연결 강판을 이용한 모듈러 유닛 간 접합부의 비선형 거동 해석 (Nonlinear Behavior Analysis of Connections Between Modular Units Using Connecting Steel Plate)

  • 김현구;유정한
    • 한국공간구조학회논문집
    • /
    • 제23권2호
    • /
    • pp.45-52
    • /
    • 2023
  • Modular construction is an economical and efficient construction that reduces time and costs by manufacturing units in factories and constructing them on site. Currently, the demand for modular construction is increasing not only abroad but also domestically. As the demand for modular construction increases, a lot of development and research on connections between modular units are being conducted. Connections between modular units should be quick and simple to assemble when assembling units on site, and should be in a form that allows each unit to be connected regardless of direction. In addition, it must be able to exert sufficient strength against external loads. In this study, a connection between modular units using connecting steel plates and bolts was proposed, and the nonlinear behavior of the connection to external lateral force was analyzed through finite element analysis, and resistance performance was evaluated.

Modular reactors: What can we learn from modular industrial plants and off site construction research

  • Paul Wrigley;Paul Wood;Daniel Robertson;Jason Joannou;Sam O'Neill;Richard Hall
    • Nuclear Engineering and Technology
    • /
    • 제56권1호
    • /
    • pp.222-232
    • /
    • 2024
  • New modular factory-built methodologies implemented in the construction and industrial plant industries may bring down costs for modular reactors. A factory-built environment brings about benefits such as; improved equipment, tools, quality, shift patterns, training, continuous improvement learning, environmental control, standardisation, parallel working, the use of commercial off shelf equipment and much of the commissioning can be completed before leaving the factory. All these benefits combine to reduce build schedules, increase certainty, reduce risk and make financing easier and cheaper.Currently, the construction and industrial chemical plant industries have implemented successful modular design and construction techniques. Therefore, the objectives of this paper are to understand and analyse the state of the art research in these industries through a systematic literature review. The research can then be assessed and applied to modular reactors.The literature review highlighted analysis methods that may prove to be useful. These include; modularisation decision tools, stakeholder analysis, schedule, supply chain, logistics, module design tools and construction site planning. Applicable research was highlighted for further work exploration for designers to assess, develop and efficiently design their modular reactors.

모듈러 건축 현장의 위험성평가를 위한 양중작업 위험요소 분석 (Risk Analysis of Lifting Work for Risk Assessment of Modular Construction)

  • 전영훈;김균태;전은비
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2021년도 봄 학술논문 발표대회
    • /
    • pp.291-292
    • /
    • 2021
  • In modular construction, it is insufficient for safety management of workers, and workers are still exposed to the risk of accidents due to work at high places for lifting and assembly work in modular construction sites. Therefore, it is necessary when preventive safety management through risk management of workers on modular construction sites. This study is a basic study for the risk assessment(checklist) of modular construction, and the purpose of this study is to analyze the risk factors of the module lifting work at the modular construction site. It is intended to identify the hazard risk factors and improvement measures of the existing lifting operation, by analyzing the case of the risk assessment of the existing RC method, and to identify the risk factors for each work process when lifting the module. In the future, the results of this study are expected to be utilized in the development of checklists for risk assessment as safety management plan for modular construction sites.

  • PDF

인필식 유닛모듈러 공법을 활용한 학교시설의 리모델링 계획시 영향요인 (A Study on Effect Factors of Using Infill Unit-Modular Construction for Remodeling plan of School Facilities)

  • 전영훈;김균태;김석
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2016년도 추계 학술논문 발표대회
    • /
    • pp.138-139
    • /
    • 2016
  • In this study, we propose a way of infill unit-modular construction for school facilities and identify the main effect factors when planning a remodeling of the school facilities by using infill unit-modular construction. This study is limited to have document for domestic infill modular construction such as technical data, knowhow due to fewer cases and research. we expect to study on an practical alternative for infill modular housing specifically.

  • PDF

인필 모듈러 건설시스템의 이동장치 개발 (Development of Mobile Device of the Infill Modular Construction System)

  • 김창한;정찬우;김형수;황현준;김균태
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2012년도 추계 학술논문 발표대회
    • /
    • pp.163-164
    • /
    • 2012
  • Recently new construction system, the Infill Modular Construction System, is being emphasized depending on the industrialized technology introduction and the needs of high-rise housing. In order to applicate the Infill Modular Construction System and activate the domestic market, development of insufficient element technologies against the advanced technologies should be preceded and mobile device development of Infill Unit Module which is differentiated from the existing modular construction systems should be needed urgently. As advanced research for the activation of the Infill Modular Construction System, this research aims to develop Infill Unit Module's mobile device. This is expected to improve the constructability of Infill Unit Module. In addition development of mobile device considering weight of Infill Unit Module and construction errors are being planned.

  • PDF

사례분석을 통한 모듈러 건축의 현장 안전관리 분류체계(안) 도출 (Derivation of the Safety Management Classification System for Modular Construction through Case Study)

  • 전영훈;김균태;전은비
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2020년도 가을 학술논문 발표대회
    • /
    • pp.173-174
    • /
    • 2020
  • In modular construction, safety management is required to prevent the occurrence of risk factors such as lifting work and high place work due to the characteristics of the construction method. Therefore, this study is a basic study for safety management of modular construction, and the purpose of this study is to compare and analyze the classification system of modular construction derived by analyzing the construction process of the existing case. Based on the results of this study, the safety management classification system will be used in future research to derive safety management factors in modular construction.

