• Title/Summary/Keyword: Multi Project

Search Result 789, Processing Time 0.027 seconds

A Study on the Improving the Accuracy of Cost Estimating through Analyzing Influence Factors in Apartment (공동주택 공사비 영향요인 분석을 통한 개산견적의 정확성 향상방안 연구)

  • Yun, Ji-Yeong;Jeong, Kyeong-Tae;Lee, Dong-Hoon
    • Journal of the Korea Institute of Building Construction
    • /
    • v.20 no.2
    • /
    • pp.183-190
    • /
    • 2020
  • Currently, the multi-unit houses are the largest in the ratio of housing types, and the number of households in multi-unit houses is steadily increasing. As the multi-family housing project continues, the accuracy of estimates for decision-making and feasibility assessment are required in the early stages of the project. Therefore, this study selected the influential factors affecting the estimated estimate and showed the relative importance of each factor through weight analysis and suggested the method of calculating the estimated estimate to improve the accuracy. The calculation plan presented through this study will be used as a useful data for project feasibility review and is expected to make a great contribution in preventing the economic loss of the client.

ACTIVITY-BASED STRATEGIC WORK PLANNING AND CREW MANAGEMENT IN CONSTRUCTION: UTILIZATION OF CREWS WITH MULTIPLE SKILL LEVELS

  • Sungjoo Hwang;Moonseo Park;Hyun-Soo Lee;SangHyun Lee;Hyunsoo Kim
    • International conference on construction engineering and project management
    • /
    • 2013.01a
    • /
    • pp.359-366
    • /
    • 2013
  • Although many research efforts have been conducted to address the effect of crew members' work skills (e.g., technical and planning skills) on work performance (e.g., work duration and quality) in construction projects, the relationship between skill and performance has generated a great deal of controversy in the field of management (Inkpen and Crossan 1995). This controversy can lead to under- or over-estimations of the overall project schedule, and can make it difficult for project managers to implement appropriate managerial policies for enhancing project performance. To address this issue, the following aspects need to be considered: (a) work performances are determined not only by individual-level work skill but also by the group-level work skill affected by work team members, each member's role, and any working behavior pattern; (b) work planning has significant effects on to what extent work skill enhances performance; and (c) different types of activities in construction require different types of work, skill, and team composition. This research, therefore, develops a system dynamics (SD) model to analyze the effects of both individual-and group-level (i.e., multi-level) skill on performances by utilizing the advantages of SD in capturing a feedback process and state changes, especially in human factors (e.g., attitude, ability, and behavior). The model incorporates: (a) a multi-level skill evolution and relevant behavior development mechanism within a work group; (b) the interaction among work planning, a crew's skill-learning, skill manifestation, and performances; and (c) the different work characteristics of each activity. This model can be utilized to implement appropriate work planning (e.g., work scope and work schedule) and crew management policies (e.g., work team composition and decision of each worker's role) with an awareness of crew's skill and work performance. Understanding the different characteristics of each activity can also support project managers in applying strategic work planning and crew management for a corresponding activity, which may enhance each activity's performance, as well as the overall project performance.

  • PDF

Multi-dimensional Development Type and Plan for Railway Facility Site - Focus on the Gyeongbu Line Railway Multi-Dimensional Project in Busan (철도시설 부지 입체개발 유형 및 개발 방안 - 경부선 철도 입체화 사업을 대상으로 -)

  • Keum, Yun Jeon ;Kim, Jong Gu
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.43 no.4
    • /
    • pp.525-533
    • /
    • 2023
  • Due to the topographical characteristics of Busan, which has many mountainous areas, there is a shortage of available land, and even the Gyeongbu Line railroad crosses the city center, hindering the disconnection of living areas and urban development. Accordingly, the need for multi-dimensional development has been raised to secure land, and recently, interest has been increasing in connecting cities divided by the undergroundization of the Gyeongbu Line railway and making efficient use of land. In this study, the development type was analyzed through the case of multi-dimensional development of land, and the development direction for each three-dimensional development type was set based on the results of the multi-dimensional development of four areas (Sasang Station, Gupo Station, Gaya Station, and Busanjin Station). In addition, reflecting the regional characteristics of the target area and the ongoing urban regeneration project, we will propose a design plan for horizontal and vertical space utilization of the railway site through multi-dimensional development through the efficient land use.

