• 제목/요약/키워드: Optimized Schedule

검색결과 70건 처리시간 0.023초

IEEE 802.15.4e TSCH-mode Scheduling in Wireless Communication Networks

  • Ines Hosni;Ourida Ben boubaker
    • International Journal of Computer Science & Network Security
    • /
    • 제23권4호
    • /
    • pp.156-165
    • /
    • 2023
  • IEEE 802.15.4e-TSCH is recognized as a wireless industrial sensor network standard used in IoT systems. To ensure both power savings and reliable communications, the TSCH standard uses techniques including channel hopping and bandwidth reserve. In TSCH mode, scheduling is crucial because it allows sensor nodes to select when data should be delivered or received. Because a wide range of applications may necessitate energy economy and transmission dependability, we present a distributed approach that uses a cluster tree topology to forecast scheduling requirements for the following slotframe, concentrating on the Poisson model. The proposed Optimized Minimal Scheduling Function (OMSF) is interested in the details of the scheduling time intervals, something that was not supported by the Minimal Scheduling Function (MSF) proposed by the 6TSCH group. Our contribution helps to deduce the number of cells needed in the following slotframe by reducing the number of negotiation operations between the pairs of nodes in each cluster to settle on a schedule. As a result, the cluster tree network's error rate, traffic load, latency, and queue size have all decreased.

건설현장 소음제한을 고려한 최적 스케줄링 프로세스 모델 개발 (Developing an Optimized Scheduling Process Model for Controlling the Noise in Construction Field)

  • 이승학;손재호;이승현
    • 한국건축시공학회지
    • /
    • 제14권5호
    • /
    • pp.467-476
    • /
    • 2014
  • 최근 건설공사의 기계화로 인한 많은 장비 투입으로 인하여 주변 주민들이 현장 소음에 인한 피해보상을 요구하는 민원이 증가하고 있다. 하지만 현장소음은 예방차원이 아닌 공사 진행과정에서만 제한적으로 관리되며 민원이 발생하고 나서야 대부분의 대처가 이루어지고 있는 실정이다. 또한, 이러한 민원을 해결하기 위해서는 비용과 시간이 과다하게 소요되는데 이는 건설사에 부정적인 영향을 미치게 된다. 이에 본 연구는 착공 전부터 계획된 공사기간과 장비투입 조건을 활용하여 최적 공사비를 찾는 알고리즘을 제안하고 최적 공정표를 도출할 수 있는 스케줄링 프로세스 모델을 개발하는 데 그 목적이 있다. 또한, 이를 활용하여 현장관리자가 공사계획 수립 시 소음발생 여부에 따라 민원이 발생할 때 예측되는 비용정보 및 소음제한에 따른 공사비와 공사기간의 변화 정도를 비교 분석함으로써 보다 합리적이고 효율적인 공사 관리를 수행할 수 있도록 한다.

유전자 알고리즘 기반 다중 모듈러 건축 프로젝트 수행 시 모듈러 유닛 공장생산계획수립 모델 개발 (Development of Manufacturing Planning for Multi Modular Construction Project based on Genetic-Algorithm)

  • 김민정;박문서;이현수;이정훈;이광표
    • 한국건설관리학회논문집
    • /
    • 제16권5호
    • /
    • pp.54-64
    • /
    • 2015
  • 모듈러 건축공법은 공장 생산, 운송, 현장설치 프로세스를 통해 기존 현장중심 건축공법에 비해 품질향상 및 공기단축이 가능한 특징을 가지고 있다. 특히 모듈러 유닛의 제작과 시공이 분리되어 수행되기 때문에 다수의 프로젝트가 동시에 수행될 경우 각 프로젝트에 따라 생산해야하는 모듈의 크기, 수량, 납기일, 생산 유형 및 과정을 고려하는 SCM(Supply Chain Management) 관점의 공장 생산 공정 계획 수립이 필요하다. 그러나 현재 모듈러 유닛 공장 생산 계획은 개별 프로젝트 중심으로 수립되고 있어 다중 모듈러 건축 프로젝트 수행 시 모듈러 유닛 제작공장의 한정된 자원과 설치 현장별 프로젝트 요구조건들을 동시에 고려한 공장 생산계획을 도출하는데 한계가 있다. 따라서 본 연구에서는 다양한 변수 간 상호 연계성 및 제약조건으로 공정 계획 최적화 결과 도출이 가능한 유전자 알고리즘 방법을 통해 모듈러 유닛 제작공장의 한정된 자원과 설치 현장별 요구사항이 반영된 모듈러 유닛 공장 생산 공정계획 최적화 수립 모델을 제시하며 이를 사례분석을 통해 검증하였다. 연구 결과, 기존 다중프로젝트의 공장생산계획에 비해 평균 7.9%의 현장설치 공기단축 및 43%의 최대 야적장 이용률 감소가 가능하였다. 향후 본 연구 내용을 바탕으로 제약 조건 범위 확장 및 생산성 데이터 추가가 될 경우 다중 모듈러 건축 프로젝트의 모듈러 유닛 공장 생산 계획 수립과 현장시공프로세스 구축을 동시에 지원할 수 있는 기초 자료로 활용될 수 있다.

