Efficient Management of Tunnel Construction Informations using ITIS(Intelligent Tunnelling Information System)

ITIS를 활용한 효율적인 터널 정보화 시공 관리

  • 김창용 (한국건설기술연구원 토목연구부) ;
  • 홍성완 (한국건설기술연구원 토목연구부) ;
  • 배규진 (한국건설기술연구원 토목연구부) ;
  • 김광염 (한국건설기술연구원 토목연구부) ;
  • 손무락 (한국건설기술연구원 토목연구부) ;
  • 한병현 (삼성물산 건설부문 토목기술팀)
  • Published : 2004.03.25

Abstract

ITIS is applied to the several tunnel construction sites in Korea. Tunnel construction properties which are acquired from these sites are transferred to information management server(SQL 2000 server)by client application program in real time. Access permission to DB server depends on the user's roles. Some functions which cannot be embodied in SQL Server are serviced through XML and GMS server is used for spatial data based on GIS part. This system is supposed to give engineers the advantages which are not only easy handling of the program and computerized documentation on every information during construction but also analyzing the acquired data in order to predict the structure of ground and rock mass to be excavated later and show the guideline of construction. Neung-Dong tunnel and Mu-Gua express way tunnel are now under construction and with this system they have 3D visualized map of the geology and tunnel geometry and accumulate database of construction information such as tunnel face mapping results, special notes and pictures of construction and 3D monitoring data, all matters on the stability of rock bolts and shotcrete, and so on. Ground settlement prediction program included in ITIS, based on the artificial neural network(ANN) and supported by GIS technology is applying to the subway tunnel. This prediction tool can make it possible to visualize the ground settlement according to the excavation procedures by contouring the calculated result on 3D GIS map and to assess the damage of buildings in the vicinity of construction site caused by ground settlement.

Keywords