• Title/Summary/Keyword: OSC공법

Search Result 18, Processing Time 0.021 seconds

Derivation of the Construction Process for Precast Concrete System based on Off-Site Construction (OSC(Off-Site Construction)기반 PC공법의 시공 프로세스 도출)

  • Jun, Young-Hun;Bae, Byung-Yun;Yun, Won-Gun
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2021.05a
    • /
    • pp.289-290
    • /
    • 2021
  • The PC system has advantages in terms of project management, such as shortening the construction period and reducing costs. However, it is difficult to activate the technology due to insufficient application of the technology. Therefore, there is a need for a strategy to expand and activate the PC system. This study is a basic research for PC construction project management, and its purpose is to derive the entire construction process from factory production of PC components to on-site construction. In this study, the construction process of the PC system was derived through literature review, and the main matters for the construction process management of PC system were confirmed in the analysis process. In the future, the results of this study are expected to be used as basic data for research for PC project management, such as deriving construction classification and calculating construction periods.

  • PDF

A Study on the Development of Construction Production Rates System for Estimating Proper Construction Expenses of Off-Site Construction (OSC) Based PC Structure Factory-Built Assembly (OSC기반 PC구조 공장제작 적정 공사비 산정을 위한 품셈체계 개발 연구)

  • Lee, Jeongwook;Lee, Hansoo;Lee, Chiho;Noh, Hyunseok
    • Korean Journal of Construction Engineering and Management
    • /
    • v.23 no.6
    • /
    • pp.89-100
    • /
    • 2022
  • The development of the Construction Production Rates System for appropriate construction cost calculation has recently come to the fore as a means of invigorating OSC based PC structure which currently needs institutional frameworks. PC structure based construction expenses consist of the factory-built assembly, transportation and on-site installation. Recently, in the field of transportation and site installation, research on product structure development is being conducted, such as presenting the standard product calculation system reflecting the results of field survey for each subsidiary materials (Lee et al., 2021). On the other hand, there is no ongoing research on estimating construction expenses of Factory-built assembly. This study suggests Construction Production Rates System which can be used for PC subsidiary materials based Factory-built assembly cost estimations. For the research, work types for the construction procedures have been categorized, and the standard input manpower suitable for the corresponding work characteristics has been derived from analyzing the associated Construction Standard Production Rates for each work type. Also, as the research referred PC subsidiary materials (such as columns, beams, walls, and slab, as well as on-site installation) and the standard number of workforce based on work types, one can calculate direct labor cost, using what the research shows. In addition, it suggests that the size of individual subsidiary materials be the extra cost factor, by using the characteristics that productivity changes depending on the size(m3) of subsidiary materials. It is expected that the research can contribute to objectively verifying factory-built assembly cost through of PC structure, which currently relies on estimates.

A Study on the Comparison of the Construction Process between the PC Modular Construction Method Using 3D Infill and the Existing Construction Method (3D Infill을 활용한 PC 모듈러공법과 기존공법과의 시공프로세스 비교 연구)

  • Chung, Joon-Soo;Lim, Seok-Ho;Yang, Hyeon-Jeong
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2023.05a
    • /
    • pp.87-88
    • /
    • 2023
  • In accordance with changes in the domestic construction environment, interest in off-site construction methods (factory-manufactured construction methods) including modular construction methods is rapidly increasing. Among various off-site (OSC) construction methods, the front runner is the steel-based box-type modular construction method. Compared to the existing wet construction method, the steel modular construction method is increasing in terms of securing economic feasibility by shortening the construction period and increasing the prefabrication rate. However, due to the recent rise in raw materials and a sharp rise in the exchange rate, the economic feasibility of the wet method is deteriorating compared to the wet method. Therefore, a hybrid between 9-Matrix-based OSC construction methods is considered as a solution, away from the steel-box type combination, and a comparative study of the construction process between each construction method is being conducted. It was analyzed that the PC modular construction method shortened the construction period by 9% compared to the existing steel modular construction method. On the other hand, when comparing the construction period of the Gayang-dong demonstration complex calculated assuming that all modules are applied, it is estimated that there will be a 12% reduction in construction period compared to the steel modular method and a whopping 43% compared to the RC method.

