• Title/Summary/Keyword: Metro Railway

Search Result 317, Processing Time 0.03 seconds

A Study on the Prevention of Fall Accident for on the Roof in Rail road Vehicle (철도차량 옥상 작업시 추락사고 예방에 관한연구)

  • An, Jong-Gon;Won, Bong-Eui;Kim, Dong-Min
    • Proceedings of the KSR Conference
    • /
    • 2007.05a
    • /
    • pp.58-68
    • /
    • 2007
  • Thorough preparations and investigations must be done in order to prevent the hazards which will happen when workers work on the roof of the rolling stocks. Some industrial disasters can be prevented by solving the risks involved in the working of the work processes. Falling accidents tend to happen from the roof of the trains when workers work in the high position. So through the analysis of the 4M( Man. Machine, Media, Management), this paper analyzed the risk factors among the roof works and all problems of the maintenance. Also this paper suggests new devices or new methods to prevent falling disasters and to relieve the mental senses of uneasiness.

  • PDF

The Introduction of Railroad Pass for One Day in Seoul Metro (서울메트로 1일 승차권 도입 방안 연구)

  • Lee, Dong-Wook;Lee, Tai-Sik;Ryu, Jong-Won;Chung, Chul
    • Proceedings of the KSR Conference
    • /
    • 2007.05a
    • /
    • pp.1221-1226
    • /
    • 2007
  • The subway with the initial constructive expense which is enormous together is the public transportation means where the many expense is expended in the operation and maintenance civil official. Seoul Metro until initial opening to traffic after present time cannot escape every year deficit to be, the cause is a possibility of seeking from the fare system which is short in transportation prime cost. Currently Seoul Metro is operating with the distance proportional fare system the passenger ticket system which is simple (usual volume, group volume and fixed amount volume, affection renunciation, charge free volume). When the biased characteristic of the user it plans considering from the goods development side for the variety for and a deficit solution, against the fare system systematic it researches and solution plan politically. Financial of the subway operation agency young the investigation against the present condition of the hazard subway fare system which is solved the bud with problem point a fare system from the research which it sees consequently and improvement program under analyzing the man with underdeveloped genital organ. Base on the reporter to analyze the introduction plan which with the character which will reach it follows with the necessity of introduction of the 1st passenger ticket (24 hour volume).

  • PDF

Study on Implementation Scheme for Integrated PSD Control System of Seoul Metro (서울메트로 PSD 통합관제시스템 구축방안에 대한 연구)

  • Kim, Yong-Hyeop;Hyun, Yong-Sub;Ryoo, Ho-Joong;Kim, Jin-Su
    • Proceedings of the KSR Conference
    • /
    • 2007.11a
    • /
    • pp.1551-1559
    • /
    • 2007
  • Seoul Metro has been constructing the screen doors on the platforms to provide safe and comfort environments. The screen doors of each station are configured so that they can be operated in automatic mode in connection with ATC/ATO through the integrated control panel in the station control room and in manual mode through the control panel of the station control room and crew control panel. These systems have been implemented with different data communication protocols between systems, HMI configuration, and so on due to ordering processes, implementation time and diverse suppliers, and manufactured to be operated within single station. Seoul Metro has been planning to implement the integrated control system to secure seamless train operation and safety and to have a fast response system against emergency situations such as PSD failure and fire, by implementing the system that is able to collectively manage, monitor and control the operation status and equipment conditions of PSD on to the integrated control center. This paper has studied a scheme to reduce the budget for the future facility constructions by standardizing the data format for data communication with the integrated station control panel and using the open standard protocols, in order to secure consistency of operation, system expansion and maintenance with unified and standardized control items.

  • PDF

An Examination of Customer Usage for Major Railway Station Buildings (주요 철도역사의 고객이용패턴 조사분석)

  • Lee, Jun-One;Bahn, Sang-Woo
    • Proceedings of the KSR Conference
    • /
    • 2008.11b
    • /
    • pp.698-705
    • /
    • 2008
  • Under the rapid change in environment of our society and culture, it is also called for a reform in railway management that has traditionally focused on transportation service. Thus developing a business model to use station buildings as a new source of profit has become a promising core business of railway companies. This study aims to find a way to maximize profits by strategically utilizing station buildings and thereby increasing accessibility to customers and consolidating facilities as a key service point. The subjects of this study include eight station buildings that can represent three types of railway stations including departure stations, junction stations, and metro stations. The researcher conducted an analysis on moving lines for examining user distribution and facility utilization within the selected buildings, a survey for collecting basic information on usage and measuring customer satisfaction of facility in the buildings, and a sight analysis to examine accessibility to the station buildings. On the basis of these analyses, the researcher examined the correlations between convenience, visibility, recognizability and functionality with regard to commerce, amenities, couches, direction boards, etc. within station waiting rooms. On the basis of the above analyses, the researcher provides a scheme to increase profitability in railway operation business and customer benefits of using station buildings by drawing up a plan to improve usage of station buildings and maximize profit-making potential for each category of station buildings.

  • PDF

Bicycle Custody Place Provision in the Station (역사내 자전거보관소 설치 방안)

  • Lee, Pil-Sin;Oh, Suk-Soon
    • Proceedings of the KSR Conference
    • /
    • 2011.10a
    • /
    • pp.1468-1477
    • /
    • 2011
  • Central government and local self-governing bodies are actively promoting bicycle-riding as a solution for transportation, environment, energy and health. They put lot of efforts in the practice of bicycle-related policies such as building bicycle-related infrastructure and creating task force team to improve the bicycle-related systems. However, there is no substantive improvement in the city rail operation agencies regarding the bicycle-related facilities and operation. The expansion of bicycle-related infrastructure in city rail stations is urgently required considering the increase in demands from the bicycle-riders for the facility and bicycle-related service improvement. Accordingly, this study suggests a bicycle-riding vitalization plan linking the city rail and bicycle by providing with a bicycle custody place in the city rail stations which will have comprehensive convenience facilities including the safe-keeping facility for bicycles.

