• Title/Summary/Keyword: Map construction

Search Result 1,021, Processing Time 0.026 seconds

Characteristics of Magnetic Resonance-Based Attenuation Correction Map on Phantom Study in Positron Emission Tomography/Magnetic Resonance Imaging System

  • Hong, Cheolpyo
    • Progress in Medical Physics
    • /
    • v.31 no.4
    • /
    • pp.189-193
    • /
    • 2020
  • An MR-based attenuation correction (MRAC) map plays an important role in quantitative positron emission tomography (PET) image evaluation in PET/magnetic resonance imaging (MRI) systems. However, the MRAC map is affected by the magnetic field inhomogeneity of MRIs. This study aims to evaluate the characteristics of MRAC maps of physical phantoms on PET/MRI images. Phantom measurements were performed using the Siemens Biograph mMR. The modular type physical phantoms that provide assembly versatility for phantom construction were scanned in a four-channel Body Matrix coil. The MRAC map was generated using the two-point Dixon-based segmentation method for whole-body imaging. The modular phantoms were scanned in compact and non-compact assembly configurations. In addition, the phantoms were scanned repeatedly to generate MRAC maps. The acquired MRAC maps show differently assigned values for void areas. An incorrect assignment of a void area was shown on a locally compact space between phantoms. The assigned MRAC values were distorted using a wide field-of-view (FOV). The MRAC values also differed after repeated scans. However, the erroneous MRAC values appeared outside of phantom, except for a large FOV. The MRAC map of the phantom was affected by phantom configuration and the number of scans. A quantitative study using a phantom in a PET/MRI system should be performed after evaluation of the MRAC map characteristics.

Geological Structure Related to Seoul Sub-way Construction. (서울지하철공사와 암반구조)

  • Lee Su Gon
    • Explosives and Blasting
    • /
    • v.10 no.3
    • /
    • pp.8-25
    • /
    • 1992
  • On the Sub- way Construction It is important to Survey in advance the Geological Structure and also to make the Engineering Geological map this paper deseribs the feature of Geological structure of Seoul Area and analyses the recently occured Rock falling acciudents. NATM Tunnelling always must be done with careful observation and measurement of the geological condition.

  • PDF

Efficient Management of Tunnel Construction Informations using ITIS(Intelligent Tunnelling Information System) (ITIS를 활용한 효율적인 터널 정보화 시공 관리)

  • Kim, Chang-Yong;Hong, Sung-Wan;Bae, Gyu-Jin;Kim, Kwang-Teom;Son, Moo-Rak;Han, Byeong-Hyeon
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2004.03b
    • /
    • pp.946-951
    • /
    • 2004
  • ITIS is applied to the several tunnel construction sites in Korea. Tunnel construction properties which are acquired from these sites are transferred to information management server(SQL 2000 server)by client application program in real time. Access permission to DB server depends on the user's roles. Some functions which cannot be embodied in SQL Server are serviced through XML and GMS server is used for spatial data based on GIS part. This system is supposed to give engineers the advantages which are not only easy handling of the program and computerized documentation on every information during construction but also analyzing the acquired data in order to predict the structure of ground and rock mass to be excavated later and show the guideline of construction. Neung-Dong tunnel and Mu-Gua express way tunnel are now under construction and with this system they have 3D visualized map of the geology and tunnel geometry and accumulate database of construction information such as tunnel face mapping results, special notes and pictures of construction and 3D monitoring data, all matters on the stability of rock bolts and shotcrete, and so on. Ground settlement prediction program included in ITIS, based on the artificial neural network(ANN) and supported by GIS technology is applying to the subway tunnel. This prediction tool can make it possible to visualize the ground settlement according to the excavation procedures by contouring the calculated result on 3D GIS map and to assess the damage of buildings in the vicinity of construction site caused by ground settlement.

  • PDF

Geological Map Database Construction Using GIS (GIS를 이용한 지질도 데이터베이스 구축에 관한 연구)

  • 이사로;최위찬;민경덕
    • Spatial Information Research
    • /
    • v.7 no.1
    • /
    • pp.147-153
    • /
    • 1999
  • Geological map and data are needed for land use planning, resources development, geological hazard prevention, environment protection and education, Since the nationwide geological database in Korea has not been constructed yet, there are many problems in using the geological map and data. There are many problems such a stratigraphy unestablishment, map conservation and edge matching in geological paper map. Therefore it is difficult to construct the geological map database, but the geological map database must be constructed as soon as possible as one of national thematic map. In this study, geological maps of pilot area such as Ansung geological map on a scale of 1:50,000, Busan on a scale of 1:250,000, Namchang on a scale of 1:25,000 and the whole Korean peninsula on a scale of 1:1,000,000 were designed and constructed to database using Geographic Information System(GIS). In addition the geological map management program was developed by GIS program. The digital geological maps were produced using the constructed geological database. The database could be of access through Internet World Wide Web(WWW) environment and be distributed in Compact Disk(CD).

  • PDF

Automated Generation of Multi-Scale Map Database for Web Map Services (웹 지도서비스를 위한 다축척 지도 데이터셋 자동생성 기법 연구)

  • Park, Woo Jin;Bang, Yoon Sik;Yu, Ki Yun
    • Journal of the Korean Society of Surveying, Geodesy, Photogrammetry and Cartography
    • /
    • v.30 no.5
    • /
    • pp.435-444
    • /
    • 2012
  • Although the multi-scale map database should be constructed for the web map services and location-based services, much part of generation process is based on the manual editing. In this study, the map generalization methodology for automatic construction of multi-scale database from the primary data is proposed. Moreover, the generalization methodology is applied to the real map data and the prototype of multi-scale map dataset is generated. Among the generalization operators, selection/elimination, simplification and amalgamation/aggregation is applied in organized manner. The algorithm and parameters for generalization is determined experimentally considering T$\ddot{o}$pfer's radical law, minimum drawable object of map and visual aspect. The target scale level is five(1:1,000, 1:5,000, 1:25,000, 1:100,000, 1:500,000) and for the target data, new address data and digital topographic map is used.

