• Title/Summary/Keyword: On-site Construction Factory

Search Result 105, Processing Time 0.028 seconds

Productivity Improvement Method of Wall Rebar Work in Apartment House Construction (공동주택 벽 철근 조립 생산성 향상 방안에 관한 연구)

  • Kim, Min-Kyu;Kim, Young-Kil;Kim, Gwang-Hee
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2019.05a
    • /
    • pp.159-160
    • /
    • 2019
  • Reinforced concrete construction is one of the labor intensive construction projects and its productivity is very low. It is necessary to increase the productivity of rebar construction for improving the productivity of construction work. Therefore, in this study, the rebar drawings of apartment buildings are analyzed to prefabricate wall rebar unit shaped mesh in the factory and installing it on site. If the proposed wall rebar unit is applied to apartment construction working time of wall rebar can be reduced by 50% or more.

  • PDF

A Basic Analysis of the Management Factors the Application of Modular Construction Method in Buildings (건축물 모듈러 공법 적용을 위한 단계별 관리요인 기초적 분석)

  • Kim, Sung-Eun;Lee, Shin-Ja;Lim, Hyoung-Chul
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2023.05a
    • /
    • pp.373-374
    • /
    • 2023
  • Modular construction is a cost-effective and time-saving method of building that involves prefabricating modules in a factory and assembling them on-site. However, effective management factors must be considered at each stage of the process to ensure quality and stability. This study analyzes these management factors and proposes systematic ways to manage them, including construction planning, data management, and quality assurance. Proper management can improve construction quality, shorten construction time, and reduce costs. These stage-specific management factors are crucial for the success of modular construction projects, and further research and efforts are needed to promote its widespread use in the construction market.

  • PDF

A Study on the Unit Modular System Process Application Plan (모듈러공법의 국내 적용 활성화 방안에 대한 연구)

  • Kim, Do-Min;Lim, Jae-Bok;Kim, Ju-Hyung;Kim, Jae-Jun
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2012.05a
    • /
    • pp.113-114
    • /
    • 2012
  • The productivity of the construction industry is lower than other industries. Modular system is suggested to enhance the productivity of the construction industry. Modular system is a construction method which installs units manufactured in factory on site. It enables to reduce the duration and improve the quality of the constructions. However, the construction technique applied to modular system has not overcome certain structural problems. To solve the problems and motivate the application of modular system, this study propose the hybrid system which use core to resist a lateral force.

  • PDF

Development of a Korean Modular Housing Construction Scenario (한국형 모듈러 주택 시공의 시나리오 개발)

  • Kim, Kyoon-Tai;Kim, Chang-Han;Lee, Du-Heon;Lee, Young-Ho
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2011.05b
    • /
    • pp.81-83
    • /
    • 2011
  • A modular house is a house that is assembled on-site from modularized units. As such units are manufactured in a factory, the construction period is reduced, resources are recycled, and quality is improved. However, the construction technique applied to conventional modular houses has not overcome certain structural restrictions, as it is currently used to build houses less than 4 stories in height, which means that it lacks economic feasibility. For this reason, this research aims to develop a scenario of a construction method for Korean modular housing that can be applied to urban-type housing higher than 12 stories. This research is expected to provide fundamental data necessary for the future development of a construction method for Korean modular housing.

  • PDF

Analytical Study on I-beam of I-beam Grated Concrete slab (I 형강 격자 상판의 주부재 I형강에 대한 해석적 연구)

  • 박창규;김용곤;정영수
    • Proceedings of the Korea Concrete Institute Conference
    • /
    • 2001.05a
    • /
    • pp.437-442
    • /
    • 2001
  • Recently, there have been increased much concerns about repair and rehabilitation works for aged concrete structures. In particular, it is known that due to repeated overburden vehicle there are significantly increasing number of aged concrete bridge slabs, which are strongly needed to construct and rehabilitate by innovative construction method. The objective of this research is to develop the new construction method of concrete slab in bridge structure, which can contribute to minimize the traffic congestion during the repair and rehabilitation works of aged concrete slab, and can also sufficiently assure the quality through the minimization of in-situ works at the site. I-beams with punch holes, which are substituted instead of main reinforcing steels in concrete slabs, will be manufactured in accordance with the specification in the factory. and will be preassembled into the Panel. After erecting the preassembled panels in the site, concrete will be poured into the slab panel. This research is to investigate physical properties of I-Beam with punch holes itself through static and fatigue test with rational numerical analysis Finally this research is to suggest reformed I-beam through the numerical analysis.

