• 제목/요약/키워드: Maximum Time Delay

검색결과 465건 처리시간 0.028초

장공발파 시 천공간격과 기폭시차에 따른 최대주변형률 비교 연구 (Comparative Study on the Maximum Principal Strain due to the Hole Spacing and the Detonation Delay Time in the Long-Hole Blasting)

  • 송정언;박훈;김승곤
    • 화약ㆍ발파
    • /
    • 제32권3호
    • /
    • pp.10-17
    • /
    • 2014
  • 본 연구에서는 2자유면을 가진 암반의 장공발파 시 천공간격과 뇌관의 기폭시차에 따라 발생되는 내부주변형률의 변화를 확인하기 위하여 Visual FEA 유한요소 프로그램으로 해석 암반의 단면을 모델링하여 인접공균열권 내의 주요 절점에서 최대주변형률을 분석하였다. 결과적으로, 장공발파 시 천공간격이 좁고 기폭시차가 길수록 인접공 균열권 내에 미치는 최대주변형률 값이 크게 나타났고, 장약장 내 폭약의 기폭 위치에 따라 최대 주변형률의 차이를 보였다.

$H_{\ifty}$ 이론을 이용한 ATM 망의 흐름 제어 (Flow Control of ATM Networks Using $H_{\ifty}$ Method)

  • 강태삼
    • 제어로봇시스템학회논문지
    • /
    • 제6권8호
    • /
    • pp.617-622
    • /
    • 2000
  • In this paper proposed is an $H_{\ifty}$ based flow controller for the ATM networks. The round trip time-delay uncertainty is taken into account and robustness of the proposed controller is analyzed. Maximum allowable time-delay uncertainties are computed with different weightings on performance and robustness. And discussed is a time-domain implementation method of the proposed controller. Time domain simulation with realistic environment demonstrates that the performance of the proposed controller is much better than that of conventional one.

  • PDF

대기시간을 이용한 적응형 멀티미디어 동기화 기법 (Adaptive Multimedia Synchronization Using Waiting Time)

  • 이기성;이근왕;이종찬;오해석
    • 한국정보처리학회논문지
    • /
    • 제7권2S호
    • /
    • pp.649-655
    • /
    • 2000
  • Real-time application programs have constraints which need to be met between media-data. These constraints represents the delay time ad quality of service between media-data to be presented. In order to efficiently describe the delay time and quality of service, a new synchronization mechanism is needed. Proposed paper is a dynamic synchronization that minimized the effects of adaptive transmission delay time. That is, the method meets the requirements of synchronization between media-dat by handling dynamically the adaptive waiting time resulted from variations of delay time. In addition, the mechanism has interval adjustment using maximum delay jitter time. This paper decreases the data loss resulted from variation of delay time and from loss time of media-data by means of applying delay jitter in order to deal with synchronization interval adjustment. Plus, the mechanism adaptively manages the waiting time of smoothing buffer, which leads to minimize the gap from the variation of delay time. The proposed paper is suitable to the system which requires the guarantee of high quality of service and mechanism improves quality of services such as decrease of loss rate, increase of playout rate.

  • PDF

Foundation Fieldbus에서 효율적인 실시간 데이터 전송 (Effective Real-Time Data Transmission in the Foundation Fieldbus)

  • 홍승호
    • 대한전기학회논문지:시스템및제어부문D
    • /
    • 제52권11호
    • /
    • pp.644-649
    • /
    • 2003
  • This study develops an analytical model for the delay analysis of real-time data in the token-passing service of Foundation Fieldbus(FF). Using the analytical model, this study proposes a network design scheme of FF Two design criteria are introduced in this study; one is the average delay of real-time data, and the other is the maximum allowable delay of real-time data. The network design scheme determines the network parameters that satisfies the performance requirements given by these design criteria.

Long-term analysis of tropospheric delay and ambiguity resolution rate of GPS data

  • Kim, Su-Kyung;Bae, Tae-Suk
    • 한국측량학회지
    • /
    • 제30권6_2호
    • /
    • pp.673-680
    • /
    • 2012
  • Long-term GPS data analysis was performed in order to analyze the seasonal variation of tropospheric delay and the success rate of the ambiguity resolution. For this analysis, a total of 57 stations including 10 IGS stations in East Asia were processed together with double-differenced observables using Bernese GPS Software V5.0. The time span for this study ranges from 2002.0 to 2012.5 (10.5 years). The average baseline length is 339.0 km and the maximum reaches up to 2,000 km. The analysis is focused on two things: the annual variation of the tropospheric delay and the ambiguity resolution rate. The tropospheric delay is closely related to the weather condition, especially relative humidity, therefore it was estimated that the maximum would be in summer, while reaching its minimum in winter with the apparent seasonal variations. On the contrary, however, the success rate of the ambiguity resolution shows the opposite pattern: its maximum was in winter and minimum in summer. The fact seems to be induced by the surrounding conditions; that is, the trees thick with leaves near the GPS antenna interfere with GPS signals in summer. This seems to confirm partly that there is a distinct trend in the decreasing success rate since 2006 because the trees are growing every year. It is necessary to eliminate the factors that degrade the GPS quality and the tropospheric modeling for Korea needs to be studied further.

