• 제목/요약/키워드: Optimal warranty period

검색결과 40건 처리시간 0.019초

The Software Reliability Growth Models for Software Life-Cycle Based on NHPP

  • Nam, Kyung-H.;Kim, Do-Hoon
    • 응용통계연구
    • /
    • 제23권3호
    • /
    • pp.573-584
    • /
    • 2010
  • This paper considers the differences in the software execution environments in the testing phase and the operational phase to determine the optimal release time and warranty period of software systems. We formulate equations for the total expected software cost until the end of the software life cycle based on the NHPP. In addition, we derive the optimal release time that minimizes the total expected software cost for an imperfect debugging software reliability model. Finally, we analyze the sensitivity of the optimal testing and maintenance design related to variation of the cost model parameters based on the fault data observed in the actual testing process, and discuss the quantitative properties of the proposed model.

비재생보증이 종료된 이후의 확률적 보전효과를 갖는 예방보전정책 (PM Policy with Random Maintenance Quality Following the Expiration of Non-Renewing Warranty)

  • 정기문
    • Communications for Statistical Applications and Methods
    • /
    • 제15권1호
    • /
    • pp.77-86
    • /
    • 2008
  • 본 논문에서는 비재생보증이 종료된 이후의 최적의 주기적인 예방보전정책을 제안한다. 비재생보증기간이 종료된 이후의 예방보전에 대하여 Wu와 Clements-Croome (2005)의 확률적 보전효과를 갖는 주기적인 예방보전모형을 가정한다. 시스템의 운영 기간 동안 사용자가 지불하여 야 할 비용들이 주어져 있을 때 단위시간당 기대비용을 결정한다. 또한, 구해진 단위시간당 기대비용을 최소화하는 최적의 예방보전 주기와 횟수를 결정하는 방법을 다룬다. 마지막으로 본 논문에서 제안된 예방보전정책을 설명하기 위해서 수치적 예를 살펴본다.

비재생무료교체-수리보증이 종료된 이후의 예방보전모형 (Preventive maintenance model following the expiration of NFRRW)

  • 정기문
    • Journal of the Korean Data and Information Science Society
    • /
    • 제22권4호
    • /
    • pp.775-784
    • /
    • 2011
  • 본 논문에서는 비재생무료교체-수리보증이 종료된 이후의 수리가 가능한 시스템에 대한 주기적인 예방보전모형을 고려한다. 이러한 예방보전모형에 대하여 기대순환길이, 총기대비용 그리고 단위시간당 기대비용을 각각 유도하고자 한다. 또한 유도된 단위시간당 기대비용을 최소화하는 최적의 예방 보전주기와 예방보전횟수를 결정하는 방법에 대하여 자세히 설명한다. 끝으로 고장시간이 와이블분포를 따르는 경우에 최적의 주기적 예방보전정책을 결정하여 본다.

주기적인 유지보수 계획에 따른 중고제품에 대한 최적 향상수준 (Optimization of Improvement Level for Second-Hand Product with Periodic Maintenance Schedule)

  • 김대경;김진우;박동호
    • 응용통계연구
    • /
    • 제26권1호
    • /
    • pp.151-162
    • /
    • 2013
  • 중고제품 특히 고가인 중고품에 대한 점증하는 수요로 인하여 그러한 제품에 대한 보증과 보전정책이 최근 제품의 신뢰성을 향상시키기 위해 연구되고 있다. 이 논문에서는 사용한 년 수 x에서 고객에 의해서 구입된 중고제품에 대한 주기적인 유지보수모형을 연구하였다. 구입할 때 판매자는 제품의 고장율을 줄이기 위해서 그리고 각각의 유지보수가 수행되고 난 이후에 신뢰성을 향상시키기 위해서 정해진 보증기간을 제공한다. 만일 연속적인 유지보수 사이에서 고장이 일어난다면 단지 최소수리가 행해진다. 보증정책에 대해서 보증기간동안에 주기적인 유지보수 점검과 더불어 각 고장에 관해서는 무상 비재생수리를 한다. 따라서 이러한 보증정책 하에서 보증기간에 일어난 모든 유지보수와 수리비용은 판매자에게 부과된다. 제안된 주기적인 유비보수 계획에 대해서 보증기간 동안에 판매자에게 부과된 기대 총비용을 계산하기 위한 모형과 판매자의 측면에서 총기대보증비용을 최소화하기 위한 각 유지보수에서 고장율의 최적향상수준을 유도한다. 또한 제안된 방법들에 근거해서 최적향상수준에 대한 수치적인 결과를 제시한다.

무료수리보증이 종료된 이후의 두 예방보전정책 (Two PM policies following the expiration of free-repair warranty)

  • 정기문
    • Journal of the Korean Data and Information Science Society
    • /
    • 제20권6호
    • /
    • pp.999-1007
    • /
    • 2009
  • 본 논문에서는 무료수리보증이 종료된 이후의 최적의 주기적 예방보전정책을 고려한다. 이를 위해서 Wu와 Clements-Croome (2005) 그리고 Jung (2006b)이 제안한 확률적 보전효과를 갖는 두 종류의 예방보전모형을 가정하고자 한다. 이 때, 시스템이 가동되는 동안에 사용자가 지불해야 할 비용이 주어져 있을 때, 단위시간당 기대비용을 유도한다. 그리고 이렇게 구해진 단위시간당 기대비용을 최소화하는 최적의 예방보전 횟수와 예방보전 주기를 결정한다. 끝으로 수치적 예를 통해서 제안된 예방보전정책을 자세히 설명한다.