  • PDF

A Study of Overcrowding Effects on Seoul Metro Line 2 (서울메트로 2호선에서 승객폭주 영향에 대한 연구)

  • Gwak, Yun-Bong;Lee, Jong-Woo;Kim, Doo-Gyum;Kho, Young-Whan
    • Proceedings of the KSR Conference
    • /
    • 2011.10a
    • /
    • pp.1960-1965
    • /
    • 2011
  • Train operations run trains to well-scheduled time table and the ideal case would be to have the trains running exactly as scheduled. The train delay resulted from the overcrowding takes place frequently in Seoul metro line 2, and doesn't keep the predefined headway. It requires to analyze the train delay caused from the overcrowding. In this paper we modeled, simulated, and analyzed the delay to disclose the effects in the line 2 operation. The modeling consists of trains entering into the line, running on the line and exiting from the line. The simulation carries out with statistical perturbation and analyzes the disturbance.

  • PDF

The Study about Development and Consideration of Urban Railroad Vehicle Propulsion Control Device (도시철도차량 추진제어시스템 고찰 및 개선에 대한 연구)

  • Lee, Mi-Jeong;Lee, Hyeong-Woo;Ha, Jong-Eun
    • Proceedings of the KSR Conference
    • /
    • 2011.10a
    • /
    • pp.2323-2328
    • /
    • 2011
  • There have been many changes in Subway train types since SeoulMetro opened the Line No.1 in 1974. Propulsion control device has changed many times following the generations of control method from resistance control method which uses large resistor for the traction motor control to chopping control which uses power semiconductors and finally to inverter control. Railroad vehicle propulsion control device refers to devices such as converter/inverter which supply power for subway operation, power conversion equipment like small switching-mode power supply and traction motor. In this paper, we will analyze every part of railroad vehicle propulsion control device of SeoulMetro so we can find problems in the subway operation. And we will present propulsion control device model which makes minimized failures, efficient maintenance possible when replacing railroad vehicle later. By doing this, we hope to ensure stability and improve energy efficiency to the top.

  • PDF

A Study on SLIP actual condition of rainy day at the time of Seoul Metro new style VVVF Inverter Rolling Stock (2,3 lines) (우천 시 서울메트로 신형 VVVF 전동차(2,3호선)의 슬립현상에 관한 연구)

  • Kim, Jae-Hyun;Kim, Ju-Tae;Nam, Jae-Ho;Son, Young-Jin
    • Proceedings of the KSR Conference
    • /
    • 2010.06a
    • /
    • pp.1371-1375
    • /
    • 2010
  • Recently, the Seoul Metro has replaced the old series of Line No.2 and 3 to the new ones. In spite of the replacement, the new ones are more likely to be slippery compared to the old ones. Because the subway system has such short intervals, delayed subways influence the whole line systems, especially during the rush hours. And the slip causes the delay. Therefore we are willing to find out the reason why the new ones are more defective and we will try to mince it from the view of mechanical aspects and handling aspects of driving.

  • PDF

Prediction of the Noise Level inside Metro Electric Cars (통근형 전동차의 객실 내 소음수준예측)

  • 서승일;최문길;김국현
    • Proceedings of the KSR Conference
    • /
    • 1999.05a
    • /
    • pp.185-191
    • /
    • 1999
  • This paper deals with a method to predict the noise level inside metro electric cars running a single-line tunnel at the speed of 80km per hour using ray tracing method, a kind of ray acoustics generally used for a high-frequency and air-born noise analysis. The interior of the car including a under-frame, seats, side doors, end doors, door-pockets, side panels, end panel, a roof panel and so on is modeled. And in order to describe the noise power coming inside, artificial noise sources are designated using sound transmission loss data of each section measured from simple tests and external noise level. The noise level inside the car is calculated and its properties are investigated. The results satisfy the criteria on noise level inside the car.

  • PDF

Renovation plans of operation field of Seoul Metro Line 9 (서울 도시철도 9호선의 운영분야 혁신방안)

  • Han, Woo-Jin;Park, Jeong-Soo
    • Proceedings of the KSR Conference
    • /
    • 2008.06a
    • /
    • pp.1441-1446
    • /
    • 2008
  • Seoul Metro Line 9 (SML9) is the first subway line that private capital invests in Korea. SML9 will cross Seoul, linking the Gimpo Airport to the Gangnam district (25.5km) opening in the first half of 2009. SML9 has a new model in Korea constructed by metropolitan government and private company and operated by specialized public transportation service provider. SML9 is confronted with tough environment of stagnated public transportation and strong competitor, Olympic city expressway. And SML9 is under pressure for showing high efficiency as non-governmental organization from both customers and government. Consequently SML9 must lead the maximum efficiency by using its material and human resource. It is necessary that SML9 raise a competitive power and display its ability in active collaboration with relative organization and company. Hereupon, I propose renovation plans from viewpoint of operation field of SML9, (1) efficient train scheduling regime focusing on the combination of express and local train (2) close connection of other mean of transportation and (3) effective connection convention with Airport Railroad (AREX) as the line connected directly.

  • PDF