  • PDF

Quantifying Praitical Application for Specialized Course on Temporary Work Safety (가설공사 안전 전문과정 수료후 실무활용도 조사에 관한 연구)

  • 손기상
    • Journal of the Korean Society of Safety
    • /
    • v.14 no.1
    • /
    • pp.116-123
    • /
    • 1999
  • It is generally considered that only questionnares, collected at the time when each course close, have been evaluated & represented for all of the subjects. But all the result of each course can be actually evaluated using only the data taken from how to apply for at the construction site or at the factory, directly, for the period of at least one year, not just short months. This study is to evaluate and quantify the result and analyses using the data from questionnare concerning the level practically applied to each process at construction site. 1st for three(3) months, 2nd for six(6) months, 3rd for nine(9) months, finally 4th for twelve (12) months, one year These questionnares have been distributed for same people four(4) times to find out what to, how to be applied with each subject.

  • PDF

Towards a Transportation Support System for Off-site Construction : Identifying Key Functions and Diagramming Functional Blocks (오프사이트건설(Off-site Construction) 운반 시스템을 위한 핵심기능 도출 및 시스템 기능 전개도 개발)

  • Lee, Gangho;Kim, Minguk;Lee, Chansik;Koo, Choongwan;Kim, Taewan
    • Korean Journal of Construction Engineering and Management
    • /
    • v.22 no.2
    • /
    • pp.21-30
    • /
    • 2021
  • The existing construction industry is classified into industries with low productivity compared to other industries. In order to solve the decline in productivity in the construction industry, the world is focusing on off-site construction (OSC), which is about 40% more productive than existing construction methods. This high productivity is possible because the three stages of production, transport to the site, and site assembly are consistently maintained in a continuous flow. This study conducted a functional survey through literature review, preliminary field survey, questionnaire, and expert interview. The surveyed function were classified into five categories: convenience, flexibility, manageability, communication, and safety, and the functional characteristics of flexibility, manageability, and communication were high. Because of the change according to the construction progress, the production schedule of the factory, and the variety of transportation time required. Finally, A functional block diagram was developed based on the 15 functions corresponding with an average score of 4 or more in the surveyed function score result. If the OSC transport system is established through this study, It can contribute to a successful construction OSC project and increase productivity.

Research Trends in Off-Site Construction Management : Review of Literature at the Operation Level (국외 오프사이트 건설 관리 연구 동향 : 작업 단계 수준에서의 문헌 연구)

  • Jang, JunYoung;Chen, Hao;Lee, Chansik;Kim, TaeWan
    • Korean Journal of Construction Engineering and Management
    • /
    • v.20 no.4
    • /
    • pp.114-125
    • /
    • 2019
  • Off-Site Construction (OSC) is a new construction method based on factory production. OSC (Off-Site Construction) is a new construction method based on factory production. Researches such as OSC-related design and production standardization, transport methods are actively conducted in the U.S., UK and other parts of the world as this new method has an edge over existing methods in terms of productivity, economy and quality. As the emergence of this new area requires reasonable management, an analysis of the scope of construction project management is required accordingly. Therefore, this research analyzed the study trends and relationships at the CM/PM range's "Operation level" to identify areas of study, relationship between studies and deficiencies in current research. This study carried out a comprehensive literature review of the OSC (CM/PM) research by analyzing 94 papers in Operation level as of September 3, 2018, and the analysis results are as follows. (1) Working stage level researches have been increasing rapidly since 2006. (2) Non-volumetric type is contributing most significantly at work stage level. In the building sector, it has been identified that problems such as residential: living, quality issues, non-residential: economic difficulties, factory: productivity problems have been addressed. (4) The Non-volumetric pre-assembly type dealt with the economic feasibility of residential and non-residential buildings, whereas the modular type was studied in regards to assembly quality. (5) From 2006, project management areas (e.g., quality, human resources, risks) have been expanded. It is expected that this research will help find new areas of research for OSC. If the analysis is carried out to the level of the industrial, corporate and project phases in the future, it is deemed that the overall research flow and area of the OSC industry can be identified.

