• Title/Summary/Keyword: Operating unit

Search Result 1,247, Processing Time 0.024 seconds

Radiological Impact on Decommissioning Workers of Operating Multi-unit NPP (다수호기 원전 운영에 따른 원전 해체 작업자에 대한 방사선학적 영향)

  • Lee, Eun-hee;Kim, Chang-Lak
    • Journal of Nuclear Fuel Cycle and Waste Technology(JNFCWT)
    • /
    • v.17 no.1
    • /
    • pp.107-120
    • /
    • 2019
  • The decommissioning of one nuclear power plant in a multi-unit nuclear power plant (multi-unit NPP) site may pose radiation exposure risk to decommissioning workers. Thus, it is essentially required to evaluate the exposure dose of decommissioning workers of operating multi-unit NPPs nearby. The ENDOS program is a dose evaluation code developed by the Korea Atomic Energy Research Institute (KAERI). As two sub-programs of ENDOS, ENDOS-ATM to anticipate atmospheric transport and ENDOS-G to calculate exposure dose by gaseous radioactive effluents are used in this study. As a result, the annual maximum individual dose for decommissioning workers is estimated to be $2.31{\times}10^{-3}mSv{\cdot}y^{-1}$, which is insignificant compared with the effective dose limit of $1mSv{\cdot}y^{-1}$ for the public. Although it is revealed that the exposure dose of operating multi-unit NPPs does not result in a significant impact on decommissioning workers, closer examination of the effect of additional exposure due to actual demolition work is required. The calculation method of this study is expected to be utilized in the future for planned decommissioning projects in Korea. Because domestic NPPs are located in multi-unit sites, similar situations may occur.

Multi-unit Level 2 probabilistic safety assessment: Approaches and their application to a six-unit nuclear power plant site

  • Cho, Jaehyun;Han, Sang Hoon;Kim, Dong-San;Lim, Ho-Gon
    • Nuclear Engineering and Technology
    • /
    • v.50 no.8
    • /
    • pp.1234-1245
    • /
    • 2018
  • The risk of multi-unit nuclear power plants (NPPs) at a site has received considerable critical attention recently. However, current probabilistic safety assessment (PSA) procedures and computer code do not support multi-unit PSA because the traditional PSA structure is mostly used for the quantification of single-unit NPP risk. In this study, the main purpose is to develop a multi-unit Level 2 PSA method and apply it to full-power operating six-unit OPR1000. Multi-unit Level 2 PSA method consists of three steps: (1) development of single-unit Level 2 PSA; (2) extracting the mapping data from plant damage state to source term category; and (3) combining multi-unit Level 1 PSA results and mapping fractions. By applying developed multi-unit Level 2 PSA method into six-unit OPR1000, site containment failure probabilities in case of loss of ultimate heat sink, loss of off-site power, tsunami, and seismic event were quantified.

Cost Analysis Model with Minimal Repair of New Unit Repair Policy under Periodic Maintenance Policy (정기보전 제도에서 응급수리를 고려한 신제품 수리정책에서의 비용분석 모델)

  • Kim, Jae-Joong
    • Journal of Applied Reliability
    • /
    • v.6 no.3
    • /
    • pp.195-203
    • /
    • 2006
  • This paper deals with cost analysis model in periodic maintenance policy. The repair policy with minimal repair is considered as follow : as the occurrence of failure between minimal repair and periodic interval time, unit is replaced by a new unit before the periodic maintenance time comes. Then total expected cost per unit time is calculated according to time delta t in a view of customer's. The total expected costs are included repair and usage cost : operating, fixed, minimal repair, periodic maintenance and new unit expected cost. Numerical example is shown in which failure time of item has Normal distribution.