APPLICATION OF MERGED MICROWAVE GEOPHYSICAL OCEAN PRODUCTS TO CLIMATE RESEARCH AND NEAR-REAL-TIME ANALYSIS

  • Wentz, Frank J.;Kim, Seung-Bum;Smith, Deborah K.;Gentemann, Chelle
    • Proceedings of the KSRS Conference
    • /
    • v.1
    • /
    • pp.150-152
    • /
    • 2006
  • The DISCOVER Project (${\underline{D}}istributed$ ${\underline{I}}nformation$ ${\underline{S}}ervices$ for ${\underline{C}}limate$ and ${\underline{O}}cean$ products and ${\underline{V}}isualizations$ for ${\underline{E}}arth$ ${\underline{R}}esearch$) is a NASA funded Earth Science REASoN project that strives to provide highly accurate, carefully calibrated, long-term climate data records and near-real-time ocean products suitable for the most demanding Earth research applications via easy-to-use display and data access tools. A key element of DISCOVER is the merging of data from the multiple sensors on multiple platforms into geophysical data sets consistent in both time and space. The project is a follow-on to the SSM/I Pathfinder and Passive Microwave ESIP projects which pioneered the simultaneous retrieval of sea surface temperature, surface wind speed, columnar water vapor, cloud liquid water content, and rain rate from SSM/I and TMI observations. The ocean products available through DISCOVER are derived from multi-sensor observations combined into daily products and a consistent multi-decadal climate time series. The DISCOVER team has a strong track record in identifying and removing unexpected sources of systematic error in radiometric measurements, including misspecification of SSM/I pointing geometry, the slightly emissive TMI antenna, and problems with the hot calibration source on AMSR-E. This in-depth experience with inter-calibration is absolutely essential for achieving our objective of merging multi-sensor observations into consistent data sets. Extreme care in satellite inter-calibration and commonality of geophysical algorithms is applied to all sensors. This presentation will introduce the DISCOVER products currently available from the web site, http://www.discover-earth.org and provide examples of the scientific application of both the diurnally corrected optimally interpolated global sea surface temperature product and the 4x-daily global microwave water vapor product.

  • PDF

Material Planning Model for Multi-Project Management in Medium-sized Construction Companies (중견건설업체의 다중현장관리를 위한 자재조달계획 지원 모델)

  • Jung Sung-Lim;Han Ju-Yeon;Kim Kyung-Rai;Shin Dong-Woo
    • Korean Journal of Construction Engineering and Management
    • /
    • v.5 no.2 s.18
    • /
    • pp.106-114
    • /
    • 2004
  • As the scale of construction work is enlarged, complicated and diversified, much construction information from the large number of construction sites is generated and reported to the head office. To control much information generated in construction sites simultaneously, the necessity of supporting system which could extract necessary information is increased. However, comparing with those of large companies, medium-sized companies's organization of head office and management system are weak. So it's difficult to manage multi-projects. Among these site managements, resource management is an important management area. But, resource planning is based on experience and judgement and has not associated with schedule information. So when schedule is changed, the plan must be amended manually. This study investigates material-planning model for multi-project management which is connected with daily report system and scheduling software.

