• Title/Summary/Keyword: On-site DB

Search Result 133, Processing Time 0.028 seconds

Rice Crop Monitoring Using RADARSAT

  • Suchaichit, Waraporn
    • Proceedings of the KSRS Conference
    • /
    • 2003.11a
    • /
    • pp.37-37
    • /
    • 2003
  • Rice is one of the most important crop in the world and is a major export of Thailand. Optical sensors are not useful for rice monitoring, because most cultivated areas are often obscured by cloud during the growing period, especially in South East Asia. Spaceborne Synthetic Aperture Radar (SAR) such as RADARSAT, can see through regardless of weather condition which make it possible to monitor rice growth and to retrieve rice acreage, using the unique temporal signature of rice fields. This paper presents the result of a study of examining the backscatter behavior of rice using multi-temporal RADARSAT dataset. Ground measurements of paddy parameters and water and soil condition were collected. The ground truth information was also used to identify mature rice crops, orchard, road, residence, and aquaculture ponds. Land use class distributions from the RADARSAT image were analyzed. Comparison of the mean DB of each land use class indicated significant differences. Schematic representation of temporal backscatter of rice crop were plotted. Based on the study carried out in Pathum Thani Province test site, the results showed variation of sigma naught from first tillering vegatative phase until ripenning phase. It is suggested that at least, three radar data acquisitions taken at 3 stages of rice growth circle namely; those are at the beginning of rice growth when the field is still covered with water, in the ear differentiation period, and at the beginning of the harvest season, are required for rice monitoring. This pilot project was an experimental one aiming at future operational rice monitoring and potential yield predicttion.

  • PDF

Development of Outage Data Management System to Calculate the Probability for KEPCO Transmission Systems (한전계통의 송전망 고장확률 산정을 위한 상정고장 DB 관리시스텀(ezCas) 개발)

  • Cha S. T.;Jeon D. H.;Kim T. K.;Jeon M. R.;Choo J. B.;Kim J. O.;Lee S .H
    • Proceedings of the KIEE Conference
    • /
    • summer
    • /
    • pp.88-90
    • /
    • 2004
  • Data are a critical utility asset. Collecting correct data on site leads to accurate information. Data, when gathered with foresight & properly formatted, are useful to both existing database and easily transferable to newer, more comprehensive historical outage data. However, when investigating data items options, the task, can be an arduous one, often requiring the efforts of entire committees. This paper firstly discusses the KEPCO's past 10 years of historical outage data which include meterological data, and also by several elements of the National Weather Service, failure rate, outage duration, and probability classification, etc. Then, these collected data are automatically stored in an Outage Data Management System (ODMS), which allows for easy access and display. ODMS has a straight-forward and easy-to-use interface. It lets you to navigate through modules very easily and allows insertion, deletion or editing of data. In particular, this will further provide the KEPCO that not only helps with probabilistic security assessment but also provides a platform for future development of Probability Estimation Program (PEP).

  • PDF

Development of real-time monitoring web BBS and the alerts service using mobile web (실시간 웹 게시판 모니터링 및 모바일웹을 이용한 알람 서비스 개발)

  • Kim, Jong-Keun;Sim, Kun-Ho;Lee, Yo-Seb;Lim, Young-Hwan
    • Journal of Digital Contents Society
    • /
    • v.13 no.1
    • /
    • pp.1-11
    • /
    • 2012
  • The BBS of Web Site is a space of informational communication to share information. At the moment, countless information is shared through various kinds of BBS. The shared information through the Web BBS can be gains to someone and losses to the other. Thus, for a long time, there have been many researches about technologies, which monitor information uploaded to Web BBS in real-time and inform the results to subjects. For BBS monitoring, existing methods have utilized direct approaches to DB or open API. Also, e-mail addresses have been utilized to inform results to subjects. However, there are two main problems for these methods. The one is a problem on closed BBS, which cannot be accessed, and the other is impossibility of supporting real-time alarm to e-mail. Especially, the real-time support for services, such as monitoring, is extremely important, since the main purpose of monitoring is based on the counter action for the result. The mobile Web has a merit to be accessed in anywhere, so that it is quite suitable for services requiring real-time support. However, the real-time support of mobile device has not been utilized enough, because each mobile phone has different standards of contents so that the contents should be pre-created. This paper suggests a technology that overcomes pitfalls of mobile Web while it is out of standard, and shows how the effect can be maximized through services such as monitoring, which requires the real-time support.