  • PDF

3D Infill을 활용한 PC 모듈러공법과 기존공법과의 시공프로세스 비교 연구 (A Study on the Comparison of the Construction Process between the PC Modular Construction Method Using 3D Infill and the Existing Construction Method)

  • 정준수;임석호;양현정
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2023년도 봄 학술논문 발표대회
    • /
    • pp.87-88
    • /
    • 2023
  • In accordance with changes in the domestic construction environment, interest in off-site construction methods (factory-manufactured construction methods) including modular construction methods is rapidly increasing. Among various off-site (OSC) construction methods, the front runner is the steel-based box-type modular construction method. Compared to the existing wet construction method, the steel modular construction method is increasing in terms of securing economic feasibility by shortening the construction period and increasing the prefabrication rate. However, due to the recent rise in raw materials and a sharp rise in the exchange rate, the economic feasibility of the wet method is deteriorating compared to the wet method. Therefore, a hybrid between 9-Matrix-based OSC construction methods is considered as a solution, away from the steel-box type combination, and a comparative study of the construction process between each construction method is being conducted. It was analyzed that the PC modular construction method shortened the construction period by 9% compared to the existing steel modular construction method. On the other hand, when comparing the construction period of the Gayang-dong demonstration complex calculated assuming that all modules are applied, it is estimated that there will be a 12% reduction in construction period compared to the steel modular method and a whopping 43% compared to the RC method.

  • PDF

국내 모듈러 건축 프로젝트의 단계별 BIM 활용업무 분석 (An Analysis of BIM uptake in Each Phase of Modular Construction Projects in Korea)

  • 이웅균;이명도
    • 대한건축학회연합논문집
    • /
    • 제21권5호
    • /
    • pp.133-140
    • /
    • 2019
  • Building Information Modeling (BIM) and modular construction are regarded as important technologies that could contribute to overcoming the crisis faced by the construction industry. However, BIM uptake in current modular construction projects is limited. Moreover, there are no specific guidelines to support decision-making regarding the application of BIM in modular construction projects. Therefore, this study aims to analyze the possibility for BIM uptake in each phase of modular construction projects in Korea. Initially, the literature detailing on BIM uptake cases in modular construction projects was reviewed. The detailed work and activities for each phase of a modular project were analyzed via a questionnaire targeting domestic modular experts, to derive items requiring improvement due to errors or changes occurring in the actual project. Ten realistic BIM uptake items were derived, reflecting the results of literature review and expert interviews. Then, the BIM uptake items in each phase were analyzed in terms of necessity and efficiency via a second questionnaire using five-point Likert scales. Finally, the BIM utilization index (BIM UI) of the BIM uptake items was suggested as a priority measure. As a result, the BIM UI of "3D coordination" (U2), "design authoring and reviews for off-site fabrication" (U3), and "detailed 3D modeling for off-site fabrication" (U4), were assigned the highest priority. The results of this study can be used as guidelines to support decision-making regarding the application of BIM in modular construction projects.

강재 프레임 주택형 모듈러의 경제성 분석: 벽식구조인 도시생활형주택과의 사례비교를 통해 (An Economic Analysis of Steel Framed Modular Housing: Compared with Case of Urban Type Living Housing of Wall-slab)

  • 방종대;전주영;박지영;김종엽;김갑득;천영수
    • 토지주택연구
    • /
    • 제5권4호
    • /
    • pp.305-314
    • /
    • 2014
  • 노동집약적 현장중심의 습식공법의 한계로 인해 기술집약적이고 공장생산방식인 유닛 모듈러 공법이 주목을 받고 있다. 국내에서도 유닛 모듈러 공법을 개발하여 학교, 기숙사, 군막사 등에 활발히 적용하고 있으나 주거용 건축물에는 적용하지 못하고 있다. 그 이유는 거주성능에 대한 검증이 부족하고, 경제성에 대한 확신이 부족하기 때문이다. 따라서 본 연구는 모듈러 공법의 기술발전과 주거용 건축물로의 적용을 활성화하기 위해 모듈러 주택의 경제성을 분석하였다. 연구결과에 의하면 건설원가만을 단순 비교했을 때 모듈러 주택의 건설원가는 약 6.2% 상승하는 것으로 나타났다. 그러나 모듈러 주택의 장점인 공기단축이나 공장생산을 통한 생산성을 제고할 경우, 모듈러 주택의 건설원가는 벽식구조 주택과 비슷한 수준이 될 것으로 판단된다.

선진 사례 벤치마킹을 통한 국내 모듈러 건축 시공 프로세스 제안 (Modular Building Construction Process Development by Benchmarking International Best Practices)

  • 신현규;안용한
    • 한국건설관리학회논문집
    • /
    • 제17권6호
    • /
    • pp.3-12
    • /
    • 2016
  • 본 연구의 목적은 모듈러 건축 프로젝트를 수행하는데 발생할 수 있는 위험요인을 도출하고, 해외 선진사례 분석을 통해 도출한 관리요소를 벤치마킹함으로써 국내 적용 가능한 모듈러 건축 시공 프로세스를 제안하는 것이다. 본 연구를 수행하기 위해 해외 대표적인 모듈러 건축 사례인 미국 애틀랜틱 야드 B2 프로젝트를 분석하고 내용분석법을 통해 모듈러 건축 시공 단계에서 발생할 수 있는 위험요인을 도출하였다. 본 연구결과인 모듈러 건축 시공 프로세스를 기반으로 모듈러 건축 설계, 제작 단계부터 시공 단계에 발생되는 위험요인을 고려하여 관리한다면, 시공 과정에서 발생할 수 있는 잠재적인 위험요인을 사전에 방지하고, 시행착오를 줄여 모듈러 건축 시공성도 향상시킬 수 있을 것이다. 또한, 모듈러 건축 프로젝트를 효율적으로 관리함으로써 모듈러 공법의 장점인 공기 단축 및 공사비 절감을 실현하고, 결과적으로 시공품질을 확보하여 모듈러 건축 활성화에 기여할 수 있을 것이다.