A Comparative Study on the Nominated Subcontractor (NSC) System of Building Construction Project in Asian Commonwealth of Nations - Focused on the NSC Clause Analysis of Standard Contract Forms -  

Cho, Jaeyong (Department of Architecture and Architectural Engineering, Graduate School of Engineering, Kyoto University)
Kim, Junggon (Department of Architecture and Architectural Engineering, Graduate School of Engineering, Kyoto University)
Park, Hyeonggeun (Construction Management & Economy Research Division, Korea Institute of Construction Technology)
Publication Information
Korean Journal of Construction Engineering and Management / v.15, no.3, 2014 , pp. 12-22 More about this Journal
Abstract
In recent, many Korean contractors have tried to extend their business area into the overseas construction market, mainly as a result of a reduction in their domestic construction market. However in terms of risk, overseas construction projects are likely to face a number of unpredictable problems, many of which occur as a result of differences in contract cultures and construction environments between Korea and other countries. One key issue facing overseas construction projects in particular, is that of sub-contracting and control, and the way in which many countries of Commonwealth of Nations operate a unique subcontracting method well known as a nominated sub-contractor(NSC). This paper introduces the NSC system and differences as comparing among standard construction contract forms, such as JCT, SIA, HKIA and PAM. in UK and Asian Commonwealth of Nations. Also, we attempt to classify the type of the NSC system through the consideration of NSC clauses in accordance with the objection and termination of NSC contracting respectively.
Keywords
Overseas construction project; Standard contract form; Commonwealth of nations; Nominated subcontract;
Citations & Related Records
Times Cited By KSCI : 2  (Citation Analysis)
연도 인용수 순위
1 Mbachu, J. (2008). "Conceptual framework for the assessment of subcontractors'eligibility and performance in the construction industry", Construction Management and Economics, 26, pp. 471-484.   DOI
2 Murdoch, J., and Hughes, W. (2008). "Construction Contracts : Law and Management" 4th Edition, Taylor & Francis, p. 283.
3 Park, H., Shin, E and Lee, K. (2008). "Improvement plan going into other countries of domestic construction companies", Korean journal of Construction Engineering and Management, KICEM, 9(6), pp. 225-234.   과학기술학회마을
4 Real Estate Developer's Association of Singapore (2010). "REDAS Design and Build Conditions of Contract" 3rd Edition, REDAS Publications.
5 Singapore Academy of Law Hompage : Commercial Law, Ch.26 Building and Construction Law,
6 Singapore Institute of Architects (2011). "Articles and Conditions of Building Contract Lump Sum Contract" 9th Edition, SIA Publications, pp. 23-27.
7 Statistics Korea: Overseas construction contracts
8 The Hong Kong Institute of Architects (2005). "Agreement & Schedule of Conditions of Building Contract", HKIA Publications, pp. 57-63.
9 Uher T. E. (1991). "Risks in subcontracting : Subcontract conditions", Construction Management and Economics, 9, pp. 495-508.   DOI
10 Yik, FWH., Lai, JHK., Chan, KT., and Yiu, ECY. (2006). "Problems with specialist subcontracting in the construction industry", Building Serv. Eng. Res. Technol., 27(3), pp. 183-193.   DOI
11 Zhi, H. (1995). "Risk management for overseas construction projects", International Journal of Project Management, 13(4), pp. 231-237.   DOI   ScienceOn
12 An, C., Yoo, H., and Kim, Y. (2012). "A Decision Support Model for the Exchange Risk Management of Overseas Construction Projects" Korean journal of Construction Engineering and Management, KICEM, 13(3), pp. 109-121.   과학기술학회마을   DOI
13 Cheung, S. O., Yiu, K. T., and Chim, P. S. (2006). "How Relational are Construction Contracts?", Journal of Professional Issues in Engineering Education and Practice, 132(1), pp. 48-56.   DOI
14 Dulaimi, M. F., and Shan, H. G. (2002). "The factors influencing bid mark-up decisions of large-and medium-size contractors in Singapore", Construction Management and Economics, 20, pp. 601-610.   DOI   ScienceOn
15 Eguchi, T., Miyoshi, K., and Yabuuchi, T. (2000). "On the Rules of Nominated Subcontractor(NSC) and Prime Cost Contract(PCC) in UK", Proceedings of 16th symposium on building construction and Management of Projects, Tokyo, pp. 189-215.
16 Hughes, G., Gray, C., and Murdoch, J. (1994). "Construction subcontracts : for what we are about to receive" 7th annual Construction Law Conference, King's College, London, pp. 1-15.
17 International Contractors Association of Korea (2013). "Amount of overseas construction contract by region: (Jan. 20, 2014).
18 Joint Contract Tribunal (2011). "Design and Build Contract 2011" RIBA Publications, pp. 78-79.
19 Joint Contract Tribunal (2011). "Standard Building Contract with Approximate Quantities 2011" RIBA Publications, pp. 47-48.
20 Kennedy, P., Morrison, A., and Milne, D. O. (1997). "Resolution of disputes arising from set-off clauses between main contractors and subcontractors" Construction Management and Economics, 15, pp. 527-537.   DOI
21 Hinze, J., and Tracey, A. (1994). "The Contractor-Subcontractor Relationship : The Subcontractors' View", Journal of Construction Engineering and Management, 120(2), pp. 274-287.   DOI
22 Pertubuhan Akitek Malaysia (2006). "Agreement and Conditions of PAM Contract" PAM Publications, pp. 32-35.