A Study on the Stability of Embankment Due to the Construction of Embankment Combined Use Road (제방겸용도로 건설에 따른 제방 안정성 해석에 관한 연구)

  • Kim, Sung-Nam;Lee, Young-Woo
    • International Journal of Highway Engineering
    • /
    • v.10 no.3
    • /
    • pp.109-118
    • /
    • 2008
  • This study analyzes the change of stability of embankment due to the construction of embankment combined used road with two different construction phases. The stabilities have been checked both in the phase of earth banking for a road construction and in the phase of the application of the traffic roads(DB-24). In both cases the factor of safety has been found higher than 1.3 which is the general criterion of the safety of an embankment. The results indicate that the safety of an embankment due to the construction of embankment combined use road is assured, and thus, it is thought that the construction of embankment combined use road can be considered for cutting down on expenses of construction sites for a road construction. However, the pre-examination of stability due to the construction should be carried out because it decreases the factor of safety of an embankment. From this study, it has been found that the factor of safety was dropped most when the water level rose in the transient flow. The result indicates that the stability analysis of a river embankment where the water level changes frequently should be carried out in the condition of transient flow. It is recommended that the inner side of an embankment should have a slope of 1:2 which is identical with the slope of the existing embankment. In addition, the factor of safety also can be decreased due to the traffic loads, and therefore, the effect should also be considered after the construction of embankment combined used road limiting the traffic loads.

  • PDF

Development of Fire Engine Travel Time Estimation Model for Securing Golden Time (골든타임 확보를 위한 소방차 통행시간 예측모형 개발)

  • Jang, Ki-hun;Cho, Seong-Beom;Cho, Yong-Sung;Son, Seung-neo
    • The Journal of The Korea Institute of Intelligent Transport Systems
    • /
    • v.19 no.6
    • /
    • pp.1-13
    • /
    • 2020
  • In the event of fire, it is necessary to put out the fire within a golden time to minimize personal and property damages. To this end, it is necessary for fire engines to arrive at the site quickly. This study established a fire engine travel time estimation model to secure the golden time by identifying road and environmental factors that influence fire engine travel time in the case of fire by examining data on fire occurrence with GIS DB. The study model for the estimation of fire engine travel time (model 1) covers variables by applying correlation analysis and regression analysis with dummy variables and predicts travel time for different types of places where fire may occur (models 2, 3, 4). Analysis results showed that 17 siginificant independent variables are derived in model 1 and the fire engine travel time differs depending on the types of places where fire occurs. Key variables(travel distance, number of lane, type of road) that are included commonly in the 4 models were identified. Variables identified in this study can be utilized as indicators for research related to travel time of emergency vehicles and contribute to securing the golden time for emergency vehicles.

Efficient Management of Tunnel Construction Informations using ITIS(Intelligent Tunnelling Information System) (ITIS를 활용한 효율적인 터널 정보화 시공 관리)

  • Kim, Chang-Yong;Hong, Sung-Wan;Bae, Gyu-Jin;Kim, Kwang-Teom;Son, Moo-Rak;Han, Byeong-Hyeon
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2004.03b
    • /
    • pp.946-951
    • /
    • 2004
  • ITIS is applied to the several tunnel construction sites in Korea. Tunnel construction properties which are acquired from these sites are transferred to information management server(SQL 2000 server)by client application program in real time. Access permission to DB server depends on the user's roles. Some functions which cannot be embodied in SQL Server are serviced through XML and GMS server is used for spatial data based on GIS part. This system is supposed to give engineers the advantages which are not only easy handling of the program and computerized documentation on every information during construction but also analyzing the acquired data in order to predict the structure of ground and rock mass to be excavated later and show the guideline of construction. Neung-Dong tunnel and Mu-Gua express way tunnel are now under construction and with this system they have 3D visualized map of the geology and tunnel geometry and accumulate database of construction information such as tunnel face mapping results, special notes and pictures of construction and 3D monitoring data, all matters on the stability of rock bolts and shotcrete, and so on. Ground settlement prediction program included in ITIS, based on the artificial neural network(ANN) and supported by GIS technology is applying to the subway tunnel. This prediction tool can make it possible to visualize the ground settlement according to the excavation procedures by contouring the calculated result on 3D GIS map and to assess the damage of buildings in the vicinity of construction site caused by ground settlement.

  • PDF

Development of Construction Model of Disease Classification on Clinical Diagnosis in Ophthalmology (임상진단명에 따른 질병분류체계 구축모형 개발 - 안과를 대상으로 -)

