• Title/Summary/Keyword: On-Line Test

Search Result 3,382, Processing Time 0.038 seconds

Analysis and lest of On-line and off-line PD Testing for High Voltage Rotating Machines Stator Windings using Ceramic Coupler (세라믹 커플러를 이용한 고전압회전기 고정자권선의 On-line 및 off-line 부분방전 특성 시험 및 분석)

  • Oh, Bong-Keun;Kim, Hyun-Il;Kang, Seong-Hwa;Lim, Kee-Joe
    • Journal of the Korean Institute of Electrical and Electronic Material Engineers
    • /
    • v.20 no.10
    • /
    • pp.895-900
    • /
    • 2007
  • Partial discharge(PD) test can be performed either when the rotating machine is not operating(off-line) or during normal machine operation(on-line). This paper presents an on-line and off-line PD test on a large hydro-generator and induction motor using the same PD acquisition system(PDAS) and ceramic coupler(CC) sensor. PD signal characteristics of CC sensor proved similar with that of epoxy mica coupler(EMC) sensor as a results of PD test for simulated defect winding and frequency response test. A comparison of on-line and off-line PD test for PD characteristic parameters-phase resolved PD(PRPD), maximum PD value(Qmax) and PD occurrence energy(POE)-indicated that on-line PD test could reliably and effectively diagnose insulation conditions which were verified by off-line PD test.

Tracking Performance Test of Polymer Insulator with Salt Solution which is added Surface Active Agent (계면활성제가 첨가된 염수용액에 따른 폴리머 애자의 트래킹 성능 평가)

  • Cho, Han-Goo;Han, Dong-Hee;Lee, Un-Yong;Lim, Kee-Joe;Choi, In-Hyuk
    • Proceedings of the Korean Institute of Electrical and Electronic Material Engineers Conference
    • /
    • 2004.07b
    • /
    • pp.1121-1124
    • /
    • 2004
  • Aging test to estimate life property of polymer insulator is executed through several international standard such as IEC 61109 and CEA tracking wheel test, but is not getting clear conclusion yet. There are two methods in the diagnosis method of polymer insulator such as off-line and on-line. The diagnosis methods in off-line are external condition analysis by the eye, contaminant analysis on surface, surface analysis, pollution withstand voltage test, power frequency flashover voltage test, lightning impulse flashover test, tensile fracture load test and flexural load test. The diagnosis methods in off-line most are the method for virgin and last aged sample. However, the diagnosis method in on-line is method that can be evaluate sample state as progressing continuously aging test in beginning, The diagnosis method in on-line is arranged as following: leakage current measurement, electric field, surface state investigation, thermal image, emitting light measurement and then so. In this paper, the tracking performance of polymer insulator with salt solution which is added surface active agent. The diagnosis of insulator sample has been analyzed by leakage current and visual examination.

  • PDF

On-line and Off-line Partial Discharge Monitoring System with HVAC Testing (HVAC에 의한 On-line, Off-line PD 모니터링)

  • Choi, Yong-Sung;Lee, Kyung-Sup
    • Proceedings of the Korean Institute of Electrical and Electronic Material Engineers Conference
    • /
    • 2008.04c
    • /
    • pp.111-114
    • /
    • 2008
  • The paper considers the relation between on-line monitoring and diagnostics on the one hand and high-voltage (HV) withstand and partial discharge (PD) on-site testing on the other. HV testing supplies the basic data (fingerprints) for diagnostics. In case of warnings by on-line diagnostic systems, off-line withstand and PD testing delivers the best possible information about defects and enables the classification of the risk. Because alternating voltage (AC) is the most important test voltage, the AC generation on site is considered. Frequency tuned resonant (ACRF) test systems are best adapted to on-site conditions. They can be simply combined with PD measuring equipment. The available ACRF test systems and their application to electric power equipment -from cable systems to power transformers - is described.

  • PDF

Establishment of Railway Test Line - focusing on the needs & plan (철도종합시험선 구축 필요성)

  • Moon, Jae-Woo;Kim, Tae-Wook;Lee, Myung-Suk;Jung, Jang-Yong;Kim, Jong-Tae
    • Proceedings of the KSR Conference
    • /
    • 2008.11b
    • /
    • pp.776-781
    • /
    • 2008
  • In this paper, comments on the needs of establishment of railway test line - capable of mid and long term performance evaluation of vehicle/infra/electricity/signal component/system - are described. Based on the previous studies, national/social/economic needs, the states of similar lines of foreign countries, concept of test line, and basic application plan are summarized. Especially, core things needed to the establishment of test line are commented.

  • PDF

Status of Occupational Therapists on Unilateral Neglect Test Tools Usage and Symptom Classification

  • Jang, Woo-Hyuk
    • The Journal of Korean Physical Therapy
    • /
    • v.29 no.5
    • /
    • pp.271-275
    • /
    • 2017
  • Purpose: The aim of this study was to investigate the current status of the use of neglect test tools and the awareness for egocentric neglect (EN) and allocentric neglect (AN). Methods: A survey questionnaire was distributed to occupational therapists attending continuing education at the Daegu-Gyeongbuk branch on April 16. A total 143 responses were collected, and with the exception of 5 incomplete responses, 138 of them were analyzed. Results: The most commonly used unilateral neglect test tools were the line bisection test (86 responses, 62.3%), cancellation test (35 responses, 25.4%), copy and drawing test (7 responses, 5.1%). In a follow-up survey of 86 respondents who used line bisection tests as the most commonly used test, the majority (82 responses, 95.3%2) were found to use the 20-line test paper. In question about the familiarity and education experience for test manual, only 20 responses (23.2%) and 3 responses (3.5%) answered 'Yes'. In a question about the experience of a manual and the article for the manual, 25 responses (29.1%) answered 'Yes'. In the question regarding the separation of EN and AN on the unilateral neglect test, 44 responses (31.9%) were 'distinction' and 94 responses (68.1%) were 'no distinction'. Conclusion: Information on the guidance and interpretation of the line bisection test is lacking and the concept of EN and AN was insufficient.

