• Title/Summary/Keyword: Optimal replacement

Search Result 386, Processing Time 0.024 seconds

A Preventive Replacement Model for Standby Systems (대기구조를 갖는 시스템의 예방 교체 모형)

  • Lee, Hyo-Seong
    • Journal of Korean Institute of Industrial Engineers
    • /
    • v.21 no.4
    • /
    • pp.555-570
    • /
    • 1995
  • We consider a preventive replacement policy for a cold-standby system with N components, in which only one component is in operation at a time. If the component in operation fails, a standby component is immediately switched into operation. If all components fail, the system fails. The system is inspected at random poins in time to determine whether it is to be replaced or not. If the number of failed components at the time of inspection exceeds a threshold value r, the system is replaced. Otherwise the decision is put off until the next inspection point arrives. Under the cost structure which includes a replacement cost, a system down-time cost and a holding cost of the components, we develop an efficient procedure to find the optimal control values N and r, which minimize the expected cost per unit time.

  • PDF

Renal replacement therapy in neonates with an inborn error of metabolism

  • Cho, Heeyeon
    • Clinical and Experimental Pediatrics
    • /
    • v.62 no.2
    • /
    • pp.43-47
    • /
    • 2019
  • Hyperammonemia can be caused by several genetic inborn errors of metabolism including urea cycle defects, organic acidemias, fatty acid oxidation defects, and certain disorders of amino acid metabolism. High levels of ammonia are extremely neurotoxic, leading to astrocyte swelling, brain edema, coma, severe disability, and even death. Thus, emergency treatment for hyperammonemia must be initiated before a precise diagnosis is established. In neonates with hyperammonemia caused by an inborn error of metabolism, a few studies have suggested that peritoneal dialysis, intermittent hemodialysis, and continuous renal replacement therapy (RRT) are effective modalities for decreasing the plasma level of ammonia. In this review, we discuss the current literature related to the use of RRT for treating neonates with hyperammonemia caused by an inborn error of metabolism, including optimal prescriptions, prognosis, and outcomes. We also review the literature on new technologies and instrumentation for RRT in neonates.

Replacement Model Following the Expiration of NFRRW (비 재생무료교체-수리보증이 종료된 이후의 교체모형)

  • Jung, Ki-Mun
    • The Korean Journal of Applied Statistics
    • /
    • v.23 no.6
    • /
    • pp.1147-1156
    • /
    • 2010
  • This paper proposes a replacement policy following the expiration of a non-renewing free replacement-repair Warranty(NFFRW). The non-renewing free replacement-repair warranty is defined and then the maintenance model following the expiration of the NFRRW is studied from the user's point of view. As the criteria to determine the optimality of the maintenance policy, we consider the expected cost rate per unit time from the user's perspective. All maintenance costs of the system incurred after the expiration of the warranty are paid by the user. Given the cost structures during the life cycle of the system, we determine the optimal maintenance period following the expiration of a NFRRW. Finally, the numerical examples are presented for illustrative purposes.

Sensitivity Analysis of Pipeline Rehabilitation Model According to Initial Year Break Rate and Growth Rate Coefficient (초기파손율과 성장계수에 따른 상수관 개량모델의 민감도 분석)

  • Chung, Won-Sik;Kim, I-Tae
    • Proceedings of the Korea Water Resources Association Conference
    • /
    • 2005.05b
    • /
    • pp.1302-1306
    • /
    • 2005
  • This study has Performed to develop rehabilitation model for determination of optimal rehabilitation time on the Cast Iron Pipes (CIP) with diameter less than 300 mm in water pipeline network and to analysis the sensitivity on the rehabilitation times of developed model. In the result from the application of the field, the renovation time was faster about 10 years than the replacement time. Especially, as the difference between rehabilitation and replacement time on E-CIP was about from 3 to 5 years, and it was thought that the replacement was effective on E-CIP. To sensitivity analysis, the discount rate of coefficient was fixed at 0.08, and the values of initial year break rate(N($t_o$) and growth rate coefficient(A) were adjusted in values of 0.0009, 0.0018, 0.0027, and 0.05, 0.10, 0.15 respectively. When the values of N($t_o$) and A was increased, the results from the time of rehabilitation and replacement was faster It was thought that N($t_o$), 0.018 was reliable values on the applied pipeline through the result of the study. In case of A, the values of A above 0.1 was thought to be Proper.

  • PDF

Mitral Valve Operation Via Extended Transseptal Approach (확장된 경중격 접근방식을 통한 승모판수술)

  • 김학제
    • Journal of Chest Surgery
    • /
    • v.26 no.12
    • /
    • pp.909-914
    • /
    • 1993
  • Complete and optimal visualization of the mitral apparatus is a prerequisite for accurate repair or replacement of the mitral valve. A vertical left atriotomy just posterior to the interatrial groove is the most commonly used approach. However,exposure can be difficult under certain circumstances,such as small left atrium or reoperation. Other approaches have been advocated to deal with this difficult situations. We used an extended transseptal approach in 10 patients and good clinical results and excellent educational effects were obtained. The extended transseptal approach combines two semicircular atrial incisions circumscribing the tricuspid and mitral annuli anteriorly and superiorly,allowing exposure of the mitral valve by deflecting the ventricular side using stay sutures. The right atrium is opened anteriorly along the atrioventricular sulcus. The atrial septum is incised vertically through the fossa ovalis. Right atrial and septal incisions are joined at the superior end of the interatrial septum and extended across the dome of the left atrium to the left atrial appendage. The mitral valve was replaced in all 10 patients. Four of 10 patients had other simultaneous valve procedure: one had aortic valve replacement: 2 underwent tricuspid annuloplasty: 1 had aortic valve replacement and tricuspid annuloplasty. There was no hospital death and complication. Among the 5 patients who had atrial fibrillation preoperatively,4 had atrial fibrillation postoperatively,1 converted to sinus rhythm. The five patients who were in normal sinus rhythm preoperatively remained in sinus rhythm after replacement. A review of our results with this approach confirms the efficacy and safty of this method. So we recommanded this approach for routine mitral valve procedure,especially difficult situations,such as a small left atrium or the redo operation.