Rescaled Simulated Annealing에 의한 항공우주 구조물의 최적설계 (Optimization of Aerospace Structures using Resealed Simulated Annealing)

  • 지상현;박정선
    • 대한기계학회:학술대회논문집
    • /
    • 대한기계학회 2004년도 추계학술대회
    • /
    • pp.522-527
    • /
    • 2004
  • Resealed Simulated Annealing (RSA) has been devised for improving the disadvantage of Simulated Annealing (SA) which require tremendous amount of computation time. RSA and SA have been for optimization of satellite structures and for comparison of results from two algorithms. As a practical application, a satellite structure is optimized by the two algorithms. Weights of satellite upper platform and propulsion module are minimized. MSC/NASTRAN is used for the static and dynamic analysis. The optimization results of the RSA are compared with results of the classical SA. The numbers of optimization iterations could be effectively reduced by the RSA.

  • PDF

100 MWe 순산소 석탄연소 발전시스템의 개념설계-영동 프로젝트 (Conceptual Design of 100 MWe Oxy-coal Power Plant-Youngdong Project)

  • 최상민
    • 한국연소학회지
    • /
    • 제17권3호
    • /
    • pp.30-45
    • /
    • 2012
  • An existing unit of power plant is considered to refurbish it for possible application of carbon capture and storage(CCS). Conceptual design of the plant includes basic considerations on the national and international situation of energy use, environmental concerns, required budget, and time schedule as well as the engineering concept of the plant. While major equipment of the recently upgraded power plant is going to be reused, a new boiler for air-oxy fired dual mode operation is to be designed. Cryogenic air separation unit is considered for optimized capacity, and combustion system accommodates flue gas recirculation with multiple cleaning and humidity removal units. The flue gas is purified for carbon dioxide separation and treatment. This paper presents the background of the project, participants, and industrial background. Proposed concept of the plant operation is discussed for the possible considerations on the engineering designs.

전륜 인라인 후륜 인휠 모터 적용 전기자동차의 최적 동력 분배 (Optimal Power Distribution for an Electric Vehicle with Front In-line Rear In-wheel Motors)

  • 김정민
    • 한국자동차공학회논문집
    • /
    • 제22권2호
    • /
    • pp.76-82
    • /
    • 2014
  • In this paper, an optimal power distribution algorithm is proposed for the small electric vehicle with front in-line and rear in-wheel motors. First, it is assumed that the vehicle driving torque and velocity are given conditions. And, an optimal problem is defined that finding the front and rear motor torques which minimizes the battery power. From the above optimization problem, the optimized front-rear motor torque distribution map is obtained. And, the vehicle simulations are performed to verify the performance of the optimal power distribution algorithm which is proposed in this study. The simulations are performed based on the federal urban driving schedule for two cases which are constant ratio power distribution, and optimal power distribution. From the simulation results, it is found that the optimal power distribution shows the 6.3% smaller battery energy consumption than the constant ratio power distribution.

대형 복합 시스템 개발을 위한 효과적인 시스템공학 관리계획 개발 프로세스 (Development Process of Systems Engineering Management Plan (SEMP) for targe-Scale Complex System Programs)

  • 유일상;이중윤;박종선;박영원;황희수;정흥채
    • 제어로봇시스템학회:학술대회논문집
    • /
    • 제어로봇시스템학회 2000년도 제15차 학술회의논문집
    • /
    • pp.416-416
    • /
    • 2000
  • The Systems Engineering, as a methodology for engineering and management of today's ever-growing complex system, is a comprehensive and iterative problem-solving process. The process centers on the analysis and management of the stakeholders'needs throughout the entire Life-cycle of a system and searches for an optimized system architecture. There are many essential needs and requirements to be met when a system development task is carried out. Systems Engineering Management PLan(SEMP), as a specification for system development process, must be established to satisfy constraints and requirements of stakeholders successfully and to prevent cost overrun and schedule delay. The paper suggests a systematic SEMP development process and demonstrates a data model and schema for computer-aided systems engineering software, RDD-100, for use in the development and management of SEMP These are being applied to the systems engineering technology development task for the next-generation high-speed railway systems in progress.