지연제로서 전분이 시멘트혼합토에 미치는 영향 (The Effects of Starch as a Retarder in Soil Cement Mixtures)

  • 김재영
    • 한국농공학회지
    • /
    • 제18권3호
    • /
    • pp.4163-4170
    • /
    • 1976
  • This study was conducted to investigate the effect of starch as a retarder on the maximum dry density and the unconfined compressive strength of soil cement mixtures for varied starch contents (0-3%), cement contents (3-12%), and delay times (0-6hrs) in four soils. The experimental results obtained from maximum dry density and unconfined compressive strength tests are as follows: 1. Maximum dry density and unconfined compressive strength were increased greatly in soil cement mixtues rwhen starch was added as retarder but their value schanged according to soil varieties. 2. Maximum dry density showed at about 0.5 percent to 1.0 percent of starch in KY soil and about 2.0 percent to 2.5 percent in SS soil when delay time was changed in 2.4, and 6 hours in compaction test. 3. The larger content of cement was, the bigger effects of maximum dry density and compressive strength were in soil cement. mixtures. 4. As delay time changed 2.4, and 6 hours in compaction test, 7-day unconfined compressive strength showed the biggest value at about 0.5 percent of starch in KY soil and 2.0 percent in SS soil, and the maximum value of 28-day unconfined compressive strength showed at about 0.5 percent in KY soil and 1.5 percent in SS soil.

  • PDF

Chaos를 이용한 단기부하예측 (A Daily Maximum Load Forecasting System Using Chaotic Time Series)

  • 최재균;박종근;김광호
    • 대한전기학회:학술대회논문집
    • /
    • 대한전기학회 1995년도 하계학술대회 논문집 B
    • /
    • pp.578-580
    • /
    • 1995
  • In this paper, a method for the daily maximum load forecasting which uses a chaotic time series in power system and artificial neural network. We find the characteristics of chaos in power load curve and then determine a optimal embedding dimension and delay time, For the load forecast of one day ahead daily maximum power, we use the time series load data obtained in previous year. By using of embedding dimension and delay time, we construct a strange attractor in pseudo phase plane and the artificial neural network model trained with the attractor font mentioned above. The one day ahead forecast errors are about 1.4% of absolute percentage average error.

  • PDF

Multicast Tree to Minimize Maximum Delay in Dynamic Overlay Network

  • 이채영;백진우
    • 한국경영과학회:학술대회논문집
    • /
    • 대한산업공학회/한국경영과학회 2006년도 춘계공동학술대회 논문집
    • /
    • pp.1609-1615
    • /
    • 2006
  • Overlay multicast technique is an effective way as an alternative to IP multicast. Traditional IP multicast is not widely deployed because of the complexity of IP multicast technology and lack of application. But overlay multicast can be easily deployed by effectively reducing complexity of network routers. Because overlay multicast resides on top of densely connected IP network, In case of multimedia streaming service over overlay multicast tree, real-time data is sensitive to end-to-end delay. Therefore, moderate algorithm's development to this network environment is very important. In this paper, we are interested in minimizing maximum end-to-end delay in overlay multicast tree. The problem is formulated as a degree-bounded minimum delay spanning tree, which is a problem well-known as NP-hard. We develop tabu search heuristic with intensification and diversification strategies. Robust experimental results show that is comparable to the optimal solution and applicable in real time

  • PDF

A 5-20 GHz 5-Bit True Time Delay Circuit in 0.18 ㎛ CMOS Technology

  • Choi, Jae Young;Cho, Moon-Kyu;Baek, Donghyun;Kim, Jeong-Geun
    • JSTS:Journal of Semiconductor Technology and Science
    • /
    • 제13권3호
    • /
    • pp.193-197
    • /
    • 2013
  • This paper presents a 5-bit true time delay circuit using a standard 0.18 ${\mu}m$ CMOS process for the broadband phased array antenna without the beam squint. The maximum time delay of ~106 ps with the delay step of ~3.3 ps is achieved at 5-20 GHz. The RMS group delay and amplitude errors are < 1 ps and <2 dB, respectively. The measured insertion loss is <27 dB and the input and output return losses are <12 dB at 5-15 GHz. The current consumption is nearly zero with 1.8 V supply. The chip size is $1.04{\times}0.85\;mm^2$ including pads.

시간지연을 갖는 추력기 자세제어시스템의 Limit Cycle 분석 (Limit Cycle Analysis Of Attitude Control System Using Thruster Under Time Delay Effect)

  • 안재명;노웅래;정호락;최형돈
    • 제어로봇시스템학회:학술대회논문집
    • /
    • 제어로봇시스템학회 2000년도 제15차 학술회의논문집
    • /
    • pp.3-3
    • /
    • 2000
  • Limit cycle analysis of attitude control system using gas jet thrusters is performed. Schmitt-Trigger and PD control laws are applied and solenoid valve time delay is considered. Phase plane method is used for calculation of characteristics of limit cycle. Important characteristics of resultant limit cycle such as frequency, amplitude, maximum rate, and duty ratio could be expressed analytically by proposed method.

  • PDF