• 제목/요약/키워드: Mixed model

검색결과 2,603건 처리시간 0.042초

Reference Priors in a Two-Way Mixed-Effects Analysis of Variance Model

  • 장인홍;김병휘
    • Journal of the Korean Data and Information Science Society
    • /
    • 제13권2호
    • /
    • pp.317-328
    • /
    • 2002
  • We first derive group ordering reference priors in a two-way mixed-effects analysis of variance (ANOVA) model. We show that posterior distributions are proper and provide marginal posterior distributions under reference priors. We also examine whether the reference priors satisfy the probability matching criterion. Finally, the reference prior satisfying the probability matching criterion is shown to be good in the sense of frequentist coverage probability of the posterior quantile.

  • PDF

신경망을 이용한 혼류조립순서 결정 (Mixed Model Assembly Sequencing using Neural Net)

  • 원영철;고재문
    • 산업공학
    • /
    • 제10권2호
    • /
    • pp.51-56
    • /
    • 1997
  • This paper concerns with the problem of mixed model assembly sequencing using neural net. In recent years, because of two characteristics of it, massive parallelism and learning capability, neural nets have emerged to solve the problems for which more conventional computational approaches have proven ineffective. This paper proposes a method using neural net that can consider line balancing and grouping problems simultaneously. In order to solve the mixed model assembly sequencing of the motor industry, this paper uses the modified ART1 algorithm.

  • PDF

Mixed analytical/numerical method applied to the low Reynolds number k-epsilon turbulence model

  • Du T.;Wu Z.N.
    • 한국전산유체공학회:학술대회논문집
    • /
    • 한국전산유체공학회 2003년도 The Fifth Asian Computational Fluid Dynamics Conference
    • /
    • pp.272-275
    • /
    • 2003
  • A mixed analytical/numerical method is developed here to solve the low Reynolds number kepsilon turbulence model. In this method the advection-diffusion part is solved numerically, while the source terms are split into two parts: one part is solved analytically and the next is solved numerically.

  • PDF

섬유혼합토의 전단파괴 해석 (Anlaysis on the Shear Failure of Fiber Mixed Soil)

  • 박영곤;장병욱
    • 한국농공학회:학술대회논문집
    • /
    • 한국농공학회 1999년도 Proceedings of the 1999 Annual Conference The Korean Society of Agricutural Engineers
    • /
    • pp.562-568
    • /
    • 1999
  • The model using homogenization technique based on energy concept for the prediction of the failure criterion of staple fiber mixed soil was developed to increase the practice and the application of staple fiber as a reinforcement for improving soft ground and agrictural structures. Parameters of the model are aspect ration and volumetric ocntnet of fiber, cohesion and internal friction angle of soil, adhesiion intercept of soil and fiber. It is judged that the model developed in this study is applicable to the soil composed of clay, silt and sand mixed by linear types of fiber such as steel bar, steel fiber , natural fiber etc..

  • PDF

섬유혼합토의 전단파괴 해석 (Analysis on the Shear Failure of Fiber Mixed Soil)

  • 박영곤
    • 한국농공학회지
    • /
    • 제42권2호
    • /
    • pp.86-92
    • /
    • 2000
  • The model using homogenization technique based on energy concept for the prediction of the failure criterion of staple fiber mixed soil was developed to increase the practice and the application of staple fiber as a reinforcement for improving soft ground. Parameters of the model are aspect ratio and volumetric content of fiber, cohesion and internal friction angle of soil, adhesion intercept and interface friction angle of soil and fiber. It is considered that the model developed in this study is applicable to the soil composed of clay, silt and sand mixed by thread types of fiber such as steel bar, steel fiber, natural fiber etc.

  • PDF

다목적 유전 알고리듬을 이용한 혼합모델 조립라인의 최적 생산순서계획 (Mixed-Model Sequencing Using Genetic Algorithms with Multiple Evaluation Criteria)

  • 김연민;김영진
    • 산업공학
    • /
    • 제13권2호
    • /
    • pp.204-210
    • /
    • 2000
  • This paper deals with the problem of mixed-model sequencing on an assembly line. In this sequencing problem we want to minimize the risk of the conveyor stoppage and the total utility work. This paper applies genetic algorithm to solve the mixed-model sequencing problem which is formulated as an integer programming. The solution we get from this algorithm is compared with the solution of Tsai(1995)'s.

