• Title/Summary/Keyword: Overseas Architecture Project

Search Result 33, Processing Time 0.022 seconds

A Comparative Study on the Nominated Subcontractor (NSC) System of Building Construction Project in Asian Commonwealth of Nations - Focused on the NSC Clause Analysis of Standard Contract Forms - (아시아 지역 영연방국가의 지정하도급(NSC)제도에 관한 비교 연구 - 표준계약약관의 지정하도급자 항목분석을 중심으로 -)

  • Cho, Jaeyong;Kim, Junggon;Park, Hyeonggeun
    • Korean Journal of Construction Engineering and Management
    • /
    • v.15 no.3
    • /
    • pp.12-22
    • /
    • 2014
  • In recent, many Korean contractors have tried to extend their business area into the overseas construction market, mainly as a result of a reduction in their domestic construction market. However in terms of risk, overseas construction projects are likely to face a number of unpredictable problems, many of which occur as a result of differences in contract cultures and construction environments between Korea and other countries. One key issue facing overseas construction projects in particular, is that of sub-contracting and control, and the way in which many countries of Commonwealth of Nations operate a unique subcontracting method well known as a nominated sub-contractor(NSC). This paper introduces the NSC system and differences as comparing among standard construction contract forms, such as JCT, SIA, HKIA and PAM. in UK and Asian Commonwealth of Nations. Also, we attempt to classify the type of the NSC system through the consideration of NSC clauses in accordance with the objection and termination of NSC contracting respectively.

A Study of the Overseas-Constructed Korean Garden using Native Plants from the Korean Peninsula - The Case Study of 'Das Dritte Land (The Third Nature)' - (한반도 자생식물로 조성한 해외 한국정원 연구 - Das Dritte Land(제3의 자연)를 사례로 -)

  • Seo, Jayoo
    • Journal of the Korean Institute of Landscape Architecture
    • /
    • v.49 no.4
    • /
    • pp.1-14
    • /
    • 2021
  • This study examined the techniques of creating gardens overseas using native plants from the Korean peninsula, focusing on the case of 'Das Dritte Land', an art garden created in Berlin, Germany. While Korean garden artists are recognized worldwide and are planning to globalize Korean gardens, the purpose of this study is to share information so that Korean gardeners can expand their activities and rediscover the utilization and value of plants native to the Korean peninsula. The work began as part of a project to mark the 30th anniversary of the collapse of the Berlin Wall. To realize the landscape of Korea with the motif of Inwang Jesaekdo, the geographical shape of the Baekdu-Daegan trail was reproduced with black stone, and the naturalization of Korean peninsula species was utilized in the creation of a garden Berlin. It is a surreal bio-top utopia that blooms with the bio-groups of the Korean peninsula. This study examined the process of plant survey analysis, transportation and stabilization, planting planning, composition and monitoring, and targeting the self-growth of the Korean peninsula, which is a symbol of harmony between the South and the North. The planting of Korea's native plants in overseas gardens symbolizes the uniting of the ecosystems on the Korean peninsula. The process of the Korean peninsula's young plants taking root, flowering, and spreading along Germany's previously divided border metaphorically conveys the desire for the unification of the Korean peninsula. In addition, various art programs in the garden space suggest a foundation for cultural dialogue and communication between the two Koreas. Moreover, creating gardens overseas implies that the cooperation of plant research institutes plays an important role in the transfer of plants and the maintenance of life, while the advancement of Korean gardens overseas plays an essential role in the spread of garden culture in our country.

Utilizing SWOT Model to Define a Strategy for the Korean Construction Companies in Preparation of the Changes in the Global Construction Market

  • Kim, HwaRang;Jang, HyounSeung
    • International conference on construction engineering and project management
    • /
    • 2015.10a
    • /
    • pp.486-490
    • /
    • 2015
  • SWOT model was used to develop strategies for the Korean construction firms in entering the global construction market. Literature review, official statistics survey and other research methods were utilized in order to extract internal and external environmental factors of both the firm and local area. By extracting strength, weakness, opportunity and threat factors, a total of 12 strategies were produced: SO (Strengths-Opportunities), ST (Strengths-Threats), WT (Weaknesses-Threats), and WO (Weaknesses-Opportunities). The result of the study can be utilized as a basic data in developing a strategy for the Korean construction firms to penetrate into the global construction market.

  • PDF

A Comparative Analysis on the Merits and Demerits in Domestic and Overseas Public Facilities Management (P-FM)

  • Yoon, Seung-Wook;Lee, Chun-Kyong
    • International conference on construction engineering and project management
    • /
    • 2015.10a
    • /
    • pp.357-360
    • /
    • 2015
  • For the last 40 years, the Korean government has built and supplied diverse public facilities. The Korean government, which has supplied diverse public facilities for the last 40 years, has maintained these public facilities as breakdown maintenance under limited budget. Because of increase of aging of public facilities and insufficient budget, it needs the total public facility maintenance. Especially, as Japan has also experienced similar issues and solved these, they are the introduction of P-FM theory and see successful examples. In this study, by comparison Analysis on the Merits and Demerits for Public Facility management (P-FM) between domestic and abroad, it would find a future direction to public facility management P-FM is to go.