  • PDF

Analysis on Heating Effects of the Vertical Type Geothermal Heat Pump System

  • Kang, Youn Ku;Ryou, Young Sun;Jang, Jae Kyung;Kim, Young Hwa
    • Journal of Biosystems Engineering
    • /
    • v.39 no.2
    • /
    • pp.69-75
    • /
    • 2014
  • Purpose: This paper is aimed at analyzing the heating performance of the vertical closed loop type Geothermal Heat Pump System (GHPS) distributing the farm site and providing basic data of the GHPS. Method: Seedling greenhouse heating was made from October 2012 to May 2013. The seedling greenhouse was divided into 4 sectors (A, B, C and D zone, total $3,300m^2$) with different temperatures. It was heated from 5PM to 8AM, and during the night the greenhouse was covered by non-woven fabric thermal curtains along the upper 2m of the greenhouse for temperature maintenance. In order to analyze the heating performance of the GHPS, power consumption and operating time of the GHPS, inlet and outlet water temperature of the condenser, temperatures of each zone of the greenhouse, and ambient temperature were measured. Results: When operating only one heat pump unit, heat generated in the condenser decreased as the experiment progressed and power consumption increased correspondingly. However, the heating coefficient of performance decreased from 3.3 to 2.0 rapidly. Also, when operating two heat pump units, heat generated in the condenser decreased and power consumption increased. Heating coefficient of performance decreased from 4.5 to 3.7 rapidly. When the set temperature of the greenhouse was $13.7{\sim}20.1^{\circ}C$ and minimum ambient temperature was $-20.8{\sim}4.8^{\circ}C$, the annually accumulated heat and power consumption were 520,623 kW, 142,304 kW, respectively. Conclusion: When the set temperature of the greenhouse was $13.7{\sim}20.1^{\circ}C$ and the minimum ambient temperature was $20.8{\sim}4.8^{\circ}C$, the annually accumulated heat and power consumption were 520,623 kW, 142,304 kW, respectively. When operating only one heat pump unit, the heating COP was 2.0~3.3, and when operating 2 heat pump units, it was 3.7~4.5. If several heat pumps are installed in one GHPS, it is suggested that all heat pumps be operated except in special cases. Because the scale of the water pumps are set to the scale of when all heat pump units are operating, if even one unit is not operating, the power consumption will increase. That becomes the cause of COP decrease.

COD, Ni and P Removal Characteristics for Plating Wastewater According to Different NaOCl Reaction Times in BPC Unit Process (도금폐수처리공정 중 BPC 단위공정 내 NaOCl 반응시간에 따른 도금폐수의 COD, Ni 및 P 제거특성)

  • Jung, Byung-Gil;Lee, Seung-Won;Yun, Kwon-Gam;Choi, Young-Ik
    • Journal of Environmental Science International
    • /
    • v.30 no.1
    • /
    • pp.69-76
    • /
    • 2021
  • The purposes of this study were to evaluate the removal characteristics of COD, Ni, and P and to derive appropriate operating conditions for the plating wastewater according to NaOCl reaction time and pH operating conditions in the BPC unit process during the plating wastewater treatment process. As a results of evaluating the removal characteristics for raw wastewater by each BPC unit process, the removal efficiencies of COD, Ni and P in BPC 1-1 unit process were 72.8%, 99.1%, and 100.0%. Therefore, the proper reaction time of NaOCl was derived as 21.1 minutes. In order to maintain the +800 mV ORP and the reaction time of 20 minutes, the temporary injection and continuous injection of NaOCl in the BPC unit process were 13.7 mL and 18.7 mL, respectively. It was found that the temporary injection method of NaOCl reduced the chemical cost by 36.5% compared to the continuous injection method. Also, Ni showed the highest removal efficiency of 97.8% at pH 10.5. On the other hand, P showed a removal efficiency of 57.4% at pH 10.0.

Selection and Analysis of Operating Parameters for Condition Monitoring of Emergency Diesel Generator at Nuclear Power Plant (원자력발전소 비상디젤발전기 상태감시를 위한 운전인자 선정에 관한 연구)

  • Park, J.H.;Choi, K.H.;Lee, S.G.;Park, J.E.
    • Journal of Power System Engineering
    • /
    • v.11 no.3
    • /
    • pp.3-8
    • /
    • 2007
  • The emergency AC power supply system of the nuclear power plant is designed to supply the power to the nuclear reactor at the emergency operating condition. The safety function of the diesel generator at the nuclear power plant is to supply AC electric power to the plant safety system whenever the preferred AC power supply is unavailable. The reliable operation of onsite emergency diesel generator should be ensured by a conditioning monitoring system designed to maintain and monitor and forecast the reliability level of diesel generator. To do this kind of diesel generator condition monitoring we reviewed several operating factors and history of the wolsong unit 3 diesel generator and selected the proper conditioning monitoring operating factors.