  • PDF

Laboratory investigations on the effects of acid attack on concrete containing portland cement partially replaced with ambient-cured alkali-activated binders

  • Ramagiri, Kruthi K.;Patil, Swaraj;Mundra, Harsh;Kar, Arkamitra
    • Advances in concrete construction
    • /
    • v.10 no.3
    • /
    • pp.221-236
    • /
    • 2020
  • To reduce the CO2 emissions associated with the manufacture of portland cement (PC), an efficient alternative like an alkali-activated binder (AAB) is the requirement of the industry. To promote the use of AAB in construction activities, a practically implementable mix proportion is required. Owing to the several raw ingredients of AAB concrete and their associated uncertainties, partial replacement of PC by AAB may be adopted instead of complete replacement as per industrial requirements. Hence, the present study aims to determine an optimal proportion for partial replacement of PC with AAB and recommend a technique for it based on site conditions. Three modes of partial replacement are followed: combining all the dry ingredients for AAB and PC followed by the addition of the requisite liquids (PAM); combining the PC and the AAB concrete in two horizontal layers (PAH); and two vertical layers (PAV). 28-day old specimens are exposed to 10% v/v solutions of HCl, H2SO4, and HNO3 to evaluate changes in mechanical, physical, and microstructural characteristics through compressive strength, corrosion depth, and microscopy. Based on deterioration in strength and integrity, PAH or PAV can be adopted in absence of acid attack, whereas PAM is recommended in presence of acid attack.

Evaluation of Stability of CLC through Strength and Reduction of Drying Shrinkage (강도 및 건조수축 저감을 통한 CLC의 안정성 평가)

  • Lee, Chang-Woo;Hwang, Woo-Jun;Lee, Sang-Soo
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2022.11a
    • /
    • pp.205-206
    • /
    • 2022
  • This study intends to conduct tests on subsidence and drying shrinkage by mixing CaO-CSA expansion materials to ensure the stability of CLC, and to understand its properties. Based on CLC of 0.6, the replacement ratio of CaO-CSA expansion material was conducted at five levels compared to blast furnace slag, and the results are as follows. The replacement of CaO-CSA expansion material at an appropriate level produces ethringhite and potassium hydroxide, and it is believed that the internal voids of CLC and the Tobelmorite interlayer structure are charged to increase the structural stability, leading to an increase in compressive strength and a decrease in the drying shrinkage. However, it is judged that tissue relaxation due to excessive substances in the high replacement ratio affects the stability of CLC. In the future, we will conduct additional experiments on density, absorption rate, flow test, and settlement, and evaluate and analyze the stability of CLC by selecting the optimal replacement ratio of CaO-CSA expansion materials.

  • PDF

Burn-in When Repair Costs Vary With Time

  • Na, Myung-Hwan;Lee, Sangyeol
    • Journal of Korean Society for Quality Management
    • /
    • v.31 no.1
    • /
    • pp.142-147
    • /
    • 2003
  • Burn-in is a widely used method to eliminate the initial failures. Preventive maintenance policy such as block replacement with minimal repair at failure is often used in field operation. In this, paper burn-in and maintenance policy are taken into consideration at the same time. The cost of a minimal repair is assumed to be a non-decreasing function of its age. The problems of determining optimal burn-in times and optimal maintenance policy are considered.

Dynamic Progrmming Application in Determining the Optimal Replacement Time of Equipment (동적계획에 의한 장비최적교체시기 결정)

  • Jeong, Hyeon-Tae
    • Journal of Korean Society for Quality Management
    • /
    • v.14 no.1
    • /
    • pp.61-66
    • /
    • 1986
  • Many papers have suggested various models how to decide an optimal time for replacing equipment. In this study, Dynamic Programming is applied to establish a model of replacing equipment and a new algorithm is developed for computerization to meet the increased number of variables. It is possible to predict the real situation with higher accuracy by employing the proposed model including more variables such as planning horizon, original cost, salvage value, decreasing rate, operating and maintenance costs, increasing rate, and so on.

  • PDF

Burn-in When Minimal Repair Costs Vary With Time

  • Na, Myung-Hwan;Lee, Sang-Yeol
    • Proceedings of the Korean Statistical Society Conference
    • /
    • 2002.11a
    • /
    • pp.147-151
    • /
    • 2002
  • Burn-in is a widely used method to eliminate initial failures. Preventive maintenance policy such as block replacement with minimal repair at failure is often used in field operation. In this paper burn-in and maintenance policy are taken into consideration at the same time. The cost of a minimal repair is assumed to be a non-decreasing function of its age. The problems of determining optimal burn-in times and optimal maintenance policy are considered.

  • PDF