  • Suh, Jin-Sook;Shin, Hee-Young;Kee, Chang-Won
    • Quality Improvement in Health Care
    • /
    • v.10 no.2
    • /
    • pp.204-215
    • /
    • 2003
  • Background : ICD-10 Classification, which is used domestically as well as internationally, has limited use in the clinical practice since it is developed for at disease statistics and epidemiology. Therefore, the purposes of this study were to improve the quality of diagnosis by constructing a new disease classification based on the diagnoses doctors currently make in the clinical setting and connecting this classification with OCS and EMR, and to meet the demands of doctors for high quality medical study data in medical research. Methods : The specialists in each ophthalmic subfield collected clinical diagnoses and abbreviations based on the ophthalmology textbooks and confirmed the classifications. Total number of clinical diagnoses collected was totaled 672, for which ideal diagnoses had been selected and a new model of disease classification model in connection with ICD-10 was constructed. The constructed classification of clinical diagnoses consisted of six steps: the first step was the classification by ophthalmic subspecialty field; the second to fifth steps were the detailed classification by each specialty field; the sixth step was the classification by site. Results : After introducing the new disease classification, research on the use and a pre-post comparison was conducted. The result from the research on the use of the clinical diagnoses in inpatient and outpatient care has shown a gradually increasing tendency. From the pre-post comparison of EMR discharge summary diagnoses, the result demonstrated that the diagnosis was stated correctly and in detail. Since the diagnosis was stated correctly, code classification became correct as well, which makes it possible to construct high quality medical DB. Conclusion : This construction of clinical diagnoses provides the medical team with high quality medical information. It is also expected to increase the accuracy and efficiency of service in the department of medical record and department of insurance investigation. In the future, if hospitals wish to construct a classification of clinical diagnosis and a standard proposal of clinical diagnosis is presented by a medical society, the standardization of diagnosis seems to be possible.

  • PDF

A Study of Effective Privacy Protection System on High Concurrent Transaction Database System (동시 트랜잭션이 많은 데이터베이스에서 효과적인 개인정보보호 시스템 연구)

  • Kang, Ji-Won
    • Convergence Security Journal
    • /
    • v.12 no.2
    • /
    • pp.107-113
    • /
    • 2012
  • Recently, according to the establishment of personal information protection Act, the public and private organizations are taking a step to protect personal information rights and interests by employing the technical methods such as the access control mechanism, cryptography, etc. The result of the personal information leakage causes a serious damage for the organization image and also has to face with the responsibility by law. However, applying access control and cryptographic approach on the personal information item for every connection to large database system causes significant performance degradation in a large database system. In this paper, we designed and implemented the light weight system using JVM (Java Virtual Machine) for the Oracle DBMS environment which the concurrent transaction occurs many, thereby the proposed system provides the minimum impact on the system performance and meets the need of personal information protection. The proposed system was validated on the personal information protection system which sits on a 'A' public organization's portal site and personnel information management system.

An Evaluation of Energy Quality for Distributed Powersystem (분산형 발전설비 병열운전 에너지 품질평가)

  • Hur, Kwang-Beom;Park, Jung-Keuk;Yoon, Gi-Gab;Rhim, Sang-Kyu;Choi, In-Kyu
    • Journal of Energy Engineering
    • /
    • v.19 no.1
    • /
    • pp.8-15
    • /
    • 2010
  • As environmental friendly energy system, distributed micro gasturbine is focused on new energy source for overcoming brand new construction area of power generation. This distributed micro gasturbine system has the powerful characteristics as belows; 1) environmental friendly features NOx < 9 ppm, noise < 65 db 2) various fuel flexbility which is used such as natural gas, diesel, low calory new & renewable fuel, kerosene. 3) high specific output power based on small area and is avilable for very easy and compact installation. There are many new installation sites in USA and Japan from 1998. On the other hand the exhisting large power system was constructued by the sea side, this compact power system is now installed by enduser in downtown area and supplying combined heat & power, has the various apllication on-site power generation. In recently, there is the very important issue for new & reliablbe energy development and spreading out. This paper represent as belows for important system characteristics; 1) grid connection modeling 2) system operation characteristics 3) on-site operation result and evaluation output of power quality analysis.

The Application of Geospatial Information Acquisition Technique and Civil-BIM for Site Selection (지형공간정보취득기술과 토목BIM을 활용한 부지선정 연구)

  • Moon, Su-Jung;Pyeon, Mu-Wook;Park, Hong-Gi;Ji, Jang-Hun;Jo, Jun-Ho
    • Journal of the Korean Society of Surveying, Geodesy, Photogrammetry and Cartography
    • /
    • v.28 no.6
    • /
    • pp.579-586
    • /
    • 2010
  • Due to the recent development of measuring technology and 3D programs, it has become possible to obtain various spatial data. This study utilizes the 2-dimensional data and 3-dimensional data extraction technology based on the existing empirical and statistical DB. The data obtained from geospatial data technology are integrated with civil engineering BIM to conduct the modeling of the topography of the target region and select the optimum location condition by using the cut and fill balance of the volume of earth. The target area is the land around Tamjin River, Jangheong-gun, Jeolla-do. The 3-dimensional topology linked with 3-dimensional mapping technology by using the orth-image and aerial LiDAR that uses aerial photo of the target area is visualized with Civil3D of AutoDesk. By using Civil3D program, the Thanks to the recent development of measuring technology and 3D programs, target area is analyzed through visualization and related data can be obtained for analysis. The method of using civil engineering BIM enables to obtain various and accurate information about the target area which is helpful for addressing the issues risen from the existing methodology. In this regard, it aims at searching for the alternatives and provides suggestions to utilize the information.