  • PDF

Analysis of Sheath Induced Voltage and CCPU Operating Characteristic in Underground Transmission Cable (지중송전계통에서 시스유기전압 및 CCPU 동작 특성 해석)

  • Jin, Hye-Young;Lee, Jong-Beom;Kim, Young;Cho, Han-Koo
    • Proceedings of the KIEE Conference
    • /
    • 2001.07a
    • /
    • pp.494-496
    • /
    • 2001
  • This paper describes sheath induced voltage and operating characteristic of cable cover protection unit(CCPU) in underground transmission cable. Real cable system operating by 154kV XLPE cable was modelled for simulation. Sheath induced voltage and operating characteristic of CCPU were analyzed. In particular, sheath induced voltage was analyzed in case of individual grounding and common grounding, respectively, and operating characteristics of CCPU were compared each other.

  • PDF

A Study on development and control of a Automatic Feeding system (소물 Feeding을 위한 전용 자동화 기기의 개발)

  • 장종훈
    • Proceedings of the Korean Society of Machine Tool Engineers Conference
    • /
    • 1997.10a
    • /
    • pp.54-58
    • /
    • 1997
  • In this study, study, about Automatic Loader and Unloader system which can directly be used for material handing and tool operating is moving linear transfer system for mainly forming of small electronic unit and other at press line. This system for been installed in a press in order to load and unload a workpiece from a press die. Control method be used Programmable logic control(PLC) unit. other Control equipment of system is Motor drive, Positioning Control and so on. It took data of input from each sensor and send signal of output to actuator by sequence program. We try to Characteristics test of this system has good condition when operating by laser measurement

  • PDF

A study on the Application of a Monitoring System for Gas Insulaterd Switchgear (가스절연개폐장치용 감시시스템 적용에 관한 연구)

  • Kim, Jeong-Bae;Kim, Min-Su;Song, Won-Pyo;Kim, Deok-Su;Jeon, Chan-Seok;Gil, Gyeong-Seok
    • The Transactions of the Korean Institute of Electrical Engineers C
    • /
    • v.51 no.1
    • /
    • pp.22-30
    • /
    • 2002
  • ln this paper, it was reported the developed results of the monitoring unit for 72.5kY GIS which it is one part of the monitoring system for the substation that Korea Railway Company is promoting. In order to monitor the operational status of GIS, four parameters were chosen: the number of times of the circuit breaker switching, tightness of the gas-sealed units (circuit breaker / disconnecting switch / earthing switch), the number of times of the lightning arrestor operating and the leakage current of the lighting arrester. We constructed the monitoring system that can be judged the operating condition of the GIS from the signal of the suitable sensor for the purpose. Therefore, it is possible to on line monitoring for the condition of the GlS without efforts of the Periodic inspection.

Array of SNOSFET Unit Cells for the Nonvolatile EEPROM (비휘방성 EEPROM을 위한 SNOSFET 단위 셀의 어레이)

  • 강창수;이형옥;이상배;서광열
    • Proceedings of the Korean Institute of Electrical and Electronic Material Engineers Conference
    • /
    • 1991.10a
    • /
    • pp.48-51
    • /
    • 1991
  • Short channel Nonvolatile EEPROM memory devices were fabricated to CMOS 1M bit design rule, and reviews the characteristics and applications of SNOSFET. Application of SNOS field effect transistors have been proposed for both logic circuits and nonvolatile memory arrays, and operating characteristics with write and erase were investigated. As a results, memory window size of four terminal devices and two terminal devices was established low conductance stage and high conductance state, which was operated in “1” state and “0”state with write and erase respectively. And the operating characteristics of unit cell in matrix array were investigated with implementing the composition method of four and two terminal nonvolatile memory cells. It was shown that four terminal 2${\times}$2 matrix array was operated bipolar, and two termineal 2${\times}$2 matrix array was operated unipolar.