Evaluation of the Accuracy of Distance Measurements on 3D Volume-rendered Image of Human Skull Using Multi-detector CT: Effects of Acquisition Section Thickness and Reconstruction Section Thickness

  • Haijo Jung;Kim, Hee-Joung;Lee, Sang-Ho;Kim, Dong-Wook;Soonil Hong;Kim, Dong-Hyeon;Son, Hye-Kyung;Wonsuk Kang;Kim, Kee-Deog
    • Proceedings of the Korean Society of Medical Physics Conference
    • /
    • 2002.09a
    • /
    • pp.457-460
    • /
    • 2002
  • The image quality of three-dimensional (3D) images has been widely investigated by the qualitative analysis method. A need remains for an objective and quantitative method to assess the image quality of 3D volume-rendered images. The purpose of this study was to evaluate the quantitative accuracy of distance measurements on 3D volume-rendered images of a dry human skull by using multi-detector computed tomography (MDCT). A radiologist measured five times the twenty-one direct measurement line items composed among twelve reference points on the skull surface with a digital vernier caliper. The water filled skull specimen was scanned with a MDCT according to the section thicknesses of 1.25, 2.50, 3.75, and 5.00 mm for helical (high quality; pitch 3:1) scan mode. MDCT data were reconstructed with its acquisition section thickness and with 1.25 mm section thickness for all scans. An observer also measured seven times the corresponding items on 3D volume-rendered images with measuring tools provided by volumetric analysis software. The quantitative accuracy of distance measurements on the 3D volume-rendered images was statistically evaluated (p-value < 0.05) by comparatively analyzing these measurements with the direct distance measurements. The accuracy of distance measurements on the 3D volume-rendered MDCT images acquired with 1.25, 2.50, 3,75 and 5.00 mm section thickness and reconstructed with its section thickness were 48%, 33%, 23%, and 14%, respectively. Meanwhile, there were insignificant statistical differences in accuracy of distance measurements among 3D volume-rendered images reconstructed with 1.25 mm section thickness for the each acquisition section thickness. MDCT images acquired with thick section thickness and reconstructed with thin section thickness in helical scan mode should be effectively used in medical planning of 3D volume-rendered images. The quantitative analysis of distance measurement may be a useful tool for evaluating the quantitative accuracy and the defining optimal parameters of 3D volume-rendered CT images.

  • PDF

Current Status of the Korean ALMA Project

  • Kim, Jongsoo
    • The Bulletin of The Korean Astronomical Society
    • /
    • v.39 no.2
    • /
    • pp.116.1-116.1
    • /
    • 2014
  • Korea officially joined the ALMA (Atacama Large Millimeter/submillimeter Array) project on August 17, 2014. Korea was allowed to apply for the Cycle 2 call-for-proposal before joining the project. Korea submitted 17 proposals, and 4 of them were selected as high-priority. The fund of an 11-year Korean ALMA project in the KASI (Korea Astronomy and Space Science Institute) was approved. The project team formulated an ARC (ALMA Regional Center) node at the KASI and already started its supporting activities for the Korean Astronomical Society. The team also set up a future development plan for ASTE (Atacama Submillimeter Telescope Experiment) and ALMA. A couple of engineers are now doing concept design of a multi-beam receiver system for the ASTE, Because of the ALMA participation, Korea could also access open-use time of ASTE and Mopra telescopes organized by Japan. As of this writing, EACOA (East Asia Core Observatories Association) is now under discussion on making an organization called "East Asian Observatory" and the possible operation of JCMT (James Clerk Maxwell Telescope). I will briefly mention the future prospect of these activities.

  • PDF

A Plan on the Flood Control Ability Improvement Project to maintain stability of existing dams (기존댐 치수능력 증대사업의 시행 방안)

  • Lee, Wan-Ho;Ahn, Hee-Bok
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2006.10a
    • /
    • pp.191-201
    • /
    • 2006
  • The flood control ability improvement project on existing dams is the project for prevention of disasters from excessive flood due to climate changes and thus protects lives and property damages by increasing safety of dams. The collapse of dam brings unimaginable disasters, so the project needs to be swiftly conducted by Government's funding. This paper introduces tile examples of the flood control ability improvement projects of multi-purpose and water supply dams, which is conducted in the way of structural measures among 26 dams operated by Kwater.

  • PDF