  • PDF

EXCEL VBA를 이용한 중소제조업체용 간이형 MES 구축 (A Simplified MES Implementation for Small-sized Manufacturing Industries with EXCEL VBA)

  • 박정현;요시다 아쯔노리
    • 산업공학
    • /
    • 제22권4호
    • /
    • pp.302-311
    • /
    • 2009
  • It's very important to make an effective and optimized production schedule for the small-to-medium-sized factory which have high-variety low-volume manufacturing properties. And now people say that MES is very useful to make scheduling more effectively. But for small-to-medium-sized factory, it is very difficult to build MES system because of fewer infrastructures in the factory, and more to keep it's continuous maintenance and improvement. Therefore it is more important to systematize the production scheduling generation using simpler and easier tools like EXCEL sheet. And it will be needed a new method to make simple MES construction for more efficient production scheduling. This paper proposes the method which can build simple MES easily using a tool of EXCEL VBA for a small-to-medium-sized factory, and introduces an applied case by the proposed method and EXCEL VBA.

A Study on the Nurse Scheduling Optimization Model for Nurse Needs-Type Scheduling Automation System

  • Song, Mi-Young
    • 한국컴퓨터정보학회논문지
    • /
    • 제25권3호
    • /
    • pp.57-64
    • /
    • 2020
  • 오늘날 정보 기술의 발전으로 병원은 의료분야에서 모바일 컴퓨팅 기술을 접목하여 의료 정보의 방대한 데이터를 관리를 위해서 시간과 공간의 제약을 받지 않는 병원정보시스템을 활발하게 연구하고 있다. 그럼에도 불구하고 대부분의 병원에서는 여전히 수작업으로 근무 편성표를 작성하는데 많은 노력과 시간을 소요하고 있다. 이에 본 논문은 간호사의 교대 근무를 편성하는 최적화 모델을 연구하고 이를 적용한 간호사 니즈형 근무 편성 자동화 시스템을 구축하였다. 실제 S병원에 근무하는 간호사를 대상으로 간호사의 정보 데이터와 요구조건 및 제약조건들을 구성하였다. 이를 적용하여 최적화된 스케줄링 처리 방법을 제안하였고 웹 서버를 중심으로 실시간 상호 교환 및 공유가 가능하기 위해서 수간호사가 사용하는 웹 기반 플랫폼과 일반 간호사가 사용하는 모바일 앱 플랫폼을 구축하였다. 따라서 개발된 간호사 니즈형 근무 편성 자동화 시스템을 통해서 수간호사는 매월 간호사의 근무 편성을 위한 업무 편리성을 증가시켜 주며, 간호사는 개인 일정관리를 통해서 좀 더 정확하게 업무를 처리할 수 있도록 도움을 줄 것이다. 또한 간호사간의 근무 일정의 공유하여 업무의 효율성이 증가할 것으로 기대한다.

위성 우주인증 테일러링을 위한 해외 시험표준서 분석 (Test Standards Analyses for Tailoring of Satellite Space Qualification)

  • 송수아;장영근
    • 항공우주시스템공학회지
    • /
    • 제12권4호
    • /
    • pp.35-48
    • /
    • 2018
  • 일반적으로 우주인증은 높은 수준의 스크리닝을 수행하여 소자, 재료 및 제작공정, 부품, 서브시스템 또는 시스템 설계에 대한 마진을 확인한다. 기존의 미국 군, 미 항공우주국(NASA) 그리고 유럽우주기구(ESA) 시험표준서의 우주인증은 보수적 요구조건에 기인해 일정과 비용 측면에서 과도한 경우가 많다. 따라서 국내위성 개발을 위해 독자적인 비용 및 일정 최적화된 우주인증지침서가 필요하다. 본 논문에서는 이러한 우주인증 가이드라인 개발을 위한 기초 연구로서 해외 군 및 우주기구 시험표준서의 우주인증 항목을 비교 분석하였다. 이를 통해 테일러링(tailoring)된 독자적 우주인증 가이드라인을 구축하기 위한 데이터베이스로 사용하고자 한다.