  • PDF

비 재생무료교체-수리보증이 종료된 이후의 교체모형 (Replacement Model Following the Expiration of NFRRW)

  • 정기문
    • 응용통계연구
    • /
    • 제23권6호
    • /
    • pp.1147-1156
    • /
    • 2010
  • 본 논문에서는 비 재생무료교체-수리보증이 종료된 이후의 수리가 가능한 시스템에 대한 교체정책을 제안한다. 이를 위해서, 비 재생무료교체-수리보증을 정의하고, 사용자 측면에서 비 재생무료교체-수리보증이 종료된 이후의 보전모형이 고려된다. 최적의 보전정책을 결정하기 위한 기준으로는 사용자 측면의 단위시간당 기대비용이 고려되고, 보증 기간이 종료된 이후에 발생되는 시스템의 유지비용은 사용자가 모두 지불하게 된다. 즉, 시스템의 운영기간 동안 사용자가 지불하여야 할 비용들이 주어져 있을 때, 비 재생무료교체-수리보증이 종료된 이후의 최적의 보전주기를 결정한다. 마지막으로 본 논문에서 제안된 보존정책을 설명하기 위해서 수치적 예를 살펴본다.

Cost optimization for periodic PM policy

  • Jung, Ki-Mun
    • 한국통계학회:학술대회논문집
    • /
    • 한국통계학회 2005년도 추계 학술발표회 논문집
    • /
    • pp.73-78
    • /
    • 2005
  • This paper considers a preventive maintenance policy following the expiration of renewing warranty, Most preventive maintenance models assume that each PM costs a fixed predetermined amount regardless of the effectiveness of each PM. However, it seems more reasonable to assume that the PM cost depends on the degree of effectiveness of the PM activity. In this paper we consider a periodic preventive maintenance policy following the expiration of renewing warranty when the PM cost is an increasing function of the PM effect. The optimal number and period for the periodic PM policy with effect dependent cost that minimize the expected cost rate per unit time over an infinite time span are obtained.

  • PDF

소프트웨어 최적출하정책의 베이지안 접근방법 (A Bayesian Approach to Software Optima I Re lease Policy)

  • 김희수;이애경
    • 한국신뢰성학회:학술대회논문집
    • /
    • 한국신뢰성학회 2002년도 정기학술대회
    • /
    • pp.273-273
    • /
    • 2002
  • In this paper, we investigate a software release policy with software reliability growth factor during the warranty period by assuming that the software reliability growth is assumed to occur after the testing phase with probability p and the software reliability growth is not assumed to occur after the testing phase with probability 1-p. The optimal release policy to minimize the expected total software cost is discussed. Numerical examples are shown to illustrate the results of the optimal policy. And we consider a Bayesian decision theoretic approach to determine an optimal software release policy. This approach enables us to update our uncertainty when determining optimal software release time, When the failure time is Weibull distribution with uncertain parameters, a bayesian approach is established. Finally, numerical examples are presented for illustrative propose.

  • PDF

제품의 사용자 관점에서의 품질비용 모델 (Quality Cost Model for a Product in the User's Viewpoint)

  • 이상용
    • 품질경영학회지
    • /
    • 제19권2호
    • /
    • pp.158-165
    • /
    • 1991
  • The Q-cost has been used in the manufacturing company to decide the optimal level of company's product quality, and to evaluate the effect of company's quality control system since the advent of Q-cost theory. In spite of the following costs are generated in the user side, owing to an unsuitable level of product quality and inadequacy of company's quality control system, these costs are not usually included in the company's Q-cost : (1) the cost generated in relation to a claim proposal as traffic expeneses and transpotation of the product. (2) the cost of maintenance through the useful life of the product, especially accured after quality warranty period. (3) the cost related to the economical efficiency in using the product. (4) the cost ralated to a customer dissatisfaction for the product quality. In this point of view, the contents of user side Q-cost, and the relations between the user side Q-cost and the level of company's product quality are discussed. And then the importance of user side Q-cost in order to determine the optimal quality level is discussed.

  • PDF

성능보증제도를 적용한 일반국도 유지보수공사 시범사업 (Case Studies of a Performance-Based Contract for National Highway Pavement Maintenance)

  • 임재규;김용주;김명일;이재준
    • 한국도로학회논문집
    • /
    • 제20권1호
    • /
    • pp.1-8
    • /
    • 2018
  • PURPOSES : Case studies of an asphalt-overlay project with a performance-based contract method were conducted on a national highway in Korea to evaluate the effect of the method on asphalt pavement maintenance. This study evaluated the procedure of the performance-based contract method. METHODS : In this study, an asphalt-pavement maintenance project for a national highway was assessed with a performance-based contract to investigate the advantage of the new contract procedures. This is the first trial applying the performance-based contract to a pavement-rehabilitation project in Korea. In the four case studies, the warranty period of the performance-based contract was designed for seven years. The research team monitored the construction site to compare the normal contract method with the performance-based contract method. The case studies' project sites were investigated after the end of the construction. RESULTS : Based on the limited case studies, the performance-based contract method could extend the service life of the asphalt pavement and reduce the pavement-maintenance budget because the quality control was well managed by the contractors. However, a few construction laws would be necessary to apply the performance-based contract method in the future. CONCLUSIONS : Using the performance-based contract, the construction company made great efforts to guarantee the warranty period and to apply the optimal maintenance method, based on the pavement distress condition. The contractor and the agency would need to understand the new performance-based contract system for it to be activated. Therefore, a proper education program for the performance-based contract system would be needed to educate the stakeholders regarding the procedures and their effects on the pavement management and maintenance.