A Study on the Construction of 3D GIS DB by LiDAR (LiDAR에 의한 3차원 GIS DB 구축에 관한 연구)

  • Yoon, Hee-Cheon;Park, Joon-Kyu
    • Journal of the Korean Association of Geographic Information Studies
    • /
    • v.10 no.2
    • /
    • pp.172-183
    • /
    • 2007
  • Recently geospatial information has used widely in many areas such as effective use and management of national land, establishment of city planning, managements of environments and disasters, etc. But present digital map is not suitable for nowadays because of delay of information renewal and changes of topography. In this study, GIS DB construction method was researched through the process of extracting main vector layers such as buildings, roads, contours, etc. from LiDAR data. In order to analyze accuracies of constructed data, the digital topographic maps of 1:1000 scale which were produced by Korea National Geographic Information Institute(NGI) and results of GPS survey were used. Effective DB construction method was suggested through comparing with existing GIS DB construction methods.

  • PDF

Utilizing noise mapping in environmental impact assessment in a downtown development area (도심지 개발사업에 따른 환경영향평가시 소음지도 적용방안에 관한 연구)

  • Lee, Shi-Won;Chang, Seo-Il;Park, Younge-Min;Choi, Jin-Kwon
    • Proceedings of the Korean Society for Noise and Vibration Engineering Conference
    • /
    • 2005.05a
    • /
    • pp.535-540
    • /
    • 2005
  • In environmental impact assessment, noise impact assessment usually consists of three stages surveying the existing noise levels by measurements, predicting noise levels induced by construction works and predicting noise levels after the completion of project. When predicting noise level in urban area, this method does not consider acoustic phenomena like multi reflection, diffraction and absorption due to complex topographic configuration of building and terrains. For the purpose, a noise mapping tool is utilized to produce a series of noise maps, which are those for the present, for the works of construction and for the future. For accurate noise mapping, acoustical and topographic information is essential. Standard sound power levels and directivities of various construction equipments are required and scheduling of construction processes and locations of the equipments should be provided. In the case of exceeding legal limit, mitigation measures are applied to satisfy the legal limits and subsequent noise map is obtained and checked.

  • PDF

BIM and 4D planning: a holistic study of the barriers and drivers to widespread adoption

  • Kassem, Mohamad;Brogden, Trevor;Dawood, Nashwan
    • Journal of Construction Engineering and Project Management
    • /
    • v.2 no.4
    • /
    • pp.1-10
    • /
    • 2012
  • Building Information Modeling (BIM) and its different work streams, such as 4D planning (4D), are among the major drivers for change in the construction industry. The primary aim of this research is to create a holistic map of both the barriers and drivers affecting the industrial uptake of BIM and 4D through the use of an extensive literature review and a survey of contractors and consultants from the UK AEC (Architectural, Engineering and Construction) industry. This research demonstrates that while non-technical barriers such as the inefficiency in the evaluation of the business value of BIM and 4D; the shortage of experience within the workforce, and the lack of awareness by stakeholders are recognized by professionals as main barriers to BIM and 4D adoption, current research is still largely concerned with technical advancement of BIM and 4D technologies. A holistic map of the driving and restraining forces affecting BIM and 4D widespread adoption was provided. The tackling of the non-technical barriers identified will help bridge the gap between technology, end-users and their processes.

Mass curve Calculation of Constructed Section using GIS (지형공간정보시스템을 활용한 기시공 단면의 토적계산)

  • Lee, Yang-Kyoo;Bae, Sang-Ho;Han, Jung-Geun;Kang, Leen-Seok
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2007.11a
    • /
    • pp.739-742
    • /
    • 2007
  • For the mass evaluation on the earth cutting volume, Geographic information system(GIS) based on digital topographical map executed on the ground condition in presents states and after installing utilities, and making visual decision. This study presents that the general reviews considering economical, technological efficiency as well as natural factors was carried. To the rational examines about plan and procedure of development was approved, the geographical analysis was performed that was based on the topographical shape before construction and the field states after construction, which will be utilized more useful data for mass curve calculation.

  • PDF

Experimental Study on Satellite Image Restoration for Vanished Area by Dam Construction

  • Yeon, Sang-Ho;Hong, Il-Hwa
    • Proceedings of the KSRS Conference
    • /
    • 2003.11a
    • /
    • pp.1424-1426
    • /
    • 2003
  • It will be a real good news for the people who were lost their hometown by the construction of a large dam to be restored to the former state. Focused on Cheung-Pyung around where most part were flooded by the Chungju large Dam founded in early 1980s, we used Remote Sensing Technique in this study in order to restore topographical features before the flood with 3 dimensional effects. We gathered comparatively good satellite photos and remotely sensed digital images, then we made a new color image from these and the topographical map which had been made before the flood. This task was putting together two kinds of different timed images. And then, we generated DEM including the outskirts of that area as harmonizing current contour lines with the map. That could be a perfect 3D image of Cheung-Pyung around before when it had been flood by making perspective images from all directions, north, south, east and west, for showing there in three dimensions. Also, flying simulation we made for close visiting can bring us to experience their real space at that time.

  • PDF