  • PDF

Research Trends in Off-Site Construction Management : Review of Literature at the Operation Level (국외 오프사이트 건설 관리 연구 동향 : 작업 단계 수준에서의 문헌 연구)

  • Jang, JunYoung;Chen, Hao;Lee, Chansik;Kim, TaeWan
    • Korean Journal of Construction Engineering and Management
    • /
    • v.20 no.4
    • /
    • pp.114-125
    • /
    • 2019
  • Off-Site Construction (OSC) is a new construction method based on factory production. OSC (Off-Site Construction) is a new construction method based on factory production. Researches such as OSC-related design and production standardization, transport methods are actively conducted in the U.S., UK and other parts of the world as this new method has an edge over existing methods in terms of productivity, economy and quality. As the emergence of this new area requires reasonable management, an analysis of the scope of construction project management is required accordingly. Therefore, this research analyzed the study trends and relationships at the CM/PM range's "Operation level" to identify areas of study, relationship between studies and deficiencies in current research. This study carried out a comprehensive literature review of the OSC (CM/PM) research by analyzing 94 papers in Operation level as of September 3, 2018, and the analysis results are as follows. (1) Working stage level researches have been increasing rapidly since 2006. (2) Non-volumetric type is contributing most significantly at work stage level. In the building sector, it has been identified that problems such as residential: living, quality issues, non-residential: economic difficulties, factory: productivity problems have been addressed. (4) The Non-volumetric pre-assembly type dealt with the economic feasibility of residential and non-residential buildings, whereas the modular type was studied in regards to assembly quality. (5) From 2006, project management areas (e.g., quality, human resources, risks) have been expanded. It is expected that this research will help find new areas of research for OSC. If the analysis is carried out to the level of the industrial, corporate and project phases in the future, it is deemed that the overall research flow and area of the OSC industry can be identified.

Slot Die Coating 공법으로 코팅된 PEDOT:PSS Flexible 투명 전극의 특성 연구

  • Go, Eun-Hye;Kim, Hyo-Jung;Lee, Hye-Min;Jo, Da-Yeong;Seo, Gi-Won;Kim, Han-Gi
    • Proceedings of the Korean Vacuum Society Conference
    • /
    • 2014.02a
    • /
    • pp.201.1-201.1
    • /
    • 2014
  • 본 연구에서는 Slot die coating 공법으로 코팅된 Poly (3-4 ethylenedioxythiophene): Poly (styrenesulfonate) (PEDOT:PSS) 박막과 비정질 ITO 박막의 전기적, 광학적, 기계적 특성을 비교 평가하여 Slot die coating 공법으로 코팅된 PEDOT:PSS 박막의 유기태양전지의 전극으로서의 적용가능성을 확인하였다. 상업용 PEDOT:PSS 박막은 보통 280 Ohm/sq.의 면저항과 가시광 영역에서 약 80%의 광투과도를 나타내며, 비정질 ITO 박막과 유사한 전기적, 광학적 특성을 나타내었다. Slot die coating 공법을 통해 제작된 PEDOT:PSS 투명 전극과 비정질 ITO 투명 전극의 기판 휘어짐에 따른 전기적 안정성을 비교 평가하기 위해 25 mm에서 1 mm까지 radius 변화에 따른 저항의 변화를 측정하였다. 그 결과, 비정질 ITO 투명 전극 대비 PEDOT:PSS 투명 전극이 더 우수한 전기적 안정성을 나타냄을 확인하였다. 또한, 다양한 Bending test (Inner/Outer bending, Rolling, Stretching, Twisting) 를 통해 비정질 ITO 투명 전극 보다 Slot die coating 공법으로 코팅된 PEDOT:PSS 투명 전극의 우수한 기계적 특성을 확인하였다. 이를 바탕으로 Flexible 유기태양전지에의 적용 가능성을 알아보기 위해 Slot die coating 공법으로 코팅된 PEDOT:PSS 투명 전극과 비정질 ITO 투명 전극을 유기태양전지의 anode 층에 적용하여 각각 제작하고 그 특성을 평가하였다. 비정질 ITO 투명 박막을 적용한 유기태양전지 대비 Slot die coating 공법으로 코팅된 PEDOT:PSS 투명 박막으로 제작한 유기태양전지에서 더 높은 효율이 나타났으며, 이로써 Slot die coating 공법으로 코팅된 PEDOT:PSS 투명 전극의 Flexible 유기태양전지로써의 적용 가능성을 확인하였다.