  • PDF

Post Occupancy Evaluation of the Central Hospital in Quang Nam Province of Vietnam Funded by Korean ODA (ODA 지원 베트남 중부 꽝남성 종합병원의 거주후 평가)

  • Kwon, Soon Jung;Yu, Yeo Kyoung;Kim, Jihyun;Bang, Seol Ah
    • Journal of The Korea Institute of Healthcare Architecture
    • /
    • v.22 no.1
    • /
    • pp.39-49
    • /
    • 2016
  • Purpose: This is the ex-post evaluation on "the Central General Hospital in Quang Nam Province in Vietnam" funded by Korean ODA. Through this evaluation, this study tries to explore useful ways to improve the effectiveness of Korean ODA projects related to hospital establishment. Methods: Field survey and analysis of questionaire to the staffs and patients of Quang Nam Province General Hospital were conducted twice in 2012 and 2014 after the completion of the Hospital. Two sets of surveys and questionaire outcomes have been comparatively analysed by statistics in order to seek the trend of satisfaction level of hospital users and find out the improvement way in hospital design and construction. Results: The satisfaction level on the hospital was relatively high and that of 2014 is higher than that of 2012. The satisfaction level of the users was recorded in Likert 5 scales. Continuous facility complement and maintenance is considered as the main contributor in increasing the satisfaction level of users. As far as the satisfaction level of outpatient is concerned, that of 2012 was recorded as 3.65 and that of 2014 was 4.05. In case of inpatient, the satisfaction level on the hospital in 2012 was 3.76, and 4.06 in 2014. Implications: In overseas hospital projects, proper hospital project management system including medical service plan, strategic plan, brief, design & construction and maintenance have to be put together effectively and efficiently for the success of the hospital project. At the same time local climate, culture, building material and local code have to be considered in order to build sustainable hospital.

Discovering Applicable Lessons for '3D Printing R/D Project' Implementation Through Studying the Process of Adopting Overseas Industrialized Building Production Technological Knowhow in the Korean Context (한국의 공업화건축 공법 도입활용과정 분석을 통한 3D 프린팅기술 개발 방향성 연구)

  • Lee, Sung-Min;Lee, Pil-Won;Cho, Hoo-Young;Lee, Jae-Heon
    • Journal of Korean Association for Spatial Structures
    • /
    • v.17 no.4
    • /
    • pp.59-68
    • /
    • 2017
  • This paper aims at finding some lessons applicable to successful implementation of 'The 3D Printing R/D Project' through both examining the process of adopting overseas industrialized housing production technological knowhow by home builders during the 1970's~1980's period and thereafter until now the various efforts to adjust the technologies efficiently to the Korea's unique situation. Some meaningful lessons can be summarized as follows; I) Deep understanding of 3DP technological know-why along with its inheritance, II) Readjusting of R/D period and goals(cf. Global leader Winsun's 15 years experiment), III) Restructuring for more collaborative R/D B&E system among participating researchers IV) Fostering 3DP expert-engineers and technicians from the early stage, V) Clearing legal barriers in users' adopting 3DP methods necessary, VI) Development of appropriate building material besides concrete. Therefore, it is highly recommended that the above-mentioned 6 lessons positively accepted and applied to the Research Implementation Plan in due course, especially by KICT consortium and KAIA under the guidance of Ministry of Land, Infrastructure and Transport.

Construction of Information System for Promoting Overseas Urban Development (해외도시개발 지원 종합정보시스템 구축방안)

  • Jeong, Yeun-Woo
    • Land and Housing Review
    • /
    • v.7 no.1
    • /
    • pp.9-18
    • /
    • 2016
  • This research aims to build a total information system that systematizes existing sporadic information, which may lead to revitalization and efficiency of overseas urban development. To achieve this, this study firstly analyses the current information systems for urban development in foreign countries and information from the private sector. The results show that the information system that operates in the domestic agencies, are less likely to involve the contents related to information sharing, social network building and business process. However, that used in agencies ordering the overseas urban development projects, mostly provides the information of professionals, project participants and their business. Second, this research selects the information to be provided by the integrated information system and proposes a data collection plan. The information, required to push forward urban development in abroad, is classified into seven categories. Third, this study establishes a target model of comprehensive information system and makes suggestions for institutional improvement. For doing this, it categorizes overseas urban development information, links to classified information, organizes the system into three stages to services through informational channels, and then suggests a target model. Furthermore, it proposes institutional improvement to achieve efficiency of information systems through a comprehensive review of the similar cases such as administrative system of architecture(Seumter) and land information system.

