• Title/Summary/Keyword: Overhead Contact Wire

Search Result 59, Processing Time 0.023 seconds

Study on Power Line Coupler for Auxiliary Power to Overhead Line (철도 전차선의 보조전원을 위한 전력선 커플러 연구)

  • Lee, Gunbok;Yi, Kyung-Pyo;Kim, Myung Yong;Lee, Su Gil;Chang, Sang Hoon
    • The Journal of Korean Institute of Electromagnetic Engineering and Science
    • /
    • v.29 no.7
    • /
    • pp.566-569
    • /
    • 2018
  • A power line coupler that can apply high-frequency power to a railway overhead line structure was analyzed. It is difficult to supply auxiliary power to an overhead line in a high-voltage environment, and doing so requires a long-distance transfer. A method is proposed that utilizes the resonance on the Rogowski coil, which does not use a magnetic core. A simple overhead line structure was fabricated that consisted of a contact wire, messenger wire, and dropper. Couplers of various sizes were fabricated and deployed on the messenger wire, and the transfer characteristics of the two couplers were compared at a distance. As a result of applying the matching circuit to the coupler, the transmission efficiency was 53% at a distance of 2.5 m. The proposed method shows that it is possible to apply the auxiliary power by using the existing conductor in a special structure, such as the overhead line.

Analysis for Catenary System with Focus on Abnomal Conditions on Honam High Speed Line (호남고속철도 전차선로의 이상 상태 분석)

  • Jun, Jaegeun;Shin, Seungkwon;Jung, Hosung;Na, Kyungmin;Park, Young
    • Journal of the Korean Institute of Electrical and Electronic Material Engineers
    • /
    • v.32 no.1
    • /
    • pp.1-5
    • /
    • 2019
  • The overhead contact line (OCL) is a key piece of equipment for transmitting electrical energy to the pantograph of rail cars. Recently, a 400 km/h OCL was applied to the Honam high-speed line, and its performance was examined by running HEMU-430X. For the study, we analyzed the current of catenary wire concurrently while running HEMU-430X in the Honam high-speed line. Specifically, this study recorded the currents for each speed during operation of the railway vehicle. The analysis of the frequency of line current showed generation of third-harmonics, 15th-harmonics, 17th-harmonics, and 19th-harmonics. The current of catenary wire is a basic technology assessment used to determine the electrical safety of electric railway systems, and it can be used as a technology for analyzing circulating currents generated in the current configuration, as well as for analyzing electric fatigue of the OCL components.

A Study on Technologies for Measuring Static Condition of Rigid Conductor System in Railway Electrification (전기철도 강체전차선로의 정적 상태 검출 기술 연구)

  • Na, Kyung Min;Lee, Kiwon;Park, Young
    • Journal of the Korean Institute of Electrical and Electronic Material Engineers
    • /
    • v.32 no.6
    • /
    • pp.507-511
    • /
    • 2019
  • The purpose of an electric railway system contact wire is to supply electric energy to trains through a contacted pantograph. This energy is then converted into mechanical energy. Recent developments in overhead contact lines include the increase in the tension force up to 34 kN according to train speeds that reach up to 400 km/h with a verified safety. Rigid conductor catenary (R-Bar) for high speeds of up to 250 km/h have been developed in tunnels to save on construction costs. This is significant because minor defects in R-bars in aspects, such as height and stagger affect installation conditions. In this study, we propose the use of a detector that measures the static characteristics to reduce the R-bar installation errors. This detector has been developed to measure the height and stagger of the contact wire using video images.

Technique on the speed up of neutral section in the catenary system (절연구분장치의 속도향상 기술)

  • Chang, Sang-Hoon;Park, Byung-Soo;Kim, Young-Gon
    • Proceedings of the KIEE Conference
    • /
    • 2005.05b
    • /
    • pp.71-74
    • /
    • 2005
  • At the neutral sections, There are neutral sections inserted in overhead contact line between the substations to divide different phase current sections of AC electrified lines. except convention line, a large stress occurs in the contact wire near the fittings under passing pantographs. So, in order to raise the train speed over 150km/h, a new type section has been adopted.

  • PDF

Technique for the Speed Up of Neutral Section on the Convention Line Catenary System (기존선 교류전기철도 절연구분장치에서의 속도향상 기술)

  • Chang, Sang-Hoon;Lee, Ki-Won
    • Proceedings of the KSR Conference
    • /
    • 2008.11b
    • /
    • pp.294-301
    • /
    • 2008
  • At the neutral sections, There are neutral sections inserted in overhead contact line between the substations to divide different phase current sections of AC electrified lines. Except convention line, a large stress occurs in the contact wire near the fittings under passing pantographs. So, in order to raise the train speed over 150km/h, a new type section has been adopted.