Management and operation of K-AGT test line (한국형경량전철 시험선의 관리 및 운영)

  • Han, Seok-Youn;Jun, Bong-Roong;Lee, Ho-Yong;Lee, An-Ho
    • Proceedings of the KSR Conference
    • /
    • 2006.11b
    • /
    • pp.964-967
    • /
    • 2006
  • Korea Railroad Research Institute (the following 'KRRI') built AGT test line in Gyeong San-city, Kyongsang-bukdo province, Korea on August, 2004. This test line is exclusively used for the test of the driverless rubber-tired AGT system, and applied with research result of AGT System Development Project like vehicles, power supply, control and signaling, track and infrastructure system. The test line is available for the test of rubber tired AGT system's performance, function, safety. In this paper, we described the operation system of test line for the test of performance, safety, reliability, and also system operation in emergency. Finally we present the operation result of test line.

  • PDF

A study on advanced EMU's maintenance program on test operation in Dabul line (차세대 전동차 대불선 시운전 시 유지보수방안 연구)

  • Kim, Young-Kyu;Park, Se-Young;Song, Jeong-Hun;An, Cheon-Heon;Lee, Han-Min
    • Proceedings of the KSR Conference
    • /
    • 2010.06a
    • /
    • pp.2215-2222
    • /
    • 2010
  • Advanced EMU have been enhanced in terms of safe transport and maintainability. It is a new urban railway technology that enables an operation institution to cut repair and maintenance costs and customers to use convenient service at lower costs based on IT technology. If a development vehicle of Advanced EMU is completed, it will be used to test the entire advanced EMU system through sufficient performance check and reliability check prior to operation in commercial line. It will also verify efficiency, safety, punctuality and energy efficiency of transport. Accordingly, it is necessary to figure how to repair and maintain vehicles to enhance safety of Advanced EMU system in cooperation with operation during the period of comprehensive evaluation on the operation of a development vehicle in a test line. In this paper, we investigated the maintenance program of Advanced EMU on test operation in Dabul line. The test condition and operation environment of Advanced EMU in Daebul line was analyzed.

  • PDF

On-line Bus Monitoring of a System Using Bondary-Scan (경계스캔 구조를 사용한 시스템의 온라인 버스 모니터링)

  • Song, Dong-Sup;Bae, Sang-Min;Kang, Sung-Ho;Park, Young-Ho
    • The Transactions of the Korean Institute of Electrical Engineers D
    • /
    • v.49 no.12
    • /
    • pp.675-682
    • /
    • 2000
  • When a system is composed of multi-boards, an efficient bus arbitration method for the data transfer bus must be provided for guaranteeing proper operations. In this paper, a new test methodology is developed which is used for testing on-line bus arbitration. In the new test methodology, events that are occurred during bus arbitration are defined, and expected signals during fault-free bus arbitration are compared with the signals captured during on-line bus arbitration using boundary-scan cells. For this, a new test architecture is proposed which is efficient for the maintenance and the repair of multi-board systems. In addition, the new methodology can be used with off-line interconnect test using boundary-scan.

  • PDF

(On-Line Test of High Speed Rail Development) (고속전철기술개발사업의 시운전시험계획)

  • 김석원;최강윤;김기환
    • Proceedings of the KSR Conference
    • /
    • 1999.11a
    • /
    • pp.376-384
    • /
    • 1999
  • In this paper, we introduce the on-line test plan of high speed rail development, which will be carried out at the test section of Seoul-Pusan high speed line from May to October, 2002. The test items are decided focused on the verification of the perofrmace and acquirement of the technical data of the high speed rail system development. The running time and distance of the train are calculated for several limited maximum speed cases. The detailed test scenario shall be developed according to the process of development and design of the system.

  • PDF

Analysis of the acceleration of KHST prototype on the high speed test line (한국형 고속전철의 진동가속도 시험 연구)

  • Park Chankyounn;Kim Youngguk;Kim Seogwon
    • Proceedings of the KSR Conference
    • /
    • 2003.05a
    • /
    • pp.567-573
    • /
    • 2003
  • Korean High Speed Train (KHST) has been tested on high speed line in JungBu site since it was developed in 2002. The data acquisition system was developed to accomplish successfully this on-line test for proving the dynamic Performance of KHST. This system was consist of the personal computers based on National Instrument PXI modules and the test programs based on Labview 6i. This paper shows that this system is efficient to acquire the test data through the multi-channels connected the accelerometers which located in long distance places and flexible to change and add channels for data acquisition. The dynamic analysis of an on-line test is very complicate because the environmental conditions, as examples radius of curve, inclination of the track, tunnels, bridges, and so forth, and running conditions, as examples driving, braking, the number of working motors, and so forth, have an effect on the results. Therefor, the analysis method is important and this paper proposes the efficient procedure graphically, showing the proposed method simplify the accelerations of 5th bogie frame acquired during the on-line test for KHST.

  • PDF