Risk Assessment Model for the Delay Protocol in the Conditions of Contract of International Construction Projects (해외 건설공사 공기지연사건의 합리적 대응을 위한 계약조건 리스크 평가 방법)

  • Lee, Hwangku;Shin, Dongwoo;Kim, Kyungrai;Cha, Heesung;Kim, Youngjae
    • Korean Journal of Construction Engineering and Management
    • /
    • v.18 no.6
    • /
    • pp.65-77
    • /
    • 2017
  • Recently, many Korean major construction companies are suffering from profit loss mainly due to a direct impact from delays in their overseas projects. In general, changes are inevitable in a large-scale project, and most of changes are directly linked to construction delay. Therefore, in the event that an extension of time is necessary due to a change, the contractor must manage the delay based on the condition of the contract to effectively manage risks from delay to the completion date. Thus it is important to understand delay protocol defined in the condition of the contract early in the project, but there have been few or no study to propose methodology or tool to support this effort. This paper presents a review on the project planning and controling practices of major Korean construction companies along with the issues on delay claims and disputes in mega-international projects and suggests a tool to assess delay risk in the condition of the contract. To propose a delay risk assessment model for international construction projects, major standard conditions of contract have been reviewed including FIDIC Red Book(1999), PSSCOC(2014) and SIA 9th Edition(2010). To reflect recent trend of major international owners, standard conditions which they are utilizing for their projects also have been reviewed including those of ARAMCO and QP. The model provides a categories of risks to be reviewed on the condition of the contract along with standard level of the risk which is common in the international standard form of the contracts. This study also performed a case study on an actual international project to confirm the effectiveness of proposed model to identify and respond to a delay risk of a project.

Analyzing the ODA Construction Project Competence based on IPA (IPA 기반의 공적개발원조 건설사업 역량 분석)

  • Kim, Hwarang;Jung, Mincheol;Jang, Hyounseung
    • Korean Journal of Construction Engineering and Management
    • /
    • v.22 no.5
    • /
    • pp.66-72
    • /
    • 2021
  • Participation in official development assistance (ODA) construction projects can be proposed as a way to revitalize Korean small and medium-sized construction companies' entry into the overseas construction market. To this end, the necessary competency items were derived for the execution of the project, and a survey was conducted and an analysis of importance-current competency was performed. 24 out of a total of 32 competency items were analyzed as having a low level of competency compared to their importance, indicating that it is urgent to strengthen corporate-level capabilities for the smooth execution of related projects in the future. In detail, it is judged that it is necessary to seek to establish a preferential capacity-strengthening plan for contract management-related items such as the 'Construction-related fundamental laws, Contract management method, and International administration negotiation'.

A Study on the Effects of BIM Adoption and Methods of Implementationin Landscape Architecture through an Analysis of Overseas Cases (해외사례 분석을 통한 조경분야에서의 BIM 도입효과 및 실행방법에 관한 연구)

  • Kim, Bok-Young;Son, Yong-Hoon
    • Journal of the Korean Institute of Landscape Architecture
    • /
    • v.45 no.1
    • /
    • pp.52-62
    • /
    • 2017
  • Overseas landscape practices have already benefited from the awareness of BIM while landscape-related organizations are encouraging its use and the number of landscape projects using BIM is increasing. However, since BIM has not yet been introduced in the domestic field, this study investigated and analyzed overseas landscape projects and discussed the positive effects and implementation of BIM. For this purpose, landscape projects were selected to show three effects of BIM: improvement of design work efficiency, building of a platform for cooperation, and performance of topography design. These three projects were analyzed across four aspects of implementation methods: landscape information, 3D modeling, interoperability, and visualization uses of BIM. First, in terms of landscape information, a variety of building information was constructed in the form of 3D libraries or 2D CAD format from detailed landscape elements to infrastructure. Second, for 3D modeling, a landscape space including simple terrain and trees was modeled with Revit while elaborate and complex terrain was modeled with Maya, a professional 3D modeling tool. One integrated model was produced by periodically exchanging, reviewing, and finally combining each model from interdisciplinary fields. Third, interoperability of data from different fields was achieved through the unification of file formats, conversion of differing formats, or compliance with information standards. Lastly, visualized 3D models helped coordination among project partners, approval of design, and promotion through public media. Reviewing of the case studies shows that BIM functions as a process to improve work efficiency and interdisciplinary collaboration, rather than simply as a design tool. It has also verified that landscape architects could play an important role in integrated projects using BIM. Just as the introduction of BIM into the architecture, engineering and construction industries saw great benefits and opportunities, BIM should also be introduced to landscape architecture.