  • PDF

A Study on the Geometry Change for the Increased Contact Wire Tension in the Pre-sagged Existing Catenary (사전 이도가 주어진 기설 전차선로에서 전차선 장력을 증가시켰을 때 전차선 기하학적 형상 변화 연구)

  • An, Seung-Hwa;Kim, Yoon-Ho
    • Journal of the Korean Society for Railway
    • /
    • v.15 no.5
    • /
    • pp.447-453
    • /
    • 2012
  • It is studied that the structure of the contact plane geometry of the contact wire would be changed when the contact wire tension is increased in the existing overhead contact lines for the purpose of improving the operation speed temporarily. In this paper, the dropper length formula which could be well applied to the pre-sagged catenary is reviewed first. Second, the changing amount of the pre-sag if the contact wire tension change from 20kN to 23kN or from 20kN to 25kN for the Gyeongbu HSL(high speed line) 49.5m catenary is evaluated by using of the self-written program in accordance with the dropper length formula. Moreover, the increasing tension and measuring the pre-sag change experiment in the Gyeongbu 2 HSL was conducted. The calculated data are compared with the measured data. As a result, it is found that the geometry change is very little and will not make the current collection performance deteriorated.

A Study on the Effects of Construction Tolerances on the Current Collection Performance for High Speed Catenary System (고속전차선로의 시공 허용오차가 집전성능에 미치는 영향에 관한 연구)

  • Kim, Tae-Hun;Seo, Ki-Bum;Park, Jae-Young
    • The Transactions of The Korean Institute of Electrical Engineers
    • /
    • v.64 no.12
    • /
    • pp.1782-1788
    • /
    • 2015
  • In this paper, analysis of the effects for construction tolerances on the current collection performance of high speed catenary system. The height of the contact wire is the geometrical position of the cantilever directly affects the current collection performance. Contact force when the height of the contact wire exceeds the construction tolerance were analyzed. As a result, the maximum contact force was analyzed to more than 350[N] that are recommended by EN50119. And when the geometrical position of the cantilever to exceeds the construction tolerance, the analysis results of uplift at the mast support points, it becomes 127[mm] that are recommended by UIC 799. If the construction tolerances exceeds the reference value, the current collection performance is deteriorated. Therefore, catenary system require high precision construction. In the future, there is a need for continuing research on the tolerance of catenary system in the actual operating state.

Development of a Tensioning Device for the 400km/h High-speed Overhead Contact Line (400km/h급 전차선로용 장력조정장치 개발)

  • Cho, Yong Hyeon;Lee, Kiwon;Kwon, Sam Young;Cho, Ho Rung
    • The Transactions of The Korean Institute of Electrical Engineers
    • /
    • v.64 no.12
    • /
    • pp.1789-1795
    • /
    • 2015
  • The pulley-type tensioning device subjected to a maximum tension of 34 kN has been developed for 400 km/h high-speed railway. The tensioning device is to maintain the tension variation within 3% of the normal value, irregardless of temperature changes. Field tests shows that the tensioning device had a variation of tension which was as small as 0.6% as temperatures changed from $-5{\sim}7^{\circ}C$. Along with the tensions, we measured its X and Y movements due to the temperature changes. Based on a combination of its X and Y movements, we proposed a new performance index with which we can see if the tensioning device has troubles in operation without tension measurements.

Simulation-based Parametric Study of the Current Collection System of High Speed Trains (시뮬레이션에 의한 고속전철용 집전시스템 매개변수 연구)

  • 한형석
    • Journal of the Korean Society for Railway
    • /
    • v.6 no.4
    • /
    • pp.279-285
    • /
    • 2003
  • In an electric traction system in which power is supplied from a catenary via a pantograph, the mechanical design of the catenary and pantograph is clearly of importance in relation to the problem of current collection at high speed. A computer-simulation technique is used to study the effects of changing parameters of pantograph and catenary on the quality of current collection at high speed. The current collection system is evaluated on the basis of the contact-force variations and displacement responses of the pantograph and contact wire. This study shows that current-collection quality is determined primarily by the overhead line parameters rather than by the pantograph. The results can be applied to optimize the design of current-collection systems.

Development of Calcutation Software for Dropper Length (전차선로 드롭바 길이 계산프로그램 개발)

  • Lee Kiwon;Kwon Sanmyoung;Kim Joorak;Jang Donguk
    • Proceedings of the KSR Conference
    • /
    • 2003.05a
    • /
    • pp.421-426
    • /
    • 2003
  • Dropper which can get to suspend contact wire should be installed with a uniform distribution, so that electric locomotive can have good characteristics of current collection. Because dropper distribution is changed according to a circumstances in the construction field, it is hard to calculate and construct a overhead line. Therefore, in this study, a program was developed to calculate the dropper length in the normal and elevation section. Through the program, it is possible to perform a accurate construction of overhead line and contribute to a improvement of current collection as well.