ingenieurs-Conseils Contract terms) standard in detail, rather than defining and classifying risk terms like previous research. A multi-text classification function is necessary because the contract terms that need to be reviewed in detail may vary depending on the scale and type of the project. To enhance the performance of the multi-text classification model, we developed the ELECTRA PLM (Pre-trained Language Model) capable of efficiently learning the context of text data from the pre-training stage, and conducted a four-step experiment to validate the performance of the model. As a result, the ensemble version of the self-developed ITB-ELECTRA model and Legal-BERT achieved the best performance with a weighted average F1-Score of 76% in the classification of 57 contract terms.

Characteristics on Pullout Behavior of Belled Tension Pile in Sandy Soils (사질토지반의 선단확장형말뚝의 인발거동 특성)

  • Cho, Seok-Ho;Kim, Hak-Moon
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.11 no.9
    • /
    • pp.3599-3609
    • /
    • 2010
  • Recently, the construction of coastal structures and high-rise structures against the horizontal and uplift forces increases with the developing the coastal developments. Especially the application of belled tension pile as foundation type to effectively resist uplift force is increasing in coastal structures. However, research on pullout resistance of belled tension pile has been limited and not yet been fully performed. Therefore, the pullout load tests of belled tension piles in four overseas sites were performed, then the bearing capacity, characteristics on load-displacement of piles and load distribution considering skin friction were investigated in this paper. In addition, the limit pullout bearing capacity calculated by the three-dimensional finite element analysis and theoretical methods were compared with values of in-situ test.

Installation Scheduling for the Development of Southwest Coast 2.5GW Offshore Wind Farm (서남해안 2.5GW 해상풍력단지 조성을 위한 설치 일정계획)

  • Ko, Hyun-Jeung
    • Journal of Korea Port Economic Association
    • /
    • v.33 no.2
    • /
    • pp.83-96
    • /
    • 2017
  • As a way to address global warming, among the renewable energy sources, there have been heavy investments worldwide for the development of offshore wind farms. However, such development has a drawback: investment costs are higher than those for onshore wind farms due to required operations such as offshore transportation and installation. In particular, delays in installation due to adverse maritime weather conditions are factors that affect the economics of offshore wind farms' operation. Therefore, in this study, we analyze the optimal schedule of the construction of an offshore wind farm from a macro perspective by considering the weather conditions in Korea. For this purpose, we develop a mathematical model and apply it to a 2.5 GW offshore wind farm project on the southwestern coast of the country. We use data from the Korea Meteorological Agency for maritime weather conditions and attempt to reflect the actual input data based on precedent cases overseas. The results show that it takes 6 months to install 35 offshore wind turbines. More specifically, it is pointed out that it is possible to minimize costs by not working in winter.

A Study on the Wind Load Design for Transmission Tower in Southeast Asia (동남아시아 송전철탑 풍하중 설계에 관한 연구)

  • Min, Byeong-Wook;Choi, Han-Yeol;Park, Jae-Ung;Oo, Khin-Maung;Sokhon, Nou;Bouapheng, Khoune
    • Proceedings of the KIEE Conference
    • /
    • 2007.07a
    • /
    • pp.719-720
    • /
    • 2007
  • Korea, for the first time in the world, constructed 765 kV double circuits transmission lines, which has 3 phases and 6 bundles with vertical arrangement using steel pipes in 1998. Also in 2002, we developed 765kV outdoor full GIS substation with self-developed technology. KEPCO accumulated a wealth of technologies for 765kV system construction and operation, and are listed 5th in technology field in the world. With this advanced technologies, we are developing oversea business. We started with a projects, 'Development Study on the Power System Network Analysis in Myanmar' in 2001, and continued the project to transmission design, consulting for transmission technology including the education of foreign trainees in south-east and middle east asia. Currently, 12 overseas businesses including 330kV transmission system consulting in Ghana, are in progress. In 2007, beginning with 750 kV transmission consulting in China, we are operating ATT(Advanced Transmission Technology) training program, which educate engineers of government and utilities company from China, Myanmar, Cambodia, Laos and Cambodia. However, for the successful development study on the power system, design of the power system and the training service, it is essential to standardize load design criteria in consideration of temperature, wind speed, air pressure and density, etc. of the other countries. Therefore, in this paper, standardized load design criteria for Cambodia, Laos, Myanmar is explained.

  • PDF

Simplified Analysis of Agricultural Water Network Model Using SWMM - A Case Study of Mandae Reservoir - (SWMM을 활용한 농업용수 네트워크 모형 단순화 분석 - 만대 저수지 사례를 중심으로 -)

  • An, Sung-Soo;Bang, Na-Kyoung;Lee, Jong-Seo;Bang, Sung-Soo;Nam, Won-Ho;Kim, Han-Joong
    • Journal of The Korean Society of Agricultural Engineers
    • /
    • v.64 no.1
    • /
    • pp.27-37
    • /
    • 2022
  • This study established a water supply network based on the operation case of Mandae Reservoir in Yanggu-gun, Gangwon-do, to analyze the efficient distribution and management of agricultural water supplied from the reservoir to irrigation areas using the hydraulic analysis model SWMM. In order to construct a model to analyze the water canal network, network conditions needs to be simplified, and in particular, excessive detail or simplification of the irrigation area can lead to errors in the analysis results. Therefore, the effect of the water canal network model was analyzed by simulating the appropriate simplification process step by step. The results of simplifying the actual block shape of the analysis target area using SWMM showed that there was no significant difference in the results even if 7 lots were simplified to 2. Also, it was found that the construction and analysis of a simplified network model were reliable when the excess quantity was 2% or more compared to the required quantity for each case of analysis of the paddy field.