  • PDF

준비시간이 있는 혼합모델 조립라인에서 투입순서문제를 위한 탐색적 방법 (Heuristic Method for Sequencing Problem in Mixed Model Assembly Lines with Setup Time)

  • 현철주
    • 대한안전경영과학회:학술대회논문집
    • /
    • 대한안전경영과학회 2008년도 추계학술대회
    • /
    • pp.35-39
    • /
    • 2008
  • This paper considers the sequencing of products in mixed model assembly lines. The sequence which minimizes overall utility work in car assembly lines reduce the cycle time, the number of utility workers, and the risk of conveyor stopping. The sequencing problem is solved using Tabu Search. Tabu Search is a heuristic method which can provide a near optimal solution in real time. Various examples are presented and experimental results are reported to demonstrate the efficiency of the technique.

  • PDF

혼합정수계획법을 활용한 도로포장 보수구간 선정 최적화 연구 (Optimal Road Maintenance Section Selection Using Mixed Integer Programming)

  • 조건영;임희종
    • 한국도로학회논문집
    • /
    • 제19권3호
    • /
    • pp.65-70
    • /
    • 2017
  • PURPOSES : Pavement Management System contains the data that describe the condition of the road. Under limited budget, the data can be utilized for efficient plans. The objective of this research is to develop a mixed integer program model that maximizes remaining durable years (or Lane-Kilometer-Years) in road maintenance planning. METHODS : An optimization model based on a mixed integer program is developed. The model selects a cluster of sectors that are adjacent to each other according to the road condition. The model also considers constraints required by the Seoul Metropolitan Facilities Management Corporation. They select two lanes at most not to block the traffic and limit the number of sectors for one-time construction to finish the work in given time. We incorporate variable cost constraints. As the model selects more sectors, the unit cost of the construction becomes smaller. The optimal choice of the number of sectors is implemented using piecewise linear constraints. RESULTS : Data (SPI) collected from Pavement Management System managed by Seoul Metropolitan City are fed into the model. Based on the data and the model, the optimal maintenance plans are established. Some of the optimal plans cannot be generated directly in existing heuristic approach or by human intuition. CONCLUSIONS:The mathematical model using actual data generates the optimal maintenance plans.

신경망모형을 이용한 시간적 분해모형의 개발 3. 혼합자료의 적용 (Development of Temporal Disaggregation Model using Neural Networks 3. Application of the Mixed Data)

  • 김성원
    • 한국수자원학회:학술대회논문집
    • /
    • 한국수자원학회 2009년도 학술발표회 초록집
    • /
    • pp.1215-1218
    • /
    • 2009
  • The goal of this research is to apply the neural networks models for the disaggregation of the pan evaporation (PE) data, Republic of Korea. The neural networks models consist of generalized regression neural networks model (GRNNM) and multilayer perceptron neural networks model (MLP-NNM), respectively. The disaggregation means that the yearly PE data divides into the monthly PE data. And, for the performances of the neural networks models, they are composed of training and test performances, respectively. The training data consist of the mixed data The mixed data involves the historic data and the generated data using PARMA (1,1). And, the testing data consist of the only historic data, respectively. From this research, we evaluate the impact of GRNNM and MLP-NNM for the disaggregation of the nonlinear time series data. We should, furthermore, construct the credible data of the monthly PE data from the disaggregation of the yearly PE data, and can suggest the methodology for the irrigation and drainage networks system.

  • PDF

A Sequencing Problem in Mixed-Model Assembly Line Including a Painting Line

  • Yoo, J.K.;Moriyama, T.;Shimizu, Y.
    • 제어로봇시스템학회:학술대회논문집
    • /
    • 제어로봇시스템학회 2005년도 ICCAS
    • /
    • pp.1118-1122
    • /
    • 2005
  • In order to keep production balance at a mixed-model assembly line and a painting line, large WIP(Work- In-Process) inventories are required between two lines. To increase the efficiency of line handling through reducing the inventories under this circumstance, this paper concerns with a sequencing problem for a mixed-model assembly line that includes a painting line where the uncertain elements regarding the defective products exist. Then, we formulate a new type of the sequencing problem minimizing the line stoppage time and the idle time with forecasting the supply time of the products from the painting line. Finally, we examine the effectiveness of the proposed sequencing through computer simulations.

  • PDF