A Study on the Improving the Accuracy of Cost Estimating through Analyzing Influence Factors in Apartment  

Yun, Ji-Yeong (Department of Architectural Engineering, Hanbat University)
Jeong, Kyeong-Tae (Department of Architectural Engineering, Hanbat University)
Lee, Dong-Hoon (Department of Architectural Engineering, Hanbat University)
Publication Information
Journal of the Korea Institute of Building Construction / v.20, no.2, 2020 , pp. 183-190 More about this Journal
Abstract
Currently, the multi-unit houses are the largest in the ratio of housing types, and the number of households in multi-unit houses is steadily increasing. As the multi-family housing project continues, the accuracy of estimates for decision-making and feasibility assessment are required in the early stages of the project. Therefore, this study selected the influential factors affecting the estimated estimate and showed the relative importance of each factor through weight analysis and suggested the method of calculating the estimated estimate to improve the accuracy. The calculation plan presented through this study will be used as a useful data for project feasibility review and is expected to make a great contribution in preventing the economic loss of the client.
Keywords
cost estimating; influence factors; apartment building; construction project; AHP;
Citations & Related Records
Times Cited By KSCI : 5  (Citation Analysis)
연도 인용수 순위
1 Kim JW, Lee JH. Identifying risks of power plant EPC business in the middle east and analyzing their priority by the AHP. Journal of Korea Plant of Engineering and Construction. 2015 Dec;11(3):32-45.
2 Kim GH, An SH. A study on the correlation between selection methods of input variables and number of data in estimation accuracy. Journal of Architectural Institute of Korea. 2007 Dec;23(4):129-37.
3 Park MS, Han KJ, Lee HS, Lim DH. Sustainable cost estimating model for construction projects. Journal of Architectural Institute of Korea. 2008 Dec;24(10):167-78.
4 Haam KH. A study and application on the influencing factor of schematic estimates in apartment housing project [master's thesis]. [Cheongju (Korea)]: Chungbuk University; 2009. 81 p.
5 Kim J, Cha HS. Development of estimation system for housing remodeling cost through influence analysis by design elements. Korean Journal of Construction Engineering and Management. 2018 Nov;19(6):65-78. https://doi.org/10.6106/KJCEM.2018.19.6.065   DOI
6 An SH, Yoon JE, Kang KI. A study on the assessment model of preliminary cost estimates using discriminant analysis. Journal of Architectural Institute of Korea. 2005 Dec;21(9):169-76.
7 Park YW, Park HS. Weights for construction performance impact factors of public construction project. Journal of the Korea Creative Content Association. 2012 Dec;12(8):373-9.   DOI
8 Park KR, Chung JS. A study od evaluation system of NATM tunnel using delphi and AHP. Journal of the Korea Institute for Structural Maintenance and Inspection. 2017 Dec;21(6):25-34. https://doi.org/10.11112/jksmi.2017.21.6.025   DOI
9 Ahn YS, Song KR, Heo JM. Improving the accuracy of screening of cost estimating in early construction project phase. Journal of Architectural Institute of Korea. 2003 Dec;19(11):133-40.
10 Son BS, Lee HS, Kim ST. Development of cost estimating model using quantity variation analysis by influence variables for the schematic design phase. Korean Journal of Construction Engineering and Management. 2007 Dec;8(2):155-66.
11 Park YJ, Won SK, Han CH, Lee JB. A study on 3D BIM collaborative approximate estimating model of structural work for apartment projects. Journal of Architectural Institute of Korea. 2011 Dec;27(6):123-30.