A Study on the Comparison of the Construction Process between the PC Modular Construction Method Using 3D Infill and the Existing Construction Method (3D Infill을 활용한 PC 모듈러공법과 기존공법과의 시공프로세스 비교 연구)

  • Chung, Joon-Soo;Lim, Seok-Ho;Yang, Hyeon-Jeong
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2023.05a
    • /
    • pp.87-88
    • /
    • 2023
  • In accordance with changes in the domestic construction environment, interest in off-site construction methods (factory-manufactured construction methods) including modular construction methods is rapidly increasing. Among various off-site (OSC) construction methods, the front runner is the steel-based box-type modular construction method. Compared to the existing wet construction method, the steel modular construction method is increasing in terms of securing economic feasibility by shortening the construction period and increasing the prefabrication rate. However, due to the recent rise in raw materials and a sharp rise in the exchange rate, the economic feasibility of the wet method is deteriorating compared to the wet method. Therefore, a hybrid between 9-Matrix-based OSC construction methods is considered as a solution, away from the steel-box type combination, and a comparative study of the construction process between each construction method is being conducted. It was analyzed that the PC modular construction method shortened the construction period by 9% compared to the existing steel modular construction method. On the other hand, when comparing the construction period of the Gayang-dong demonstration complex calculated assuming that all modules are applied, it is estimated that there will be a 12% reduction in construction period compared to the steel modular method and a whopping 43% compared to the RC method.

  • PDF

The Composting Techniques for On-site Recycling of Wood Waste (임목폐기물의 현장 재활용을 위한 퇴비화기술)

  • Hur, Young-Jin;Koh, Jeung-Hyun;Joo, Paik;Ahn, Tae-Young
    • Journal of the Korean Society of Environmental Restoration Technology
    • /
    • v.12 no.4
    • /
    • pp.72-80
    • /
    • 2009
  • The main purpose of this study is as follows : Finding a solution for fresh wood chips to be used as an alternative growing-media through a study of the formation method of a compost base that is applicable on both construction site and composting factory to ferment fresh wood chips produced from construction site as well as a study on adjuvant or secondary materials. The result from the experiment plot using wood chips sized 50mm or less, manure and fertilizer mixed manure as a source of nitrogen to compost fresh wood chips has shown that the temperatures 9days and 3days after the beginning of the experiment reached to $49.0^{\circ}C$ and $40.4^{\circ}C$ respectively, the heating duration was 7days and 4days respectively, and the C/N ratio was 26.5 and 25.3, each satisfying the standard for composted manure (25.0~40.0). Also, the other result from another experiment plot using mixture of sandy soil and microorganism as an inoculation source of microorganism has shown that the temperature 10days after the beginning of the experiment reached to $67.6^{\circ}C$ and lasted 16days. The experiment plot using sandy soil has shown the highest figure of $5.3{\sim}108$ CFU/g in terms of number of microorganism. The result from the experiment plots for on-site composting of fresh wood chips have shown that the experiment plot that used sandy soil with fertilizer due to supply restriction of manure as a nitrogen source in construction site reached the high temperature of $54.7^{\circ}C$ after 3days of experiment beginning and maintained heating state for 17days and reached 30.6 of C/N ratio, satisfying the standard for composted manure.