  • PDF

Development of Time-Cost Trade-Off Algorithm for JIT System of Prefabricated Girder Bridges (Nodular GIrder) (프리팹 교량 거더 (노듈러 거더)의 적시 시공을 위한 공기-비용 알고리즘 개발)

  • Kim, Dae-Young;Chung, Taewon;Kim, Rang-Gyun
    • Korean Journal of Construction Engineering and Management
    • /
    • v.24 no.3
    • /
    • pp.12-19
    • /
    • 2023
  • In the case of the construction industry, the relationship between process and cost should be appropriately distributed so that the finished product can be delivered at the minimum fee within the construction period. At that time, it should be considered the size of the bridge, the construction method, the environment and production capacity of the factory, and the transport distance. However, due to various reasons that occur during the construction period, problems such as construction delay, construction cost increase, and quality and reliability degradation occur. Therefore, a systematic and scientific construction technique and process management technology are needed to break away from the conventional method. The prefab(Pre-Fabrication) is a representative OSC (Off-Site Construction) method manufactured in a factory and constructed onsite. This study develops a resource and process plan optimization system for the process management of the Nodular girder, a prefab bridge girder. A simulation algorithm develops to automatically test various variables in the personnel equipment mobilization plan to derive the optimal value. And, the algorithm was applied to the Paju-Pocheon Expressway Construction (Section 3) Dohwa 4 Bridge under construction, and the results compare. Based on construction work standard product calculation, actual input manpower, equipment type, and quantity were applied to the Activity Card, and the amount of work by quantity counting, resource planning, and resource requirements was reflected. In the future, we plan to improve the accuracy of the program by applying forecasting techniques including various field data.

A Study on the Consideration for Factors Affecting Production Plan Establishment of Precast Concrete Members (PC부재의 생산계획 수립에 영향을 미치는 요인 고찰에 관한 연구)

  • Jun, Young-Hun;Shin, Eun-Young;Yun, Won-Gun;Kim, Kyong-Hoon
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2023.05a
    • /
    • pp.253-254
    • /
    • 2023
  • The production plan of Precast Concrete members is closely related to the assembly plan of Precast Concrete members, and is an important management factor for the process planning of Precast Concrete construction. This may cause a delay in the construction period due to manufacturing errors occurring in the production process of members and transportation errors according to the production sequence. Therefore, it is necessary to have an efficient production plan for Precast Concrete members that can produce the necessary quantity from the point of assembly of the members and supply them in a timely manner. This study is a basic study for establishing a production plan for Precast Concrete members, and the purpose of the study is to examine the factors that affect the establishment of a production plan for Precast Concrete members. In this study, the influencing factors according to the production method and conditions when establishing a production plan for Precast Concrete members were considered. In the future, correlation analysis among influencing factors will be carried out, and it is expected that it will be used as basic data for schedule management of Precast Concrete construction and derivation of construction period calculation standards.

  • PDF

A Comparative Analysis of Construction Labor Productivity in OECD Countries (OECD 국가의 건설업 노동생산성 비교 및 분석)

  • Park, Hwan-Pyo
    • Journal of the Korea Institute of Building Construction
    • /
    • v.23 no.2
    • /
    • pp.175-185
    • /
    • 2023
  • Upon analyzing labor productivity in the construction industry across OECD countries, it was found that in 2019, labor productivity per employee in the South Korean construction industry was lower than that of major developed countries when adjusted for purchasing power parity(PPP). Specifically, when benchmarked against other countries at a base of 100, South Korea scored 76.9 in the United States, 88.4 in Japan, and 85.1 in the OECD average. Notably, South Korea ranked 25th in labor productivity per employee in the construction industry among 35 OECD countries in 2019, indicating a low standing. A comparative analysis of the construction market size and labor productivity in the construction industry across OECD countries revealed that larger construction markets did not necessarily correlate with higher labor productivity. To enhance labor productivity in the construction industry, this study proposed the active implementation of smart construction technology at construction sites and the promotion of on-site assembly work using off-site construction(OSC) technology, rather than traditional on-site labor. Moreover, it was recommended that the development of modular construction methods and technologies be expanded. In the future, if off-site production methods and modules are further developed through advanced robotics and factory automation, labor productivity is anticipated to increase due to the restructuring of production methods, such as manufacturing.